LARRY J. ANDERSON, DIRECTOR OF PUBLIC WORKS
CONSIDER APPROVAL OF TKDA CONTRACT
MAY 7, 1990
Due to a change in design standards, the Fish
Point Road/T.H. 13 Project has been split into
two projects, necessitating a change in TKDA's
contract.
Fish Point Road was constructed in 1979.
Since that time, MSA Standards have changed
due to smaller cars. The design height of the
driver's eye is now 0.25 feet lower than in
1979. This requires the curves to be slightly
flatter. To obtain MSA Funding for the
sidewalk portion of the project, a variance to
the standards is required. variance approval
is not expected to be a problem but may not be
obtained until August. The Variance Committee
meets approximately four (4) times per year
depending upon the number of variance
requests. The project cannot be approved by
MnDOT until the variance is approved. Staff
felt that the intersection improvements need
to commence prior to August.
Staff met with Chuck Weichselbaum from MnDOT
to determine the most expeditious method to
commence with the Fish Point Road/T.H. 13
improvements. The result of this meeting was
to split the project into two (2) complete
separate projects so that the intersection
improvements could commence earlier. The
other options were to delete the sidewalk
completely or pay for the sidewalk w/o using
MSA Funds. The sidewalk cost is
approximately $60,000.00.
On April 3, 1990, Staff directed TKDA to split
the project into two (2) projects, and told
TKDA that they would be compensated for their
4629 Dakota 51. 5.E., Prior Lake, Minnesota 55372 / Ph. (612) 447-4230 / Fax (612) 447-4245
efforts. The amount of compensation is
$6,000.00 and Staff feels that it is a fair
amount considering the extent of work
involved. Staff knew at the commencement of
this project that one of the curves was
originally deficient (28 m.p.h. vs. 30 m.p.h.)
and asked MnDOT if they could foresee any
problems, and they did not. At that time, it
was not known that the height of eye standard
change had caused several curves to be
deficient. This was determined during MnDOT
plan review.
By today's design standard, the curves are one
to two miles per hour short of thirty miles
per hour, which does not, in and of itself,
warrant reconstruction of the road.
DISCUSSION:
MnDOT Plans and specifications review is
nearly complete. Once complete, the
Cooperative Agreement will be completed and
submitted to the Council along with final
plans for approval. At this point, Staff
anticipates construction to commence in July.
Staff has directed TKDA to split the project
into two (2) projects to expedite the project.
The project has been separated and resubmitted
to MnDOT. Staff's decision to do this was
based upon the need to have this project
started earlier in the year versus September.
The attached contract authorizes payment for
the project being separated.
The recommendation is to approve the TKDA
contract.
RECOMMENDATION:
FINANCIAL IMPACT: The fees will be paid from the Construction
Fund.
ACTION REQUIRED:
Motion, as part of the
authorize the Mayor and
Supplemental Agreement No.
Consent Agenda, to
Manager to sign
3.
TOLTZ, lUNG, DUVALL, ANDERSON
AND ASSOCIATES, INCORPORATED
ENGINEERS-ARCHITECTS-PLANNERS
SAINT PAUL. MINNESOTA
APRIL 18, 1990
SUPPLEMENTAL AGREEMENT NO.3
between
THE CITY OF PRIOR LAKE, MINNESOTA
and
TOLTZ, KING, DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED
for
T.H. 13 FROM
CANDYCOVE~TOGREENOAKSTRML
and
FISH POINT ROAD (MSAS 105)
FROM 450' WEST OFT.H. 13 TO GLORY CIRCLE
CITY PROJECT 89-01
Date of Initial Agreement, October 17, 1988.
This Supplemental Agreement No.3 entered into this day of ,
19_ provides for a revision to the above-referenced agreement, all as hereinafter described,
and unless otherwise provided herein, shall be subject to all of the contract covenants and
stipulations.
I. Purpose
The purpose of this Supplemental Agreement is to (1) provide additional services, and (2)
increase the amount of compensation to cover resulting costs.
SA3-1
II. Additional Services
Provide revised final plans for two separate construction projects which involve an increase
in engineering services for work in Items IT B (2-5) of the initial agreement dated
October J 7, 1988. The revised fmal plans are required because of the decision to separate
the sidewalk construction from Glory Circle to Huron Street into a separate construction
project. The addition will include the following:
A. Revise Title Sheet and quantity sheets to remove sidewalk Construction.
B. Prepare new Title Sheet and quantity sheets for sidewalk project.
C. Remove plans and cross sections for sidewalk and renumber sheets.
D. Prepare cost estimates for two projects.
E. Prepare separate sets of specifications and bid documents for two projects.
ID. Section III - Compensation
Compensation for services provided under Subsection IIB - Plans shall be increased by
$6,000, limited to a maximum payment of $54,000 unless adjusted pursuant to Article 4 of
the Basic Agreement.
CITY OF PRIOR LAKE, MINNESOTA
Approved at a
meeting of the
on
,19_.
By
Attest
Its Mayor
Its City Manager
Approved as to form
Date
Consultant Acceptance by
Author
, ;"P"- f 8 , 19~~
SA3-2