BACKGROUND:
CENSUS '90
.
3 (b)
BRUCE LONEY, ASSISTANT CITY ENGINEER
CONSIDER APPROVAL OF CHANGE ORDER AND FINAL
PAYMENT FOR PROJECT #89-02
MARCH 5, 1990
The City of Prior Lake contracted with Tenyer
coatings, Inc. of Badger, Minnesota for the
repainting of the elevated water storage tank
on Tower Street. The project has been
completed and the purpose of this Agenda item
is to receive Council approval of Change Order
No. 1 and final payment to the contractor.
The City of Prior Lake entered into a contract
with Ten~er Coatings, Inc. on July 3, 1989.
The orig1nal contract amount for the work was
$150,790.00. During the course of the
sandblasting operations, the existing exterior
paint coating was found to have a prime coat
that contained a percentage of lead. The
Minnesota Pollution Control Agency required
the contractor to perform additional measures
for containment of the lead paint chips to
nearby properties and for additional cleanup
of the material. This extra work amounted to
$27,423.85 and is Change Order No.1, which is
enclosed in the Agenda packet. Toltz, King,
Duvall, Anderson, and Associates, Inc. (TKDA)
was the Project Engineer and performed the
contract administration on this project. The
Change Order amount was agreed to by the
Contractor, TKDA'S Project Engineer, and City
Staff.
The contractor provided a detailed list of
labor and materials required to complete the
pro~ect. TKDA's engineers and Larry Anderson
rev1ewed the documentation and are satisfied
that $27,423.85 is a justified additional
expense. The contractor did not receive
compensation for all the requested items, but
is satisfied with the final amount to be paid.
4629 Dakota 51. 5.E., Prior Lake, Minnesota 55372 / Ph. (612) 447-4230 / Fax (612) 447-4245
ALTERNATIVES:
RECOMMENDATION:
BUDGET IMPACT:
ACTION REQUIRED:
TKDA has certified that the work has been
completed according to the specifications and
a Final Payment Voucher has been submitted
which includes the amount for Change Order No.
1. A copy of the Final Payment Voucher is
enclosed. The contractor has submitted the
following documents necessary for final
payment:
1. Consent of Surety to Final Payment.
2. Affidavits for Obtaining Final Settlement
of Contract with the State of Minnesota
and an~ of Its Political or Governmental
Subdiv1sions.
Change Order No. 1 has been signed by the
contractor and the Final Payment Voucher has
been sent to the contractor for signing. The
contractor has verbally agreed to the final
payment amount and final payment will not be
made until the final payment voucher is
signed.
The contract bid amount was $150,790.00 with
the final estimate amount at $178,213.85. The
amount due the contractor is $34,963.35, which
includes the normal five percent retainage.
The alternatives are as follows:
1. Approve a motion authorizing Change Order
No. 1 and final contract payment for
Project #89-02 in the amount of
$34,963.35 to Tenyer coatings, Inc.,
contingent on the contractor signing the
Final Payment Voucher.
2. Disapprove the motion for a specific
reason.
3. Table this item for a specific reason.
Alternative No. 1 is recommended as the
contractor has completed the work, submitted
the necessary documentation and has agreed to
Change Order No. 1 and the final payment.
The financing of this project is through the
existing sewer and water funds and the
additional cost from the change order will not
impact the fund status to any great extent.
As part of the Consent Agenda, make a motion
to approve Change Order #1 and final payment
to Tenyer coatings, Inc. in the amount of
$34,963.35 for Project # 89-02.
---
-
.....,
Com. No. 89~9-009 Ccrt. No. 3 lffnal)
T()__~ Cfty of ~r~.~Lake. Mfnnesota
This Certifies th2t Tenyer Coatf ngs
St. l'2U], Minn.,_ February 13.
19JL
----..-.. Ow ncr
--, CoOCUClOl.
!
Repainting 7S0.~0 GalJgn [l~vatQd W4tar Stor~ge T'"k_
Thirty-Four Thousand Nine Hundred
Is eadtled to Shty-Three and 35/100--..................-.:------..-($34.963.35
3rd
beingJ.!inalJstimate {or partial payment 00 contract with you dated July 3. t9~
( 11 f .~ TOl.n, KING. DUVALL., .I.NOI!:f~SON
Received pa}'tnent in u 0 2bove certJnC2CC. ANO ASSOCIATES. .NCCIl,O""Tl.U
CJljCl'NCC". "NO ""CHlTCC"I'I
2500 iean National Bank Bldg.
s~.pa~e?~
Davfd L. Moore. P.E.
-
)
For
~=-
::-
:-=-
I
~
COl-.'1'-ACTOIl
19-
RECAPITULATION OF" ACCOUNT
~ONTR.c.c:T P.c. VMI:NTS CREe,,..
"LV. (X"rf'tAS
Contraet price plus utras 150.790 bL 143.25C - E
AU J)revious J)a)-meDts , 50
1- -
An p:-evious ~its , - -
I
Extra No. Change Order No. 1 n .423 ..B.5..
- --
" ..
.- -
" " -
-
.. II
-
.. II -
r - -
Cndit. No. -
,. ,.
-
.. .,
I -
,. ,.
-
AMOUN~ OF, THIS CERTIFICATE - 34.963135
'-
f
-. , L-_
'l:'otala __ " 178.'" lIi..J 178,213186 ~I .
9"<d1t B.I.... '_ -r _ .~ __.
'I'hero win fr:mai:. \:np&;d on contrnct. dla- rAymtnt o! tr.k I
C<:rtJ&:at.e f I 0 00
......., W'" _~____ __..._ ....
t~~:n;~;}J;8'2;3~~
.
---------------
- - - - - - - - - - -=-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- -:..:...: - - - - - - .- ~
. .
T01,TI, KING, DtrVAl.L, AMDI:R8OH AIfZ) USOCIATIDS, INCORPORATIDD
In9in..r.-ArCh1tect..Planner. Saint '.~1, Hlnnesota 5S101
'1IUClOICAL ."'DatI rea 'ARnAL 'ADCIIft'.
letimau
'roject
Location
Contraotor
FINAL
NO.....3.- Period Inc1inq ~:~I':~ l.\...U..JL
::::~ft~ '50.0QO a:~;.. ~_D& _
~:r ~~.r ~ftft.
'l'.nver Coa~ifl.cr.
'a9. 1 of 1 CoMa. NO.8ggg.00g
Ori91nal Contraot Amount
. l!10.7g0.00
Total Contraot Work Completed . 150.710.00
Total ~pproved Credits .
Total Appro.ed Bxtra Work Completed '-21. n~. 85
~pproved Extra Order. Amount Completed . 27,423.A5
Total Amount larned This Betimate . 178.213.8!
tel' Approved Credits .
Less __~t Retained . 0.00
I.e.. Previous Payments '--143. 2M. 50
Total Daduotions $ It!.2!10.50
Amount Due Thi. E.ttmate . !4.gn.!5
Contractor
Bft9in..c Y -.f. -/ ~
Date
Date
,/I"'/'Q
-"- ..-...... _.. -
CHANGE ORDER
TOLTZ, ~ING, DUVALL, ANDERSON
AND ASSOCIATES, INCORPORATED
Engineers-Architecta-Plannera
St. Paul, MN Janua~y 25. 19~, Comm. No. 8999-099 Change Order No. 1
To Tenyer Coatings
for Repainting 750,000 Gallon Elevated Sto~age Tank
for City of Prior Lake, Minnesota
You are hereby directed to make the following change to your contract dated
July 3 , 198~. The change and the work affected thereby
is subject to all contract stipulations and covenants. This Change Order will
(increase) (decrease) (not change) the contract sum by Twenty-Seven
Thousand Four Hundred Twenty-Three and 85/100--D011ars ($27.423.85 ).
Furnish and insta11 a shroud on the downwind side of the work area
to effectively contain paint particles during sandblasting operations to
remove paint, and furnish and install tarps beneath the tower to prevent
deposition of paint particles on the soil, all as directed by the Minnesota
Pollution Control Agency to minimize contamination of the environment with the
lead-based paint particles removed from the tank.
Total Cost of Labor and Equipment
$27,423.85
$ 150,790.00
$ 0.00
$ 0.00
$ 150.790.00
$ + 27.423.85
$ 178.213.85
Amount of Original Contract
Additions approved to date (Noa.
Deductions approved to date (Nos. 1
Contract amount to date
Amount of this Change Order (Add) (Deduct) (Not Changed)
Revised Contract Amount
Owner
TOLTZ, KING, DUVALL, ANDERSON
:: IT71 ?~
David L. Moore, P.E.
Approved CITY OF PRIOR LAKE. MN
White - Owner*
Pink - Contractor*
Blue - TKDA*
Yellow - Field
Goldenrod - Department
Green - TKDA Main File
*Only copies needing signatures.
CHANGE ORDER NO.1
CITY PROJECT 89-2
REPAINTING 750,000 GALLON ELEVATED STORAGE TANK
CITY OF PRIOR LAKE, MINNESOTA
Labor
$8,494.67
!n~~Jrance and Taxes (113.52)
$9,643.14
Equipment Rent (Schroud and hanging equipment)
$5,000.00
New Tarps (also used by City at salt pile)
$485.72
Mi~ceUaneous Materials
$223.30
Subtotal
$23,846.83
15% Overhead and Profit
$3.577.02
TOTAL
$27,423.85