Loading...
HomeMy WebLinkAbout10A - Purchase of Parks Utility Vehicles MEETING DATE: AGENDA #: PREPARED BY: AGENDA ITEM: DISCUSSION: 4646 Dakota Street S.E. Prior Lake, MN 55372-1714 CITY COUNCIL AGENDA REPORT APRIL 2,2007 10A AL FRIEDGES, PARKS & FLEET SUPERVISOR CONSIDER APPROVAL OF A RESOLUTION AUTHORIZING THE PURCHASE OF AN ALL UTILITY VEHICLE, STUMP GRINDER AND AN ELECTRIC SCISSOR LIFT Introduction The purpose of this agenda item is to authorize the purchase of one utility vehicle, stump grinder and an electric scissor lift. Historv Yearly, as part of the Capital Improvement Program (CIP), the City adopts an Equipment Replacement Fund and Matrix. The purpose of the Equipment Matrix is to identify and budget for equipment and vehicles that need replacement due to age or wear, or for additional equipment which needs to be purchased due to growth. All equipment identified in the matrix is subject to Council approval. The matrix identifies $19,096 for a utility vehicle and $16,974 for a stump grinder. Additionally, there is $29,000 identified for a fork lift. Current Circumstances Utility Vehicle Currently, the Parks Maintenance Division of Public Works utilizes four utility vehicles in the fleet: 1. A 1998 Cushman Truckster Field Line Striper This piece of equipment is equipped with a field line striper designed for applying liquid line marking paint on football, soccer, baseball and softball fields. 2. A 2003 Cushman Truckster Herbicide Sprayer This vehicle is designed for applying herbicides and chemicals for turf management and weed control. This sprayer can be calibrated for precise herbicide distribution and contact. 3. A 2003 Cushman Truckster Field Groomer This utility vehicle is equipped with a field drag for grooming aglime infields. Staff also utilizes this piece of equipment for all aspects of field maintenance (i.e. hauling field chalking equipment, edging, hauling aglime for top dressing, etc). 4. 2005 Cushman Truckster This utility vehicle is equipped with a 150 gallon poly tank, pump and hose reel for watering plant materials and hanging baskets throughout the City park system, public facilities and downtown plantings. This vehicle is utilized for watering purposes 8 hours per day and weekends as well. Because of R:\Council\Agenda Reportsl2007\04 02 07\utility vehicle stump grinder and electrical scissor lift agenda.doc www.cityofpriorlake.com Phone 952.447.9800 / Fax 952.447.4245 Because of the onboard tank and long hours of usage, this equipment is not convertible for other purposes. The utility vehicle that staff is proposing to add to the fleet will be utilized by the landscape crew for weeding, mulching, hauling and planting flowers and plant material, pruning, trimming and general maintenance and clean up around the City's facilities. This year in particular the vehicle will assist for all downtown plantings, existing and new rain gardens (more than 1,000 plants), the police station and city hall properties in addition to many park entrances and monument signage. As with all the utility vehicles, these are critical pieces of equipment for park maintenance operations and employee transportation throughout the summer months. There is $19,096 identified for the purchase of a utility vehicle. Stump Grinder With the increase of dutch elm and oak wilt disease in City parks and boulevards and the need to remove stumps and roots along the trail system, City staff is requesting the purchase of a stump grinder. In the past, the City has hired out stump removal operations. Because of the cost, City staff has limited stump removals to areas around high-use parks only. Stumps remaining in the park system and along trail corridors are restricting mowing operations, are unsafe, unsightly and do not comply with the City's shade tree disease program. Currently, staff estimates that approximately 400-500 stumps should be removed. The cost to hire out stump grinding and removals is $3.00 per inch. (Example- 20" diameter stump is $60.00) This does not include clean up or backfilling the hole. Assuming 500 stumps at an average diameter of 8" each and a charge of $3.00 per inch, the cost to contract for this grinding would be $12,000. Lastly, in order to combat tree disease removals in a timely fashion and remove hazardous stumps, the stump grinder is designed to achieve these duties. There is $16,974 identified for the purchase of a stump grinder. Electric Lift There was $29,000 identified in the 2006 Equipment Matrix for the purchase of a fork lift. Since that time, staff decided to conduct more research as to whether or not a fork lift was a justifiable purchase of equipment. In order for City maintenance staff to safely perform maintenance functions in high areas of public buildings, it was decided that an electric lift would be safer and more effective and economical. The proposed lift has the capabilities to extend 25 feet high, is equipped with safety railing around the work platform and has the maneuverability to be utilized indoors. R\Council\Agenda Reports12007\04 02 07\utility vehicle stump grinder and electrical scissor lift agenda.doc The electric lift would be utilized for changing light bulbs and ballasts, cleaning, painting, installing equipment, sprinkler maintenance and inspections, etc. Currently the City is prohibited from completing many of these activities without rental of a lift. The Maintenance Center, Lakefront Park pavilion, Fire Station, Police Station and City Hall all have ceilings that require a lift for safe maintenance access. The proposed Water Treatment Facility and Fire Station #2 will also require use of this equipment. Currently the City pays $133 for City rental and $250 per occurrence for rental by the mechanical contractor. Just to complete the minimum maintenance activities listed above, staff estimates an annual cost of $5,000 to $6,000 for lift rental. ISSUES: The City of Prior Lake has been making strong efforts to develop and maintain City property, parks and play fields in an environmentally responsible and aesthetically pleasing manner. With the completion of Phase I Downtown Streetscape Improvement Project (Phase II on the horizon), the new City Hall and Police Station and the future proposed Fire Station and Water Treatment Facility, an additional utility vehicle is needed to perform landscape operations. This piece of equipment would be compact, versatile and light enough to perform these functions. The stump grinder entails a one year return on investment. The electric lift is needed to perform the necessary maintenance tasks to keep public buildings operating to their fullest potential and will have a three year or less return on investment. FINANCIAL IMPACT: There is $19,096 identified for a utility vehicle, $16,974 for a stump grinder, and $29,000 for a fork lift in the equipment matrix and CIP. Staff proposes to utilize the new loader with forks to replace the fork lift. It has therefore been eliminated from the matrix. Staff recommends use of that funding for a much needed electric lift. The funding source is identified as the Revolving Equipment Fund. The following quotes were received: Utilit vehicle Vendor Make Model 2 wa radio Subtotal Tax TOTAL Lano E ui ment Kubot RTV 110 $ 426.0 $ 17,955.0 $ 1,167.01 $19,122.01 Lano E ui ment Bobca 230 $ 426.0 $ 18,972.0 $ 1,233.1 $ 20,205.1 Turf Werks Cushma Truckste $ 426.0 $ 25,047.0 $ 1,628.0 $ 26 675.0 The quotes are $7,553.05 different from high to low. Including tax, the low quote amount is $19,122.01 from Lano Equipment for the Kubota utility vehicle. R\Council\Agenda Reports12007\04 02 07\utility vehicle stump grinder and electrical scissor lift agenda.doc Stum rinder Vendor Make Model Subtotal Tax TOTAL Trenchers Plus Ra c RG-163 $ 15,420.0 $ 1,002.3 $ 16,422.3 Scharber & Sons Carlto SP-401 $ 16,150.0 $ 1,049.7 $ 17,199.7 Vermeer, Inc. Vermee SC-35 $ 20,620.0 $ 1,340.3 $ 21 960.3 The quotes are $5,538.00 different from high to low. Including tax, the low quote amount is $16,422.30 from Trenchers Plus. Electric lift Vendor Make Model Subtotal Frei ht Tax TOTAL Road Machine JL 2630E $ 13,287.0 Nt $ 870.1 $ 14,257.1 JL 2630E $ 13,950.0 Nt $ 906.7 $ 14 856.7 United Rentals JL 2630E $ 13,458.4 $ 500.0 $ 907.3 $ 14,865.7 ler The quotes are $608.63 different from high to low. Including tax, the low quote amount is $14,257.16 from Road Machinery. ALTERNATIVES: 1. Approve a resolution authorizing: ~ The purchase of one 2007 Kubota utility vehicle from Lano Equipment for $19,122.01 ~ The purchase of one 2007 Rayco stump grinder from Trenchers Plus for $16,422.30 and ~ The purchase of one 2007 JLG electric lift from Road Machinery for $14,257.16. 2. Table this agenda item for a specific reason. 3. Deny this agenda item for a specific reason and provide staff with direction. RECOMMENDED MOTION: Alternative #1. Reviewed by: Steve Albrecht, Public Works Director/City Eng. R:\Council\Agenda Reportsl2007\04 02 07\utility vehicle stump grinder and electrical scissor lift agenda.doc Motion By: Second By: WHEREAS, The City of Prior Lake is committed to maintaining City property, parks and playfields and natural resources in an environmentally responsible and aesthetically pleasing condition; and WHEREAS, The purchase of a utility vehicle, stump grinder and electric lift will significantly improve the City's ability to maintain City property, parks, playfields and natural resources; and WHEREAS, Quotes have been solicited and received, pricing is as follows: UtTt h' I Ilty ve Ice Vendor Lano Equipment Lano Equipment Turf Werks Make Kubot Bobca Cushmar Model RTV 110 230 Truckste 2 way radio $ 426.0 $ 426.0 $ 426.0C Subtotal $ 17,955.0C $ 18,972.0 $ 25,047.0C Tax $ 1,167.01 $ 1,233. H $ 1,628.0E TOTAL $ 19,122.01 $ 20,205.1 f $ 26,675.0E St . d ump gnn er Vendor Trenchers Plus Scharber & Sons Vermeer, Inc. Make Raycc Carltor Vermee Model RG-163 SP-401 ' SC-35' Subtotal $ 15,420.0 $16,150.0 $ 20,620.0 Tax $ 1,002.3 $ 1,049.7 $ 1,340.3 TOTAL $ 16,422.3C $ 17,199.7f $ 21,960.3C Electric lift Vendor Road Machinery Ziegler United Rentals Make JLG JLG JU Model 2630EE 2630EE 2630E Subtotal $ 13,287.0 $ 13,950.0 $ 13,458.4 Freight N/ Nt $ 500.0 Tax $ 870.1 $ 906.7 $ 907.3 TOTAL $ 14,257.1E $ 14,856.7E $ 14,865. 7~ WHEREAS, The quote for the 2007 Kubota utility vehicle from Lano Equipment in the amount of $19,122.01 including tax is recommended; and WHEREAS, The quote for the 2007 Rayco stump grinder from Trenchers Plus in the amount of $16,422.30 including tax is recommended; and WHEREAS, The quote for the 2007 JLG electric lift from Road Machinery in the amount of $14,257.16 including tax is recommended; R\Council\Agenda Reportsl2007\04 02 07\utility vehicle stump grinder and electrical scissor reso.doc www.cityofpriorlake.com Phone 952.447.9800 / Fax 952.447.4245 NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. Staff is directed to place an order with ~ Lano Equipment for one 2007 Kubota utility vehicle for a total amount not to exceed $19,122.01 ~ Trenchers Plus for one 2007 Rayco stump grinder for a total amount not to exceed $16,422.30 and ~ Road Machinery for one 2007 JLG electric lift for a total amount not to exceed $14,257.16. 3. Funds for these purchases shall be drawn from the Equipment Fund. PASSED AND ADOPTED THIS 2ND DAY OF APRIL 2007. Hauaen Hauaen Erickson Erickson Hedbera Hedbera leMair leMair Millar Millar YES NO Frank Boyles, City Manager R\Council\Agenda Reportsl2007\04 02 07\utility vehicle stump grinder and electrical scissor resodoc