Loading...
HomeMy WebLinkAbout07-019 Motion By: Hedberg Second By: Millar WHEREAS, it is proposed to construct improvements for Industrial Circle, Credit River Road and Welcome Avenue including the construction of storm sewer, sanitary. sewer, watermain, aggregate base, concrete curb and gutter, bituminous surfacing, and appurtenant work; and WHEREAS, a petition of greater than thirty-five (35%) of the affected property owners has been received by the City for preparation of a feasibility study; and WHEREAS, the report will provide information regarding whether the proposed project is necessary, cost-effective, and feasible; and WHEREAS, The extension of utilities is necessary to protect the City's Wellhead Protection Area and to permit development in the Industrial Park. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. That the proposed improvements be referred to the City Engineer for study and that he is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvements are necessary, cost-effective and feasible and as to whether they should best be made as proposed or in connection with other improvements, and the estimated costs for the improvements as recommended. 3. That City Staff be authorized to solicit proposals for professional services for completion of the feasibility study. PASSED AND ADOPTED THIS 5TH DAY OF FEBRUARY 2007. YES NO Haugen X Hauaen Erickson X Erickson Hedbera X Hedbera LeMair X LeMair Millar X Millar I:\COUNCIL\RESOLUTI\ENG&PW RES\2007\07-019 Industrial Park Feasibility Study.doc www.cityofpriorlake.com Phone 952.447.9800 / Fax 952.447.4245