CONSIDER APPROVAL OF RESOLUTION 98-XX
APPROVING PLANS AND SPECIFICATIONS AND
AUTHORIZING ADVERTISEMENT FOR BIDS FOR A
REPLACEMENT SUPERVISORY CONTROL AND DATA
ACQUISITION SYSTEM FOR THE CITY'S WATER
DISTRIBUTION SYSTEM.
AGENDA ITEM:
DISCUSSION:
HISTORY
At the April 7, 1997 Council meeting, the Council authorized
Bonestroo, Rosene, Anderlik, & Associates to provide the
required professional engineering services for the
completion of well #6, which is ongoing, the reconstruction
of wellhouse #3 and the associated water system
improvements which included replacing the SCADA
(Supervisory Control And Data Acquisition) system.
At the October 6, 1997 City Council meeting the Council
approved going forward with the reconstruction of well house
#3 and replacing the SCADA system prior to beginning
construction of well #6.
At the March 2, 1998 City Council Meeting the Council
approved the plans and specifications and authorized the
advertisement for bids for the reconstruction of wellhouse
#3.
At the April 6, 1998 City Council meeting the Council
awarded the reconstruction of wellhouse #3 to EnComm
Midwest, LLC. in the amount of $307,083.00. This was
$123,000 below the engineer's estimate.
CURRENT CIRCUMSTANCES
162~ Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
FISCAL IMPACT:
SCADA.DOC
':
Based on the Council action at the October 6, 1997 meeting
plans and specifications for the water SCADA system have
been prepared. Plans are available through the City's
consultant engineer (Bonestroo). Councilmembers
interested in reviewing these plans should contact the City
Engineer to arrange a review.
The new SCADA system will monitor the operation of, and
connect all of the City's key water distribution facilities via
radio to a main computer control center at the maintenance
center. These facilities include 3 well houses, two water
towers, and the Wilds booster station. The current system is
dependent upon the phone system which is subject to
interuption. The current main control center is located within
wellhouse #3 which requires personnel to go to this location
to check and monitor the water system. The current controls
have been corroded by the chemical environment in the
wellhouse and have been rendered unreliable.
ISSUES
Equipment lead time requires this contract be let now and
awarded as soon as possible in order to be installed upon
the completion of wellhouse #3.
A sanitary sewer SCADA system is currently programmed in
the 1999 C.I.P. (Capital Improvement Program). Both
SCADA systems will be monitored and controlled from the
same main computer at the maintenance center. The main
computer will be acquired now with the water system
SCADA system.
CONCLUSION
The current SCADA system is unreliable and requires
replacement in conjunction with the reconstruction of
well house #3. Replacement of the water distribution system
SCADA system was approved at the October 6, 1997
Council meeting. Plans and specifications have been
prepared and authorization for advertising for bids is
recommended.
The current estimate for the SCADA system is $162,000 and
is proposed to be funded through the Trunk Reserve Fund.
.,T~
ALTERNATIVES:
RECOMMENDED
MOTION:
REVIEWED BY:
SCADA.DOC
There will be no fiscal impact by this action. The impact will
be at time of contract award.
The alternatives for the Council to consider are:
1. Approve Resolution 98-XX approving plans and
specifications and authorizing advertisement for bids for
a replacement Supervisory Control And Data Acquisition
system for the Citys water distribution system.
2. Deny this item and provide staff with direction.
3. Table this item and provide staff with direction.
A motion and second to approve Resoluiton 98-XX
approving plans and specifications and authorizing
advertisement for bids for a replacement Supervisory'
Control And Data Acquisition system for the city's water
distribution system.
~
'.
RESOLUTION 98-XX
RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING
ADVERTISEMENT FOR BIDS FOR A REPLACEMENT SUPERVISORY CONTROL AND
DATA ACQUISITION SYSTEM FOR THE CITY'S WATER DISTRIBUTION SYSTEM
MOTION BY:
SECOND BY:
WHEREAS, it is proposed to replace the current water distribution SCADA system, and
WHEREAS, plans and specifications have been prepared for this project, and
WHEREAS, the City Public Works Department has reviewed the plans and specifications for
the replacement of the current water distribution SCADA system and recommends
approval.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA, plans and specifications for the replacement of the water distribution SCADA
system are hereby approved and advertisement for bids is hereby authorized.
Passed and adopted this 15th day of June, 1998.
YES
NO
Mader
Kedrowski
Petersen
Schenck
Wuellner
Mader
Kedrowski
Petersen
Schenck
Wuellner
{Seal}
Frank Boyles
City Manager
City of Prior Lake
162~ Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
~.q,j a- --,lll4ii'i;w';'m-,",ibiiUti1;~4_1. "'':1
;. lIlI.'.. ...............-,...,ili............ ." ,:
. ." ..,..~..diiIiiIi..o......... ,... ,. ' . Ii iii'