Introduction
The purpose of this agenda item is to hold a Public Hearing for the County
Road 12 / Trunk Highway 13 Improvement Project and authorize the
preparation of plans and specifications. Approval requires a 4/5ths vote.
Historv
At the September 18, 2006, City Council meeting, the Council adopted
Resolution No. 06-172 authorizing staff to prepare a Feasibility Report for the
County Road 12 and Trunk Highway 13 Improvement Project as approved by
the Council in the 2007-2011 Capital Improvement Program (CIP). At the City
Council meeting on February 20, 2007, the City Council adopted Resolution
07-026 accepting the Feasibility Report and establishing the Public Hearing.
This segment of CR 12 proposed for improvement is located in the southwest
corner of the City of Prior Lake from Trunk Highway 13 to Pheasant Meadow
Lane. The intersection of CR 12 and TH 13 along with portions of TH 13 will
also be reconstructed. A map of the project area is shown on Exhibit 1 of the
Feasibility Report. This is Phase No. 2 of the County Road 12 project.
Phases 3 and 4 are scheduled for construction in 2010. Phase NO.3 is from
Pheasant Meadow Lane to County Road 81. Phase NO.4 is from Shoreline
Lane to County Road 17. Phase No. 1 was constructed in 2006 with the
Stemmer Ridge development project from County Road 81 to Shoreline Lane.
The proposed project includes street reconstruction, addition of turn lanes and
medians, storm sewer, concrete curb and gutter and appurtenant work.
Sanitary sewer on County Road 12 is proposed to be replaced from Pheasant
Meadow Lane to the sanitary manhole located at 3737 County Road 12.
Existing watermain is proposed to remain in-place with additional watermain
added at the intersection of CR 12 and TH 13. A new storm water pond is
proposed for the northwest corner of CR 12 and TH 13.
www.cityofpriorlake.com
Phone 952.447.9800 / Fax 952.447.4245
Current Circumstances
The purpose of the Public Hearing is to determine if the project should move
forward to the next step in the process. The Public Hearing will cover the
reconstruction of County Road 12 from Trunk Highway 13 to Pheasant
Meadow Lane.
Details of the project and the proposed financing were part of the Feasibility
Report presented to the City Council on February 20, 2007. A public
informational meeting was held on March 14, 2007. No persons attended this
meeting.
While this is the official approval for the preparation of plans and specifications
for this project, the consultant for Scott County Highway Department has
already completed the preparation of the plans and specifications. City Staff
has worked closely with the consultant during the design so that the
improvements meet City Standards. On County Roadway projects, once we
approve the geometric layout, the County begins final design. In this case the
City approved the geometric layout on February 6, 2006. The County began
the preparation of the final design plans at that point. On normal County Road
projects, the next time the City Council reviews a project is when they are
accepting the final plans and authorizing the cooperative agreement.
It may seem that the process is out of order on this project, but because we
are assessing the City portion of this project, the City must follow an additional
process in order to assess for the improvements. This additional process must
follow the Minnesota Statute 429. Part of the 429 process includes the
preparation of a Feasibility Report, conducting a Public Hearing, and passing a
resolution ordering the improvements and authorizing the preparation of plans
and specifications. The City is using estimates generated by the consultant for
the project to compute the assessment. These estimates can not be obtained
until after the County has completed a portion of the design.
Normal County Roadway projects that are not funded in part by special
assessments would not need to follow this procedure.
ISSUES:
The Assessment Review Committee met on February 5, 2007, at which time
the following issues were discussed and recommendations made:
Street and Storm Sewer Reconstruction
Pursuant to the assessment policy, the street and storm sewer reconstruction
should be assessed at up to 40% of the total project cost against the 9
benefiting properties, based upon the special benefit created for each such
property.
Assessment Method
The Assessment Review Committee recommends the unit method of
assessment for County Road 12 due to the fact that the lots in the project area
are of similar size and/or value. The estimated assessment rate is proposed at
$6,107/unit.
Trail Construction
Trail construction be funded through the Capital Park Fund.
FINANCIAL
IMPACT:
The City's portion of the County Road 12 Improvement project cost is
proposed to be financed with special assessments, street oversize fund,
capital park fund, water quality fund, and trunk reserve funds. Funding
sources and amounts are as shown below:
Assessments $54,967.00
Street Oversize Fund $370,640.00
Trunk Storm Water Fund $139,093.00
Water Quality Fund $50,000.00
Capital Park Fund $60,479.00
Trunk Sewer & Water Fund $97,591.00
Utility Fund $100,000.00
Total City Cost $872,770.00
The chart shows the breakdown for the City's portion of the project cost. The
overall project cost is $872,770.00.
ALTERNATIVES:
The alternatives are as follows:
1. Conduct a Public Hearing and approve a resolution that orders the County
Road 12 / Trunk Highway 13 project and authorize staff to prepare plans
and specifications.
2. Table the Resolution for a specific reason.
3. Deny the Resolution.
RECOMMENDED
MOTION:
Alternative #1
Frank Boyles,
Reviewed by:
1J
ORDERING IMPROVEMENTS AND PREPARATION OF PLANS AND SPECIFICATIONS FOR
COUNTY ROAD 12 FROM TRUNK HIGHWAY 13 AND PHEASANT MEADOW LANE
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
Motion By:
Second By:
The Prior Lake City Council on its own initiative has determined that it desires to
complete the County Road 12 Project from Trunk Highway 13 to Pheasant Meadow
Lane; and
On February 20th, 2007, the City Council adopted Resolution 07-026 accepting the
Feasibility Report and calling for a Public Hearing to be held on the County Road 12
project from Trunk Highway 13 to Pheasant Meadow Lane which includes
improvements to the sanitary sewer, water main, storm sewer, aggregate base,
concrete curb and gutter, bituminous surfacing, and appurtenant work; and
The required mailed notice and published notice of the hearing was given and the
hearing was held on the 16th of April, 2007 at which time all persons desiring to be
heard were given an opportunity to be heard thereon; and
Since the project is initiated by the City Council it must be approved by 4/Sths vote in
accordance with Minnesota State Statutes 429.031 Subdivision 1 (t).
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. The City Engineer is hereby authorized to prepare plans and specifications for the improvements
delineated in City Council Resolution 07-026 adopted February 20, 2007, and by the required
statutory 4/Sths vote does hereby order the project.
3. The City Engineer is hereby designated as the Engineer for these improvements. The Engineer
shall prepare plans and specifications for making such improvements.
PASSED AND ADOPTED THIS 16th DAY OF APRIL 2007.
YES