Loading...
HomeMy WebLinkAbout3E - North Shore Oaks - Prj # 90-13 CONSENT AGENDA: PREPARED BY: SUBJECT: DATE: INTRODUCTION: BACKGROUND: RECOMMENDATION: HERITAGE 1891 COMMUNITY 1991 CUYJ.5fJ% 2Q9f 3 (e) BRUCE LONEY, ASSISTANT CITY ENGINEER CONSIDER APPROVAL OF CHANGE ORDER NO.1, PROJECT #90-13, NORTH SHORE OAKS IMPROVEMENTS NOVEMBER 5, 1990 During the course of construction for Project #90-13, additional work beyond the Contract was done by the Contractor. A Change Order for this additional work has been prepared and is enclosed in the Agenda packet for Council approval. The Contractor, CECA utilities, Inc. and their subcontractors, have performed additional work which was not included in the original contract. The additional work is described and itemized costs are shown on the attached Change Order No. 1 from Rieke, Carroll, Muller, Associates, Inc., the Project Engineer. A total of four (4) additional items are described with the total cost of the Change Order being $13,426.00. Items #1 and #2 were required due to wet subgrade soils that warranted removal of the wet soils and the addition of a geotextile fabric to provide support for the bituminous pavement. These items had contract unit bid prices in the bid proposal with no quantity estimated as it was uncertain whether or not these items would be necessar~. Item #3 was inadvertently left off the b1d proposal and would have been included as part of the contract work. Item #4 was for the bituminous paving of the pedestrian walkway thru the North Shore Oaks park. The original contract amount for this is $318,920.90 with the total amount Change Order being $13,426.00. represents a 4.20% increase in the contract amount. project of the This original The recommendation is to approve Change Order #1. 4629 Dakota St. S.E" Prior Lake, Minnesota 55372 / Ph. (612) 447-4230 I Fax (612) 447-4245 BUDGET IMPACT: ACTION REQUIRED: This amount will be paid from the Construction Fund and has been included with Project #90-13 assessment roll. This Change Order was anticipated at the time of the assessment roll and these costs were included in the amount assessed. Make a motion, Agenda, to aPl?rove #90-13 authorl.zing to sign the Change as part of the Consent Change Order #1 for Project the Mayor and City Manager Order. CHANGE ORDER NO.1 October 16, 1990 PROJECT: North Shore Oaks Second and Third Addition Utility Street Construction and Appurtenance Work Prior Lake, Minnesota Prior Lake Project No. 90-13 RCM Project No. 10078.02 TO: CECA Utilities You are hereby directed to make the changes noted below in the subject contract. NATURE OF CHANGE This change order COvers items that are required due to changes precipitated by unforeseen conditions of subgrade soils, items inadvertently left off bid proposal, and request by City Staff. fu.m 2 Item Descriotion llni1 Quantity Unit Price Amount Geotextile Fabric SY 800 1.50 $1,200.00 Subgrade Excavation CY 804 4.00 3,216.00 Subgrade Preparation Road Sta. 27 145.00 3,915.00 Bituminous Pedestrian Path LS 5,095.00 S.095.0Q $13,426.00 3 4 JUSTIFICA TION 1. Items 1 and 2 are required due to wet subgrade soils. These soils could not be dried out by the Contractor in a timely manner due to the time of year and cool temperatures. 2. Item 3 was inadvertently left off the Bid Proposal and is required according to the Project Specifications. 3. Item 4 is added at tbe request of City Staff for a pedestrian path through the City park. ADJUSTMENTS TO CONTRACT COSTS Contract Amount Prior to Change Order Net Increase Resulting From This Change Order Current Contract Amount Including This Change Order $318,920.90 13.426,OQ $332,346.90 By ?lRO~ &~uB:PROVED: ~actor Hayor/City Ka~ger