Loading...
HomeMy WebLinkAbout11B 2007 Lift Station Rehabilitation project MEETING DATE: AGENDA #: PREPARED BY: AGENDA ITEM: DISCUSSION: ISSUES: 4646 Dakota Street S.E. Prior Lake, MN 55372-1714 CITY COUNCIL AGENDA REPORT FEBRUARY 20, 2007 11B CRAIG ELDRED, STREET AND UTILITIES SUPERVISOR CONSIDER APPROVAL OF A RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE CITY'S STANDARDIZED PROFESSIONAL SERVICES CONTRACT FOR ENGINEERING SERVICES FOR THE 2007 LIFT STATION REHABILITATION PROJECT Introduction The purpose of this agenda item is for Council to authorize execution of a Standardized Professional Services Contract with Advanced Engineering and Environmental Services, Inc. (AE2S) to provide Professional Engineering Services for the 2007 Lift Station Rehabilitation Project. Historv Because of the topography of the Prior lake community, the City's sewer system relies upon 40 lift stations. In 2003, AE2S Consulting Engineers along with City staff completed an audit of all the lift stations throughout Prior lake to ascertain the status and inventory the components of each lift station. Once completed, AE2S and staff put together a Comprehensive Management and Rehabilitation Schedule, and also instituted a Sanitary Sewer Lift Station Standard Policy. To date, 19 lift stations have been rehabilitated. Current Circumstances For the 2007 Lift Station Project, staff has identified Northwood and Fairview lift stations for rehabilitation. Rehabilitation includes replacement of pumps, guide rails, electrical panels, and other electrical components; wet well covers and hatches. Generally, the concrete wet wells are in good condition and do not require replacement. AE2S is the engineering consultant reviewing new development and rehabilitation of Prior lake's future and existing lift stations. Because the City's Lift Station Design is standardized the design requirements are very specific. Earlier tonight the City Council appointed AE2S as the City's Lift Station Consultant due to there expertise and experience working with the City's sanitary sewer system. AE2S submitted a proposal to prepare plans and specifications for the 2007 Lift Station Rehabilitation and perform construction engineering inspection for a cost not to exceed $34,100. AE2S will be using Kaeding and Associates to perform the electrical engineering work which is included in the proposal. R:\Agenda Reports\2007\02 20 07\2007 lift station rehabilitation project agenda.DOC www.cityofpriorlake.com Phone 952.447.9800 / Fax 952.447.4245 FINANCIAL IMPACT: The funding for this project will come from the Sewer Operating Fund since it is the rehabilitation of existing sewer infrastructure. Staff estimates the total cost of engineering, equipment and actual repairs to be approximately $240,000, which is drawn from the Sewer Operating Fund. Based upon the engineering inspection, equipment needing replacement is identified, and bids are solicited based upon standardized equipment. Once the Council has approved the bid, the work is completed and inspected. ALTERNATIVES: 1. Approve a resolution that authorizes the City to enter into its Standardized Professional Services Contract with Advance Engineering and Environmental Services, Inc. to provide engineering services for a fee not to exceed $34,100.00. 2. Table this agenda item for a specific reason. 3. Deny this agenda item for a specific reason and provide staff with direction. RECOMMENDED MOTION: Alternative #1 R:\Agenda Reports\2007\02 20 07\2007 lift station rehabilitation project agenda.DOC A RESOLUTION TO AUTHORIZE THE MAYOR AND CITY MANAGER TO EXECUTE THE CITY'S STANDARDIZED PROFESSIONAL SERVICES CONTRACT FOR ENGINEERING SERVICES FOR THE 2007 LIFT STATION REHABILITATION PROJECT Motion By: Second By: WHEREAS, City staff has identified two lift stations requiring rehabilitation this year; including Northwood and Fairview lift stations; and WHEREAS, The adopted Capital Improvement Plan for 2007-2011 has identified these rehabilitation projects as a priority for the City; and WHEREAS, Based on expertise, value and quality of service Advanced Engineering and Environmental Services has been appointed the City's Lift Station Consultant for 2007. WHEREAS, Advanced Engineering and Environmental Services, Inc. services, including final design, bidding, construction, and post construction are required for this project; NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. The Mayor and City Manager are authorized to execute the City's Standard Professional Services Contract with Advanced Engineering and Environmental Services, Inc. for the 2007 Lift Station Rehabilitation Project for a total fee not to exceed $34,100.00. 3. The funding for the contract is to be drawn from the Sanitary Sewer Operating Fund. PASSED AND ADOPTED THIS 20TH DAY OF FEBRUARY 2007. YES NO Haugen Haugen Hedberg Hedbera Erickson Erickson LeMair LeMair Millar Millar Frank Boyles, City Manager R\Agenda Reports\2007\02 20 07\1 2007 lift station rehabilitation reso.doc www.cityofpriorlake.com Phone 952.447.9800 / Fax 952.447.4245