CITY COUNCIL AGENDA REPORT
MEETING DATE: MAY 7,2007
AGENDA #: 9B
PREPARED BY: STEVE ALBRECHT, DIRECTOR OF PUBLIC WORKS
AGENDA ITEM: CONSIDER APPROVAL OF A RESOLUTION ACCEPTING THE CR 21
COMMERCIAUINDUSTRIAL DEVELOPMENT MASTER PLAN
DISCUSSION: Introduction
The purpose of this agenda item is to approve the Master Plan for
Commercial/Industrial Development along CR 21 between Fish Point Road and
Credit River Township.
History
On February 20, 2007 the City Council directed City Staff to develop a Master
Plan to evaluate the existing and the potential for future commercial/industrial
development along CR 21 between Fish Point Road and Credit River Township.
Current Circumstances
Staff has evaluated the following areas as part of this report (see attached Figure
1 ) :
A) Snell Property
B) Existing Industrial Park
C) Credit River Township Property
D) Abhe/Svoboda Property
It is important to recognize that the evaluation utilized the City's 2030
Comprehensive Plan. The 2030 Comprehensive Plan Land Uses are shown in
attached Figure 2. Utilizing the Comprehensive Plan and supporting studies staff
evaluated the above properties based on the following:
1) Existing developed acreage and potential for development or
redevelopment of commercial/industrial property.
2) Potential development based on the 2030 Camp Plan
3) Availability and future connection to roadway and utility infrastructure
4) Potential strategies to encourage orderly and desirable development of
the properties.
The study area also includes unique natural resource issues that had to be
evaluated in the plan. Figure 3 shows the bluff, shoreland and wellhead
protection areas which all impact the study area.
www.cityofpriorlake.com
Phone 952.447.9800 / Fax 952.447.4245
The following table summarizes the acreages of each property and potential use:
Property Gross Net Undeveloped 2030 Land Sewerl
Acreage Acreage Acreage Use** Water
Snell (A) 52 36 36 C-BO Available
R-LD
Industrial Park 67 33 12 I-PI Future"
(B)
Credit 44 34 32 None Future-
River (C)
Abhe/ 10 10 5.5 C-HG Available
Svoboda (D)
Total 173 113 85.5
*Not available to individual sites without City Project
** C-BO: Office Park
I-PI: Planned Industrial
R-LD: Residential Low Density
C-HG: Hospitality General Business
None: None presently
The net acreage deducts wetlands, flood plain, steep slopes and natural areas
not considered developable. The above table indicates that about 35% of the
property is not developable. This is consistent with similar properties in the City
based on the proximity to Markley Lake and other natural resources. The
undeveloped acreage which is 49% of the available land is property which is
currently not or only partially utilized. This amount does not consider
redevelopment potential.
Figure 1 also shows the potential roadway network to service these properties.
This is only conceptual but as it indicates all of the properties are accessible.
The proposed roadway network is consistent with the adopted CR 21 Corridor
Study.
ISSUES:
By the inclusion of the above properties in this plan staff believes they all are
feasible for development. However each of the properties being evaluated has
special circumstances or issues related to its development.
Snell Property (A)
Descriotion:
This property is located immediately north of Fish Point Road. As Figure 1
shows the future extension of Fish Point Road and Credit River Road will
complete the roadway network on this property. The County will be improving
Fish Point Road as part of the CR 21 project which will include a new signal and
frontage road connection to Credit River Road on the west side.
2030 Como Plan:
This property is currently guided as Business Office Park and Low Density
Residential. Based on the unique natural features on this property it will be a
prime candidate for a Planned Unit Development. The supporting roadway
network and utilities area in place for development of this property as guided.
Examples of C-BO development include Norex, On-site Engineering and EM
Products.
Issues:
This property is owned by the Snell Family and currently there are no plans staff
is aware of for development. Most likely development of this property will be
dependent on its sale to a private developer in the future.
The property does have some potential issues:
1) A majority of the developable land is located on the western
portion of the property. The central and eastern portions of the
site are dominated by wooded areas and steep slopes.
2) The future connection of the northern leg of Fish Point Road to
CR 21 could result in impacts to the roadway characteristic of the
existing segment of Fish Point Road south of CR 44. The traffic
impacts and potential channelization of business park traffic
should be carefully evaluated by the City at the time of
development.
3) This property is in the Markley Lake watershed which has strict
stormwater regulations to prevent flooding of township properties.
More restrictive stormwater requirements will impact potential
development as additional facilities and techniques must be
considered.
Recommendation:
At this time staff does not recommend any activity regarding this property.
However staff recommends engaging potential Developers early on to ensure to
highest and best use of this property for the City of Prior Lake. This approach
has been used successfully on properties such as Jeffers Pond, Hickory Shores,
Golden Ponds and Northwood Meadows all of which have similar development
concerns.
Industrial Park (B)
DescriDtion:
The existing Industrial Park has a combination of existing uses and vacant
property. The Prior Lake Baptist Church is also located in this area. With the
exception of the Church the area is zoned Industrial. The Church is currently
zoned R-1 Residential. The entire area is guided Industrial in the 2030 Comp
Plan.
2030 ComD Plan:
The I-PI zoning is intended to allow general industrial uses such as indoor
manufacturing, production, processing, storage and distribution of materials and
products.
Examples of I-PI development include the Greystone building and Busse Bus
Company in the Deerfield Industrial Park.
Issues:
The existing Industrial Park has numerous issues to be considered. Please note
that specifics related to providing paved streets, sewer and water to the Industrial
Park are part of the feasibility report which is the next item on the agenda. For
that reason this report touches the broader issues only:
1) The majority of the Industrial Park is located in or will be located in the
City's Wellhead Protection Area. Additionally due to the existing
topography and geology the most of the area is part of the High
Vulnerability zone of the Well Head Protection Area. For that reason
management of and elimination of existing wells and septic tanks should
be a high priority for the City. The City will be completing an inventory of
the area's potential hazards this summer as part of the Phase 2 Well
Head Protection requirements.
2) With the exception of the Church none of the properties have sewer or
water and are currently utilizing septic systems, holding tanks and private
wells. The County currently regulates the septic systems in Prior Lake.
Recognizing the environmental impacts the County will not allow
additional development of the Industrial Park unless the City extends
sewer.
3) The County has provided information regarding the existing septic
systems and has expressed concerns regarding the current condition.
Many of the systems were constructed prior to the current regulations and
essentially operate as cesspools or injection wells.
4) Currently there is several code issues in the Industrial Park related to
outside storage.
5) The Industrial Park does not have paved streets and will need to have
paved streets to attract development and re-development. Additionally
ongoing maintenance of this street is problematic as the larger vehicles
that serve these properties are beyond what the current gravel roads can
support.
6) This property is in the Markley Lake watershed which has strict
stormwater regulations to prevent flooding of township properties. More
restrictive stormwater requirements will impact potential development as
additional facilities and techniques must be considered.
7) The creation of a TIF District for the entire Industrial Park in its current
condition is not considered feasible as a means to fund improvements.
8) A large portion of the Industrial Park is within the shoreland district which
limits impervious surface to 75%.
Recommendations:
The detailed recommendations related to providing paved streets, sewer and
water to the Industrial Park are contained in the Feasibility Study. However staff
recommends that the Council consider an incremental approach allowing private
development to extend sewer and water to the Industrial Park. This will allow the
City at minimal cost to the tax payers to most expeditiously address the well head
protection issues. Additionally staff recommends that the Council address the
streets in the near future as recommended by the Feasibility Study. Staff also
believes that the Council should consider utilizing TIF on a building by building
basis to assist in funding the future streets and remaining sewer and water
improvements.
Credit River Township (C)
Description:
This area is comprised of 4 properties located immediately east of the City Limits
and north of CR 21. Combined these properties offer about 32 acres of
developable property. These properties are not in the City and are not included
in the 2030 Camp Plan. However their proximity to the City and undeveloped
nature make them prime candidates for City services and development.
2030 Comp Plan:
These properties are not in the 2030 Comp Plan. Annexation of these properties
would need to be done at the request of the property owners or by orderly
agreement with the township. Should these properties be annexed staff would
recommend a combination of C-BO and C-HG uses. These uses would provide
additional office and general business land immediately adjacent to CR 21.
Issues:
In considering the master plan for these properties the City Council should be
aware of the following issues:
1) These properties are not in the City and are not part of any annexation
agreement.
2) Sewer and water for these parcels will come from the Industrial Park
and therefore not available at this time.
3) The northern most portion of the area requires roadway extension from
the existing Industrial Park or through a wetland complex.
4) The types of uses will be limited as the City's sewer capacity in this area
will be limited to office and general business use. No businesses that
generate substantial amounts of wastewater would be feasible or
appropriate.
5) Credit River Township is currently considering incorporation as a City.
Recommendation:
Staff recommends that the Council initiate contact with Credit River Township to
make them aware of the potential for these properties. It is also recommended
that the City complete the improvements as recommended in the Feasibility
Study to ensure the opportunity for utility extension to these properties.
Abhe/Svoboda Property (D)
Description:
This property is located between the Deerfield Industrial Park and CR21. The
property currently has existing building and outside storage. Approximately 50%
of the property is undeveloped. The property is part of the Orderly Annexation
agreement. Due to concerns regarding code issues the property was not
annexed in 2004 according to the annexation schedule. Street, sewer and water
are all stubbed to within 150 feet of the property.
2030 Como Plan:
This property is guided C-HG. When it is annexed the existing use would be
considered nonconforming. However unless the property redevelops the
nonconforming use is allowed to remain subject to conditions setout in the City's
zoning ordinance. Enforcement of the County CUP for the property and code
violation issues would become the City's issue upon annexation.
Issues:
Several issues exist with this property.
1) The property is currently in violation of the County CUP. Upon annexation
code and CUP violations become the City's issues.
2) The property is within the City's wellhead protection area. The property is
currently served by a septic system and a well.
3) The existing use would be permitted upon annexation as existing non-
conforming use. The City would have no leverage beyond the existing
CUP to pursue cleanup.
4) Because the City utilities are within 150 feet of the property the City could
require connection to utilities within 1 year of annexation.
5) Development of the remaining 5 acres could be only be undertaken with
the requirement that the balance of the site to be brought into compliance
with City ordinances within an agreed upon time period.
Recommendation:
Staff recommends that the City engage the property owners to discuss the
annexation and the potential for a PUD which would allow development of the
undeveloped land and would require phased compliance of the existing use.
FINANCIAL
IMPACT:
This report does not recommend or specify any expenditures by the City.
However the potential for 85+ acres of new commercial/industrial development
within the City would meet several goals of the City's 2030 Vision and provides
opportunities to broaden the City's tax base and create jobs. In addition to the 85
new acres there is the potential for 25+ acres of redevelopment to occur
affording greater protection to the City's well field and Markley Lake.
ALTERNATIVES:
The alternatives are as follows:
1. Approve Resolution 07 -XX accepting the Master Plan and direct staff to work
with each property as specified in this report.
2. Table the Resolution for a specific reason.
3. Deny the Resolution.
RECOMMENDED Alternative #1.
MOTION:
4646 Dakota Street S.E.
Prior Lake, MN 55372-1714
RESOLUTION 07 -xx
RESOLUTION ACCEPTING THE CR 21 COMMERCIAUINDUSTRIAL DEVELOPMENT MASTER
PLAN
Motion By:
Second By:
WHEREAS, Orderly and quality commercial and industrial development along the CR 21 Corridor are
priorities for the City of Prior Lake; and
WHEREAS, The Master Plan agenda report identifies recommendations for the study area that will
meet goals of the City's 2030 Vision; and
WHEREAS, The City Council supports the recommendations of the Master Plan; and
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. City Staff is directed to work with potential developers of the Snell Property to ensure orderly and
quality development of the property.
3. City Staff is directed to proceed with Council directives in accordance with approval of the Industrial
Park Feasibility Study.
4. City Staff is directed to facilitate contact with Credit River Township and the study area property
owners regarding potential for City services.
5. The City Staff is directed to contact the owners of the Abhe and Svoboda property to discuss
annexation, potential development and phasing of site compliance.
PASSED AND ADOPTED THIS ih DAY OF MAY 2007.