HomeMy WebLinkAbout6F Specialty Engineering Consultants
MEETING DATE:
AGENDA #:
PREPARED BY:
AGENDA ITEM:
DISCUSSION:
CITY COUNCIL AGENDA REPORT
FEBRUARY 20, 2006
6F
STEVE ALBRECHT, DIRECTOR OF PUBLIC WORKS
CONSIDER APPROVAL OF A RESOLUTION APPOINTING SPECIALTY
ENGINEERING CONSULTANTS FOR 2007
Introduction
The purpose of this agenda is for the City Council to appoint the City's specialty
engineering consultants for 2007.
Historv
On February 5, 2007 the City Council authorized staff to recommend
appointment of specialty engineering consultants for 2007. For specialty
services such as Lift Station Design, SCADA Support, Water System Analysis,
Groundwater Engineering, Construction Inspection, Wetland Services and Bridge
Inspection continuity is very important. These services require continuity from
project to project to ensure quality services from the City. For those reasons
staff proposes to appoint specialty technical services on an annual basis similar
to City finance and administrative consultants.
Current Circumstances
Because staff utilizes many of the specialty services on a weekly basis it is
important that certain appointments be made as soon as possible. Staff has
reviewed the City's current specialty consultants and recommends the following:
Service Consultant
SCADA - City's Technical Control Open - Currently SCS handles the
System for wells, water towers and City's SCADA needs. The City will be
booster stations upgrading our SCADA system as part
of the Treatment Plant Project and will
receive proposals during the project
and will recommend appointment of a
consultant at that time.
Lift Station - The City operates 38 lift AE2S - AE2S has been the City's Lift
stations. These operations require Station Consultant for several years
design services for repair and new and has provided responsive, quality
subdivision stations. and affordable service.
Water System Modeling - The City's Open - Currently AE2S handles the
water system is modeled on City's Water System Model. Staff will
computer. Staff, with the consultant's be evaluating new water system
assistance utilizes this model to models with the Treatment Plant
trouble shoot and improve system Project and will recommend
operations. appointment of a consultant at that
time.
R:\Agenda Reports\2007\02 20 07\Engineering Consultants agend~.cityofpriorlake.com
Phone 952.447.9800 / Fax 952.447.4245
ISSUES:
FINANCIAL
IMPACT:
Electrical Engineering - The City's
wells and lift stations operate using
complex electrical controls. Staff
utilizes a consultant to ensure proper
o eration.
Groundwater Engineering
(Hydrogeology) The City's
Wellhead Protection Plan and Water
Supply Plan are frequently updated
based on new geologic information.
The City utilizes a consultant to assist
with technical questions related to
groundwater engineering and
lannin .
Development and Erosion Control
Inspection All development
projects within the City are inspected
by a consultant on the City's behalf.
The cost for these services is paid by
developers through development
contracts.
Wetland Services - The City
processes several wetland related
projects annually. The City receives
technical support and delineation
reviews from a consultant.
Water Tower Technical Services -
The maintenance and operation of the
City's water towers requires technical
su ort from a consultant.
Bridge Engineer - Annually the City
of Prior lake must certify the lords
Street and Jeffers Pond brid es.
Kaeding Associates - Kaeding has
worked for the City on numerous
projects and is considered the
industry standard for electrical
s stems consultin .
Barr - Barr is currently under contract
with the City for the Wellhead
Protection plan. In addition to that
work they have assisted the City in
updating our Water Supply plan and
provide technical advice to the City on
groundwater operations.
Open - WSB is currently providing
this service to the City. As part of the
engineering pool staff will receive
proposals for the appointment of this
position. This will allow the City to
provide additional alternates to
Developers should they object to the
Cit 's a ointed consultant.
WSB - WSB has provided a high
level of service and value in this
specialty for several years. Staff has
worked with several other consultants
and believes WSB provides the best
service and value to the Cit .
KLM - KlM has provided the City
with a high level of service and value
on Water Tower Technical Services
for several ears.
WSB - WSB has provided the City
with a high level of service and value
on all brid e related activities.
Staff recommends appointment of the above listed firms for a period of 1 year to
be reviewed and renewed annually by the City Council. The appointments for
Development and Erosion Control Inspection and SCADA will be part of the
Engineering pool recommendations later this spring.
The listed services are considered important to the daily operations. The
majority of the services involve small projects and daily contact at hourly rates
paid for through the Professional Services budget items in the appropriate
departments. Continuity of service in these areas is also critical to service
delivery in the City of Prior lake. For that reason appointed consultants are
appropriate for these services.
Appointing these consultants does not have a budgetary impact. The Council
will award separate professional service contracts for work not included in the
annual operating budget.
R:\Agenda Reports\2007\02 20 07\Engineering Consultants agenda.doc
ALTERNATIVES: The alternatives are as follows:
1. Approve a resolution appointing the City's recommended Specialty
Engineering Services Consultants for 2007.
2. Deny this item for a specific reason and provide Staff with direction.
3. Table this item until some date in the future.
Alternative 1
R:\Agenda Reports\2007\02 20 07\Engineering Consultants agenda.doc
A RESOLUTION APPOINTING SPECIAL TV ENGINEERING CONSULTANTS FOR 2007
Motion By:
Second By:
WHEREAS, It is critical to daily operations of the City to have technical consultants available to City
Staff; and
WHEREAS, It is in the best interest of the City to appoint consultants in certain specialties annually;
and
WHEREAS, City Staff recommends the following appointments for 2007:
Consultant
AE2S
Kaedin Associates
Barr
WSB
KLM
WSB
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. The above listed consultants shall be appointed until December 31, 2007 for the listed specialty
engineering services.
PASSED AND ADOPTED THIS 20TH DAY OF FEBRUARY 2007.
Hauaen Haugen
Erickson Erickson
Hedbera Hedbera
LeMair LeMair
Millar Millar
YES
NO
Frank Boyles, City Manager
R:\Agenda Reports\2007\02 20 07\Engineering Consultants resolution.doc
www.cityofpriorlake.com
Phone 952.447.9800 / Fax 952.447.4245