Loading...
HomeMy WebLinkAbout3D - Prj #88-21, Duluth Ave Improvements I d ; " CONSENT AGENDA: PREPARED BY: SUBJECT: DATE: INTRODUCTION: BACKGROUND: HERITAGE 1891 COMMUNITY 1991 19J9})jV 2Q91 3 (d) BRUCE LONEY, ASSISTANT CONSIDER APPROVAL OF PROJECT #88-21, DULUTH NOVEMBER 5, 1990 CITY ENGINEER CHANGE ORDER NO. AVENUE IMPROVEMENTS l, During the course of construction for Project #88-21, additional work beyond the Contract was done by the Contractor. A Change Order for this additional work has been prepared and is enclosed in the Agenda packet for Council approval. The Contractor, Imperial Developers, Inc. and their subcontractors, have performed additional work which was not included in the original contract. The additional work is described and itemized costs are shown on the attached Change Order No. 1 from Toltz, King, Duvall, Anderson & Associates, the Project Engineer. A total of three (3) additional items are described with the total cost of the Change Order being $9,563.00. Item #1 was for the placement of street lighting conduit under Duluth Avenue and Item #2 was for the removal of a tree on City property in order to grade the property to the newly constructed street. Item #3 was for the CSAH 21 storm sewer repair which was needed when the Duluth Avenue storm sewer system was connected to the overall system. The existing CSAH 21 storm sewer pipe had settled and needed to be adjusted in order to have positive drainage. Scott County contributed $4,437.50 for their portion of the storm sewer repair cost. The total Change Order cost for approval previously mentioned is $9,563.00, while the actual cost to the City is that amount minus the Scott County participating amount of $4,437.50 or $5,125.50 being the actual City cost. The original contract amount for this project is $91,862.00 with the total amount of the Change Order being $9,563.00. This represents 4629 Dakota St. S.E" Prior Lake, Minnesota 55372 I Ph, (612) 447-4230 I Fax (612) 447-4245 RECOMMENDATION: BUDGET IMPACT: ACTION REQUIRED: a 10.4% increase in the original contract amount. The actual Chan<1e Order cost to the City is $5,125.50 and thl.s represents a 5.6% increase in the original contract amount. The recommendation is to approve Change Order #1. This amount will be paid from the Construction Fund and has been included with this month's Construction Voucher. Municipal state Aid Fund reimbursement will be applied for to cover the extra costs associated with this Change Order. Make a motion, Agenda, to approve #88-21 authorizing to sign the Change as part of the Consent Change Order #1 for Project the Mayor and City Manager Order. CHANGE ORDER TOLTZ, KING, DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED Engineers-Architects-Planners St, Paul, HN October 12. 19~, Comm. No. 9216 Change Order No. ~ To Imperial Deve1oper~. Inc. for Duluth Avenue Improv~ents (SAP 201-101-021 for City of Prior Lake. Minne~ota You ate hereby directed to make the following change to your contract dated April 3, , 19~. The change and the work affec~e~ th~r.by is subject to all contract stipulations and covenants. This Change Order will (increase) (4esceaee) (.Aet c.hangel the contract sum by Nine Thousand ~ive Hundred Sixty-three and - - - - no/100 Dollars ($ 9.563.00 ). The purpose of this change order is to provide for the repair of the storm sewer under CSAH No. 21 and other miscellaneous items not incluaeo i.n ~he original contract but were found to be required for proper const=:.:cti~n cf n,,~ 11th Avenue Improvements: 1. 2. Conduit Installation of Street Lighting, 1 LS 8 $ 300.00 Clear and Grub Tree on City property outside right-of-way 1 LS 8 $ 388.00 CSAH No. 21 Storm Sewer Repair (includes additional muck removal and time to check pipe elevations) 1 LS 8 $8,875.00 $ 300.00 $ 388.00 3. ~75.00 NET CHANGE (Add) $9,563.00 Amount of Original Contract $ Additions approved to date (Nos. $ Deductions approved to date (Nos. $ Contract amount to date $ Amount of this Change Order (Add) (~duGt) (~ C~aftg&d) $ Revised Contract Amount $ 91.862.00 0.00 0.00 91. 862.00 9.563.00 101,425.00 Owner TOLTZ, ~2N AND ASSOCIAT , I O. ORAT . By Richard N. Sobiech, P.E. Approved CITY O~ PRIOR LAKE, HN By Mayor/City Manager Date Approved IMPERIAL DEVELOPERS. INC. Contractor Date White - Owner* Pink - Contractor* Blue - TKDA* Yellow - Field Goldenrod - Department Green - TKDA Hain rile By *Only copies needing signatures.