HomeMy WebLinkAbout5C - Th 13 Corridor Study
CITY COUNCIL AGENDA REPORT
SUBJECT:
JULY 6,1998
5C
GREG ILKKA, DIRECTOR OF PUBLIC WORKS/CITY
ENGINEER
CONSIDER APPROVAL OF RESOLUTION 98-XX
APPROVING A LONG TERM ACCESS AND
DEVELOPMENT PLAN FOR TRUNK HIGHWAY 13, AS
AMENDED FOR FRANKLIN TRAIL INTERSECTIONS.
DATE:
AGENDA #:
PREPARED BY:
DISCUSSION:
HISTORY
A State Highway 13 Task Force, comprised of'
representatives of MnDOT, Scott County, Prior Lake and
Savage conducted a corridor study on Trunk Highway 13
from the south limits of Prior Lake, north to Highway 101 in
Savage. The results of that study were presented to the
governing bodies of each of the local governments in the fall
of 1996 in the form of a Long Term Access and
Development Plan. The Prior Lake City Council at the time
approved the plan with modifications. A copy of the
approving resolution is attached to this report. The Council
wanted full access at intersections at Franklin Trail North for
Norex I Lakers, and Franklin Trail South for Anna Trail. This
modification was unacceptable to MnDOT who did not
approve the plan and requested that Prior Lake re-consider
their position.
In February of 1998 the EDA considered options at Franklin
Trail North and South. The EDA requested City staff meet
with the MnDOT Project Manager to discuss these options at
Franklin Trail, North and South to determine if they would be
acceptable to MnDOT. At the meeting the City proposed for
MnDOT's consideration and evaluation, an intersection
configuration at Franklin Trail (north) that would provide
raised median channelization for free left turn lanes for both
north (to Lakers) and southbound (to Franklin Trail) TH 13
traffic. The restricted movements would then be the left turn
out of Lakers to northbound TH 13 and the left turn out of
Franklin Trail to southbound TH 13. There was some
162001~le Creek Ave, S.E., Prior Lake, Minnesota 55372-1714 / Ph, (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
misunderstanding of the plan at Anna Trail, and MnDOT
confirmed they did not intend to close the existing access to
Anna Trail, and they would not implement restrictions to
Franklin Trail access until after the City's "Ring Road"
connection was completed. Therefore, Franklin Trail South
was a non-issue.
CURRENT CIRCUMSTANCES
MnDOT has accepted the proposals and revised the plan
accordingly. A copy of the revised plan is included with this
agenda report. MnDOT is now requesting City approval of
the revised plan. The plan is identical to the previously
debated plan with the exception of the Franklin Trail
intersections as previously discussed.
Approval of the plan will enable both the City and MnDOT to ,
better plan and participate in improvement projects in the
future (i.e., EVP systems and intersection improvments).
ISSUES
As previously discussed, the issues were access
configuration at Franklin Trail, both North and South. With
MnDOT acceptance of the Franklin Trail North proposal and
clarification of the intentions at Franklin Trail South there are
no further issues that staff is aware of.
CONCLUSION
The revised plan addresses the City's concern about access
at both Franklin Trail North and South. Approval of the plan
will enable the City to propose improvement projects to
MnDOT for Municipal Agreement funding. The installation of
Emergency Vehicle Pre-emption systems at all Highway 13
intersections is such a project. Staff highly recommends
approval of the Long Term Access and Development Plan
as amended for Franklin Trail intersections.
ALTERNATIVES:
There are two alternatives for the City Council to consider:
1. Approve Resolution. 98-XX approving a Long Term
Access and Development Plan for Trunk Highway 13, as
amended for Franklin Trail intersections.
nll3,DOC
RECOMMENDED
MOTION:
REVIEWED BY:
TIlI3.DOC
2. Table this item for a specific reason and provide staff with
directiorr.
3. Deny this item for a specific reason and provide staff with
direction.
A motion and second to approve Resolution 98-XX
approving a Long Term Access and Development Plan for
Trunk Highway 13, as amended for Franklin Trail
intersections.
~
RESOLUTION 98-XX
A RESOLUTION APPROVING A LONG TERM ACCESS AND DEVELOPMENT PLAN
FOR TRUNK HIGHWAY 13, AS AMENDED FOR FRANKLIN TRAIL
INTERSECTIONS.
MOTION BY:
SECOND BY:
WHEREAS, the City has worked with MnDOT; Scott County, and the City of Savage to
prepare a Long Term Access and Development Plan for State Highway
13,and
WHEREAS, public informational meetings were held in 1996, and
WHEREAS, an approved Long Term Access and Development Plan enhances the
potential for MnDOT participation in funding proposed improvements to
State Highway 13, and
WHEREAS, approval of the Long Term Access and Development Plan will help the
City, its businesses and residents plan for the future.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA, the Long Term Access and Devlopment Plan prepared by MnDOT and
the State Highway 13 Task Force and as shown on Exhibit A (attached), is hereby
approved.
BE IT FURTHER RESOLVED, the City shall plan for a trail to be added along the entire
length of Highway 13.
Passed and adopted this 6th day of July, 1998.
YES
NO
Mader
Kedrowski
Petersen
Schenck
Wuellner
Mader
Kedrowski
Petersen
Schenck
Wuellner
{Seal}
Frank Boyles
City Manager
City of Prior Lake
TIlI3.DOC
RESOLUTION 96-77
A RESOLUTION APPROVING T.H. 13 CORRIDOR STUDY
MOTION BY:
Schenck
SECOND BY:
Kedrowski
WHEREAS, the City has conducted four informational meetings to receive input from the
public, and
WHEREAS, the City received public input at the July 15, 1996 Council meeting, and
WHEREAS, MnDOT will participate in funding of the intersection improvements if a T.H.
13 Corridor Study is approved by the City, and
WHEREAS, the adoption of the T.H. 13 Corridor Study will help businesses and residents to
plan for the future
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE that it does
hereby approve the T.H. 13 Corridor Study as shown on Exhibit A with the following additions:
1. A trail be added along the entire length of Highway 13 and
2. There be full access at intersections shown at Franklin Trail North for Norex / Lakers and at
Franklin Trail South for Highway 13 / Anna Trail intersection to maintain access to Prior Lake
business areas.
Passed and adopted this 16th day of September, 1996.
YES
X
X
X
X MADER-L'J
X_ ~N~Jl
( l'
~tlJ
NO
ANDREN
GREENFIELD
KEDROWSKI
MADER
SCHENCK
ANDREN
GREENFIELD
KEDROWSKI
{ Seal}
l~~~eek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
~LJ~~ [}{Jo@[}(JW~W 4)~ lY~~ ~~
~~~@ [L@[f!J@ ~~[ThJJ
~Cb~~~ ~@ [Q)~[!JQ)~~OOlJ ~
PriortyA
Corw.dIon 01 Candy Cow. Trai
"lleaoulh..atTH 13
............
-.,c
dI.dn.. ,
..conr.c:tiDnof""
'aft Sf.....1rom T.H.. 13
Not.: Coat patticlpation by
thl city 01 thl propeny
owner would b. reqWed ,_
the northbound Highway t 3
to Wutbound business
drivewayapeNng and turn
..,... to IN constructed.
--
Scale 1 m~e
,
AI.... _, .'.
toTH131hal.,.noc
. , .'wilbelhlhd
1o"'dgNlUmnMdrigN
......:
-----PolenIarnewro.dl,,~localioN
...... A
SlgnoiMg -.
~on.. ...01
Cully Ad. 23 wilfI F_...._
_c
~T_Tab\lt.PrilIrilIM
PriorirrA:I-3yurs
PrlortlyB:....O......
~C:l0-30......
It it anticipetad tNt tt.. cily
-Ring R~ in this .,..
would be completed bti'ore
inc.r.~ changu .,.
rMcM her..
-,
TMWnecablelotpriortyBandCprojedI.
d be dependenI on local . . , .
"'Ific___~ tICICkWt......
...-.........
...... c
FlIlInaocidenl~a.".IMJ""'In""'"
10 all., ... .s.gr.. of aoceu Ihowi on .. P'M.
MlndiwiduMlCIc.eaiaIw