HomeMy WebLinkAbout3I - Project 89-01 Final Payment - Valley Pavingg CONSENT AGENDA: PREPARED BY: SUBJECT: 3 (i) BRUCE LONEY, ASSISTANT CITY CONSIDER APPROVAL FOR FINAL 89-01, TRUNK HIGHWAY 13 AND IMPROVEMENTS APRIL 19, 1993 ENGINEER PAYMENT ON PROJECT FISH POINT ROAD DATE: INTRODUCTION The City of Prior Lake contracted with Valley Paving, Inc. of Shakopee, Minnesota for the construction of grading, aggregate base, storm sewer, concrete curb and gutter, concrete sidewalk, bituminous surfacing, traffic signaliziation and channelization improvements for the following areas: 1. T.H. 13 from Candy Cove Trail to Green Oaks Trail (SP 7001-62) 2. Fish Point Road from Forsythe Road to Glory Circle (MSAP 201-105-03) The purpose of this Agenda item is to receive Council approval of the final payment on this project. Supplemental Agreement #5 and Change Order #2 has been prepared and enclosed in the Agenda packet for Council approval. A signature sheet for the Mayor, City Manager, and City Attorney approvals is enclosed for both the Supplemental Agreement #5 and Change Order #2. BACKGROUND: Valley Paving, Inc. entered into a contract with the City on July 20, 1990. Toltz, King, Duvall, Anderson, & Associates, Inc. (TKDA) prepared the plans and specifications, and performed the contract administration on the project and has certified that the work has been completed according to the specifications. Most of the construction work such as the grading and installation of the signal, curb and gutter and initial bituminous surfacing layer and restoration work was done in the 1990 construction season. The final layer of pavement and restoration work was completed in the 1991 construction season. Durin9 the placement of the bitum1nous layer of pavement for T.H. Fish Point Road, areas of the pavement within a few days of placement. Contractor replaced the failed pavement filed a claim for the cost of correcting defective work. Resolving the claim has the last item in this contract and has initial 13 and failed The and this been been 4629 Dakota St. S.E., Prior Lake, Minnesota 55372 / Ph. (612) 447-4230 AN EQUAL OPPORTUNITY EMPLDYER Fax (612) 447-4245 time consuming. MnDOT and the contractor have agreed to a settlement on the dispute in which MnDOT would pay one-third of the claim. Supplemental Agreement #5 has been prepared by TKDA and signed by the contractor which will add $2,830.54 to the contract and will be added to the state's portion of the J?roject. Attached to Agenda packet is a s1gnature approval sheet for the mayor, city manager and city attorney to sign to authorize the payment to the contractor. Change Order #2 shows the compensating quantities to the existing contract which results in an increase in the contract. Attached to Agenda packet is a signature approval sheet for the mayor, city manager and city attorney to sign to authorize the payment to the contractor. The Contractor has signed the final Supplemental Agreement #5 and Change and submitted the following necessary for final payment: 1. Consent of Surety to Final Payment 2. Affidavits for Obtaining Final Settlement of Contract with the state of Minnesota and an~ of Its Political or Governmental Subdiv1sions. 3. Lien Waivers estimate, Order #2 documents DISCUSSION: The District Engineer from MnDOT has been in contact by the project engineer on the supplemental agreement and change order items and have 9iven verbal approval on these items. The City 1S the agency which has the contract with the contractor on this project. Approval by the City on the supplemental agreement and change order is necessary in order to pay for work that has been performed by the contractor. The contract bid amount for the project was $709,851.27 with the final contract amount to complete the project is $786,355.42. The final project cost was $76,504.15 over the contract bid amount with $35,066.05 attributed to Supplemental Agreements 1 thru 5 and $39,644.45 due to cost overruns. The final pa~ment been included with the invoices of th1s month for Council approval. ALTERNATIVES: RECOMMENDATION: BUDGET IMPACT: ACTION REQUIRED: The alternatives are as follows: 1. Approve a motion aJ?proving Supplemental Agreement No. 5 1n the amount of $2,830.54 and approve a motion approving Change Order No. 2 in the amount of $41,438.10 amending the contract with Valley Paving, Inc.; and approve a motion authorizing final contract payment for Project No. 89-01, in the amount of $25,348.10 to Valley Paving, Inc. contingent upon MnDOT approval of Supplemental Agreement #5 and Change Order #2. 2. Disapprove the motion for a specific reason. 3. Table this item for specific reason. Alternate number one is recommended as the Contractor has completed the work, submitted the necessary documentation and has signed to the final payment, Supplemental Agreement #5 and Change Order #2. This amount will be paid from the Construction Fund and has been included with this month's construction voucher. The project has been paid for by a combination of MnDOT state funding ($483,602.65), MnDOT Municipal State Aid funding ($277,006.44), and city funds ($25,746.33) . Make a motion as part of the Consent Agenda to approve Supplemental Agreement No. 5 for state Project 7001-62 and Change Order No. 2 for State Project 7001-62 and Municipal state Aid Project 201-105-03 authorizing the Mayor and City Manager to sign the Signature Approval Sheet approving the supplemental agreement and change order and approving the final payment of $25,348.10 to Valley Paving, Inc., contingent upon MnDOT approval of Supplemental Agreement #5 and Change Order #2. SIGNATURE APPROVAL SHEET CITY OF PRIOR LAKE 4629 DAKOTA STREET S.E. PRIOR LAKE, MN. 55372 FOR: April 19, 1993 SUPPLEMENTAL AGREEMENT 5 VALLEY PAVING INC. S.P. 7001-62, City Project 89-01 - T.H. 13 between Candy Cove Trail and Green Oaks Trail CITY OF PRIOR LAKE, MINNESOTA DATE: TO: FOR: Approved as to Form: CITY ATTORNEY APPROVALS: Approved CITY OF PRIOR LAKE Owner Respectfully Submitted, CITY OF PRIOR LAKE ENGINEERING DEPARTMENT By Mayor Date By City Manager Date Bruce Loney Project Engineer 4629 Dakota 51. 5.E., Prior Lake, Minnesota 55372 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLDYER SIGNATURE APPROVAL SHEET CITY OF PRIOR LAKE 4629 DAKOTA STREET S.E. PRIOR LAKE, MN. 55372 FOR: April 19, 1993 CHANGE ORDER 2 VALLEY PAVING INC. S.P. 7001-62, City Project 89-01 - T.H. 13 between Candy Cove Trail and Green Oaks Trail M.S.A.P. 201-105-03 City Project 89-01 - Fish Point Road between Forsythe Road and Glory Circle CITY OF PRIOR LAKE, MINNESOTA DATE: TO: FOR: Approved as to Form: CITY ATTORNEY APPROVALS: Approved CITY OF PRIOR LAKE Owner Respectfully Submitted, CITY OF PRIOR LAKE ENGINEERING DEPARTMENT By Mayor Date By city Manager Date Bruce Loney Project Engineer 4629 Dakota 51. 5.E., Prior Lake, Minnesota 55372 I Ph. (612) 447.4230 I Fax (612) 447.4245 AN EQUAL OPPORTUNITY EMPLDYER OuJt\e.Y ComIn. No. 9366-02 FINAL Celt. No. 12 St. Paul, MN, March 30 ,19-21- To City of Prior Lake. Minnesota Valley Paving. Inc, Owner This Certifies that , Contractor For TH 13fFish Point Road - SF 7001-62. MSAP 201-105-03 Twenty-five Thousand Three Hundred Forty-eight and Is entitled to 10/100 Dollars -------------------------------------__________________($ being 12th estimate for fmal payment on contract with you dated July 20 25.348.10 ) , 19---29- Received payment in full of above Certificate. ,19_ TOLTZ, KING, DWALL, ANDERSON AND ASSOCIATES, INCORPORATED ENGINEERS AND ARCHITECTS 1500 Merftor Tower, 444 Cedar Street ) St. Paul, Minnesota 55101-2140 V~~.~ Vince T. Montgome , P.E. CONTRACTOR RECAPITULATION OF ACCOUNT " 11 Supplemental Agreement No.1 Supplemental Aszreement No.2 Supplemental Aszreement No.3 Supplemental A2reement No.4 Supplemental Aszreement No.5 Comoensatinll Chanlle Order No.2 CONTRACT PLUS EXTRAS 709.851127 I 1 I + 13.511115 + 2.983176 + 4.080150 + 11.660110 + 2.830154 + 41.438110 I , I I I I , , 786355142 1 , , , , 786355142 PAYMENTS CREDITS Contract price plus extras All previous payments All previous credits I 761.007132 Extra No, II " Credit No, n " " " AMOUNT OF TInS CERTIF1CATE 25.348110 I 786.355142 I I 0100 1 I 786.355142 Totals Credit Balance 1bere will remain unpaid on contract after payment of this Certificate CONSTRUCTION PAYMENT VOUCHER Estimate Voucher No. Date: 12 FINAL For Period Ending: 9-30-92 MSAP 201-105-03 Project Number: SP 7001-62 March 30, 1993 TH 13/Fish Point Road Class of Work: For: A. B. C. D. E. F. G. H. I. J. City of Prior Lake To: Valley Paving, Inc. 8800 13th Avenue East Shakopee, MN 55379 Original Contract Amount Total Additions (SA1,2,3,4,5) Compensating Change Order 2 Total Deductions Total Funds Encumbered Total Value of Work Certified to Date Less Retained Percentage 0% Less Total Previous Payments Approved for Payment, This Report Total Payments Including This Voucher Balance Carried Forward $ $ $ $ 709,851.27 35.066.05 41.438.10 0.00 $ $ $ $ $ $ $ 786,355.42 786,355.42 0.00 761,007.32 25,348.10 786,355.42 0.00 APPROVALS Pursuant to our field observation, as performed in accordance with our contract, we hereby certify that the materials are satisfactory and the work properly performed in accordance with the plans and specifications and that the total work is 100.00 % completed as of, September 30, 1992 I hereby recommend payment of this vouche . Project Engineer Approval: This is to certify that to the best of my knowledge, information, belief, the quantities and values of work certified herein is a approximate estimate for the period covered by this voucher. Contractor: Valley paving, Inc. Signed By ~ Date: APRTT. 1, 100' Title:L~ A.-~ , and fair ~ CITY OF PRIOR LAKE #~~ 4/1/93 ~~r~:;~ent ~~ Authorized Representative Voucher Checked By: Date: Date: ~\L~ ~3 .5<3/ - t1.ro?O -.:5' () / TOLTZ, KING, DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED Engineers-Architects-Planners Saint Paul, Minnesota 55101 PERIODICAL ESTIMATE FOR PARTIAL PAYMENTS Final Estimate No. Project Location Contractor 12 Period Ending Sep. 30 TH 13/Fish Point Road Prior Lake. Minnesota Valley pavinq. Inc. 19~ Page 1 of 1 Comm. No. 9366-02 Original Contract Amount $ 709.851.27 SP 7001-62 Work Completed MSAP 201-105-03 Work Completed $ 487.029.84 $ 262,466.08 ~ ~Yn~ ----::::::-- Vince T. ,,",nt~.g, p~ Finance Director ~ - ~ity of Prior Lake Datec'l -j- 73' Contractor Date 3-30-93 Date -fIlA-I? ') T.R. 13/VISR POINT ROAD PRIOR ~, MIHNBSOTA S.P. 7001-62/M.S.A.P. 201-105-03 SOPPLKMBNTAL AQRBBMBNT NO. 1 ITEM QUANTITY UNIT UNIT PRICE 2104.501 Guardrail removal 2331.512 Bituminoua leveling course 0550.601 Swing away hinge. 2554.501 Guardrail installation 2554.521 Plate anchora 2554.523 Twiated end treatment 2564.531 Type "0" .ign panel. 380.0 LF 303.0 TON 1.0 LS 250.0 LF 1.0 BA 1.0 SA 20.0 SF SUBTOTAL 1.25 20.65 4,003.15 12.20 260.00 620.00 28.00 AMOUNT 475.00 6,256.95 4,003.15 3,050.00 260.00 620.00 560.00 15,225.10 ITEM SOPPLKMENTAL AQRBEMENT NO. 2 AMOUNT QUANTITY UNIT UNIT PRICK 0504.602 Lower water .ervice. 2511.515 Geotextile fabric 2564.531 "BEGINS (DATE)" sign panela 2564.531 Type "0" .ign panels 2.0 256.0 24.0 28.5 sUBTOTAL BA SY SF SF 736.00 1.44 14.38 28.00 1,472.00 368.64 345.12 798.00 2,983.76 SUPPLEMENTAL AGREEMENT NO. 3 AMOUNT ITEM NO. ITEM QUANTITY UNIT UNIT PRICE 2105.525 Topaoil Borrow (LV) 2564.541 Delineator, Type 1A 341.0 CY $11.50 9.0 BA $38.00 SUBTOTAL $3,921.50 $342.00 $4,263.50 ITEM NO. ITEM SUPPLEMENTAL AGREEMENT NO. 4 AMOUNT QUANTITY UNIT UNIT PRICE 2104.505 Remove Bituminou. Pavement 2104.513 Sawing Bituminous Pavement 2105.525 Topsoil Borrow (LV) 2211.501 Aggregate Base, Class 5 2331.518 Bituminous ~xture for Patching 2451.511 Coarse Filter Aggregate 2502.541 4" PerforatedPE Pipe Drain 0506.602 Connect Into Exist. HH or CB 2511.515 Geotextile Filter Type I 72 . 0 SY 265.0 LF 206.0 CY 22.0 TN 13 . 0 TN 30.0 SF 215.0 LF 1.0 EA 285.0 SY SUBTOTAL $0.80 $2.35 $11.50 $6.00 $150.00 $23.25 $20.50 $280.00 $3.65 $57.60 $622.75 $2,369.00 $132.00 $1,950.00 $697.50 $4,407.50 $280.00 $1,040.25 $11,556.60 ITEM NO. ITEM SUPPLEMENTAL AGREEMENT NO. 5 AMOUNT QUANTITY UNIT UNIT PRICE 1 Totals ~ll 3 Operator 2 306 Bobcat and Operator 3 327 Broom Tractor and Operator 4 215 Roller and Operator 5 205 Paver and Operator 6 113 Distributor and Operator 7 17 Foreman and Pickup* 8 Transport and Operator 9 Triaxle Dump. and Operators 10 Tandum Dumps and Operators 11 Jackhammer and Operator 12 Flag and Laborer 13 Total Transport and Operator 14 2341 Binder 15 Tack 4RR 5RR 5RR 5RR 4HR 2RR 9RR 3HR 11 . 25 HR 23.75 HR 2HR 8RR 2RR 163.94 TON 100 GAL SUBTOTAL** $350.00 $45.40 $46.40 $40.50 $110.40 $48.00 $40.00 $75.00 $48.00 $42.00 $39.00 $24.50 $75.00 $19.80 $1. 00 $1,400.00 $227.00 $232.00 $202.50 $441.60 $96.00 $360.00 $225.00 $540.00 $997.50 $78.00 $196.00 $150.00 $3,246.01 $100.00 $8,491. 61*** * Supt. and pickup will not be included with Foreman and pickup on project. ** Rates include overbead and profit. Additional overbead and profit will not be included. ***sAS amount to be .bared by 3 partie.; amount to be added to contract - $2,830.54 TOTAL INCREASE TO CONTRACT (SAl tbrough SAS) $36,859.50 UG& 1 'I... 13/rIII PODrr ~ rDIAL IU'fIMAn 110. 12 PUCIIl. I.An, IUIIIIZ8O'fA PD.IOD DIDDIG P-30-P2 B.P. 7001-I2/H.B .A.P. 201-105-03 VALLKY TOTAL B.P. 7001-62 H.B.A.P. 201-105-03 B.P. 7001-12 H.B.A.P. 201-105-03 TO'fAl, PAVDIG lI'fOIlH BI:III:R S'l'ONl SEllER S'1'ONl SI:III:R r:rDI 110. IlUCJUP'rIClIJ 1lIll'l pua llIIIT QQAH'J'lTY AHOON'l OOARTITY llHOOIl'l' QVAIII'1'lTY ~ OOANrrrr ANOIlII'I OOANrITY AHOON'f QQANrITY AMOOJI'f ---------------------------------------------------------------------------------------------------------------.------------------------------------------------------------------------- 2021.501 HOBILIZA%IClIJ 26,000.00 L~ Smt 1.00 26,000.00 0.57 14,820.00 0.33 8,580.00 0.08 2,080.00 0.02 520.00 0.10 2,600.00 2031. 501 rULI> OFrla, 'fYPED 4,000.00 , UCII 1 4,000.00 0.57 2,280.00 0.33 1,320.00 0.08 320.00 0.02 80.00 0.10 400.00 2101. 501 CLEARDIG 1,500.00 ACllJ: 0.15 225.00 0.15 225.00 2101. 502 CLII:ARDIG 110.00 TIlJ:E 50 5,500.00 38 4,180.00 12 1,320.00 2101.506 GRDBIlDIG 1,500.00 ACllJ: 0.15 225.00 0.15 225.00 2101.507 GRDBIlDIG '5.00 TIlJ:E 50 4,750.00 38 3,610.00 12 1,140.00 2104 .501 JlDtOVII: ClI1\B AH/) Gl71"1'J:I\ 3.00 LIII M' 20~5 6,075.00 258 774 .00 1767 5,301. 00 2104 .501 JlDtOVII: HE'rAL COLVII:Il'fS 6.00 LDI M' 86 516.00 86 516 .00 2104.501 I\DI()VJ: S_ PIPE 6.00 LIII M' " 5".00 " 5".00 2104.505 JlDtOVII: 8I'faKlNOU8 PAVII:MII:H'f 0.80 8Q YD llB66 ',U2.BO 7218 5,774.40 4648 3,718.40 2104.505 JlDtOVII: I>RlVJ:llAY PAvaa:N'.I' 2.10 80 YD lU 354.90 67 140.70 102 214.20 2104 . 50' JlDtOVII: CA7ClI BAS DI 110.00 UCII 2 220.00 2 220.00 2104.50' I\DI()VJ: 1100I) LIGIIT POLl: AH/) LlMDIAlIlll: 180.00 EACII 2104.50' I\DI()VJ: HE'rAL AP_S 30.00 I:l\CB 3 '0.00 3 '0.00 2104.50' JlDtOVII: COIICI\II:TII: APROIIB 85.00 UCII 1 85.00 1 85.00 2104.50' aENOVII: CAB'flllGa 65.00 EACH 3 U5.00 3 U5.00 2104.513 SAllDIG 8I'faKlNOU8 PAVDa:Il'1' 2.35 LDI M' 2043 4,801,05 1"0 4,676.50 53 124 . 55 2104.521 SALW\GII: SI:III:R PIPE 6.50 LDI M' 52 338.00 52 338.00 2104.523 SALW\GII: SIGI! 2'.00 EACH 18 522.00 232.00 10 2'0.00 2104.523 SALVAlZ CXJIlCJ\II:TII: APRONS 110.00 EACH 1 110.00 1 110.00 2105.501 CCMIClIi EXCAVI\7IClIJ 4.80 CO YD 2635 12,U8.00 817 3,921.60 1818 8,726.40 2105.507 lIlIIIGIUlllE EXCAVI\7IClIJ 4.80 CO YD 7031 33,748.80 5238 25,1(2.40 1793 8,606.40 2105.522 811:L&C'J' GI\AHOLAJl BORROIf 5.35 CO YD 5817 31,120.95 5817 31,120.t5 2105.523 CCHtOM BORROIf lEV) 3.45 CO YD 222U 76,741.80 16241 56,031. 45 6003 20,710.35 2105.533 SALVAIZ[) ~ (EV) 5.85 CO YD 2215 12,957.75 2215 12, t57. 75 2118.501 ~ 8UltJ'ACDIG, CLASS 15.00 TOIl 17 255.00 17 255.00 2130.501 1IA:I'II:1l. 18.00 MeaL 2211.501 ~ auE, CLAlI8 5 6.00 TOIl 10810 64,860.00 6800 40,800.00 4010 24,060.00 2331. 510 TYPE 31 BDlDD COUIISE HlJtT'Ollll: It.50 TOIl 556 10,842.00 556 10,842.00 2331.514 TYPE 31 BASE COOIISE HlX1'lJRl: It.OO 70Il 2U7 46,U3.00 1891 35,'29 .00 556 10, 5U. 00 2331. 51B BI'1'IMDIOOB HlX'1'Ulll: POR PA7CllDIG 150.00 TOIl 70 10,500.00 58 8,700.00 12 1,800.00 2331. 510 TYPE 41 BDlDO COUIUIE HlX'1'Ulll: It.80 TOIl 873 17,285.40 873 17,285.40 2331. 508 TYPE 41 UARDIG COUIISE HlJtT'Ollll: 21.50 TOIl 1630 35,045.00 1012 21,758.00 618 13,287.00 2357.502 BI'1'IMDIOOS IdA'fll:JUAL roll TACJ( COA2' 1.20 GALLONS 1785 2,142.00 1030 1,236.00 755 P06.00 0403 . 603 II:rn:HI> 'l'lHBJ:It tIALL 11.50 SQ M' 333 3,825t.50 333 3,82'.50 0411.603 COIlCJU:'l'II: BLOClt RrrADlDIG tIALL, "0' -4' 11.50 8Q M' 672 7,728.00 672 7,728.00 0411. 603 COIICRJ:ft IlLOClt IIJ:TADlDIG tIALL, S-.' -ti' 11.80 8Q M' 417 4,nO.60 417 4, no .60 0411.603 COIICRJ:'l'II: 8LOClt I\J:TADlDIG tIALL, 8-6' -8' 12.00 8Q M' 263 3,156.00 263 3,156.00 0411. 603 COIICJU:'l'J: IlLOClt IIJ:TADlIIIG tIALL, 8-8' -11' 12.70 8Q M' 1146 14,554.20 1146 14,554.20 2451.50' ~ BJ:DDDIG ICV} 15.00 CO YD 60 '00.00 60 '00.00 2451.513 rDIII: rIL'l'U ~ (ev) 11.00 co YD 205 2,255.00 205 2,255.00 2501.511 18. RC PIPE COLVERT 22.25 LIN M' 72 1,602.00 72 1,602.00 2501.511 36. CS PIPE COLVERT 43.00 LDI M' 12 516.00 12 516 .00 2501.51& 15. RC PIPE APRON 450.00 EACB 3 1,350.00 3 1,350.00 2501.515 18. RC PIPE APIIOH 480.00 II:AClI 4 1,920.00 2 "0 . 00 "0 . 00 "0 . 00 2501.573 D18'l'ALL IS'l'AL AP_ 60.00 I:l\CB 1 60.00 60.00 60.00 0501. 602 IItlLI:IlI:1oD COLVERT 60.00 UCII 2 120.00 120.00 0501.602 TRASK GOARD POll 18" PIPE AP_ 264 .00 EACB 1 264.00 264 .00 264.00 0501.602 TRASK GOARD I'OR 15' PIPE AP_ 240.00 EACB 250%.541 4. PEArORArED TP PIPE DRAlR 10.80 LDI M' 365 3,'42.00 365 3, "2 .00 0502.601 PJlII:CAST c:cJIICU:n II&ADIIALL Ito.OO EACB 2 380.00 2 380.00 2503.&41 15. RC PIPE 811:W11:R, DEB 3006 23.60 LDI M' 735 17,346 .00 400 ',440.00 23t 5,640.40 " 2,265.60 335 7,'06.00 2503.&41 15. RC PIPE 811:W11:R, DEB 3006, CL III 23.60 LIN M' 18 424.80 18 424.80 18 424..0 2503.541 15. RC PIPE BII:WII:R, I>EB 3006, CL IV 23.60 LIN M' 62 1,463.20 62 1,463.20 62 1,463 .20 2103.1141 18. IIC PUE B_, I>EB 3006 26.00 LXII M' 2Z& &,150.00 2211 lI,no.oo 22& &,no.oo 21103.1141 18. IIC PIPE BIlllZJl., I>EB 3006, CL III 26.00 LDI M' 135 3,510.00 1311 3,1110.00 1311 3,1110.00 2503.541 18. RC PIPE BI:III:R, DEB 3006, CL IV 26.00 LDI M' 203 5,278.00 203 5,278.00 203 5,278.00 2503.571 D18'l'ALL 1.. RC PIPE 81:111:R 8.00 LDI M' 51 408.00 51 408.00 51 408.00 2503.573 DlBTALL 1.. RC P IPK APRClIJ W/'l'IlASB GOARD 110.00 I:l\CB 1 110.00 1 110.00 1 110.00 0504.602 ADJUII'J' VALVE BOX - III\7II:R 108.00 EACB 8 864 .00 864 .00 0504.602 IoDJTJII'J' ClI1\B BOX 215 .00 EACB rJWa 2 7.B. 13/rlBB PO~ ROAD rDIAL ~IMI.ft 110. 12 IPIll0R LAD, ~A IPERIOD DlDDIG t-30-n S.IP. 7001-12/M.S.A.IP. 201-105-03 VALLEY TO'lAL S.P. 7001-12 M.S.A.IP. 201-105-03 ..IP. 7001-12 M...A.IP. 201-105-03 2O'rAL PAVDlG STONe ._ 8'1'01Qt S~ 8'1'ONl S_ 1'IDI 110. DCSCRlnIC* WIT 1P1lla: llYn QOAN'J'rry AHOOIft QOAN'J'ITY ANOOaI'l QOAR'Z lTY >>tOON7 QUAII'1'lTY MIOUM'I' QOAR'Zl7Y AHOIJN'l' ouunIn AMOOII'r -------------------------------------------------------------------...----------------------------------------------------------------------------------------------------------------------- 2501.506 COHB'.I'IlUCT _OLEa, DIU r 110.00 LDI I"l' 56.2 6,182.00 51.2 6,182.00 56.2 6,182.00 2506.507 COHB'.I'IlUCT CA:l'CII IlA8D1S, DIU GOIIB 215.00 LDI I"l' 36.6 7,869.00 15.t 3,U8.50 17.5 3,762.50 3.2 688.00 20.7 4,UO.50 2501.50' COIIr.rRUC'1 CA:l'CII BASlHlI, DEll loP 6-6 1,500.00 EAC.B 2 3,000.00 2 3,000.00 2 3,000.00 2506.511 ~8'rRDC'J' IIAIIIIOLEa 150.00 LDI I"l' 13.3 I, U5.00 10.6 l,5tO.00 2.7 605.00 2506.516 CU'lDIG UB_LllU 210.00 EAC.B 17 3,570.00 6 1,260.00 8 1,680.00 3 630.00 11 2,310.00 2506.521 DlnALl. CU'lDIG 65.00 EACB 3 U5.00 1 65.00 2 130.00 2506.522 ADJOS'Z I'RAYE AIID IlDIG CU'l'DIG 155.00 EACB t l,3t5.00 1 155.00 5 775.00 1 155.00 2 310.00 3 U5.OO 0506.102 COIDlI:C'r Dl'J'() J:X1nDIG HII Oil CB 280.00 EACB 4 1,120.00 1 280.00 3 840.00 4 1,120.00 2511. 501 JlAIII:)<* IlUIl>>, CL 11 5t.00 co YI> 38 2,262.00 11 6U.00 27 l,5t3.00 27 1,5'3.00 2511.511 GIlAIIllLAIl rILD:Il 8.00 co YI> 13 106.00 4 32.00 t 72.00 9 72.00 2521.501 6. COJICIlI:7J: 1IALJ: 1.65 so I"l' 3526 5,112.70 1076 1,560.20 2650 3,552.50 2521. 501 6 . ClClIICIIrl'E 1IALJ: 2.20 SO I"l' 125 275.00 lZS 275.00 2531. 501 COMCItE'lJ: CONI AIID C3lr.l'7D, DIU B626 6.50 LDI I"l' 6022 26,163.00 6022 26,163.00 2531.501 ClClIICIIrl'E CONI AHD GU'1"l'I:Jl, DES B124 1.05 LDI I"l' 3376 20,U2.70 678 6,101.'0 2696 16,310.80 2531.503 COHCRI:'II: Ml:DIA>> 16.00 so YI> 1663 23,282.00 1535 21,UO.00 128 1,"2.00 0531. 602 COHCRI:'II: Ml:DIA>> 110ft 800 . 00 EAC.B 2 1,600.00 2 1,600.00 2531.507 6' ClClIICIIrl'E DIlIVEWAY IPAVDa:II'1' 20.50 SQ YI> " 1,783.50 87 1,783.50 0557.603 WOODDI I'DICZ 65.00 LDI I"l' 166 7,380.00 166 7,380.00 0563.101 'rI\AITIC COIi'1'ROL 18,000.00 UBG> 8WI 1 18,000.00 0.57 10,260.00 0.33 5,140.00 0.08 1,140.00 0.02 360.00 0.10 1,800.00 2566.531 r , I SIGal IP AMJ:LlI, 7YlPI:C 28.00 so I"l' 267 7,6".00 163 6,564.00 106 2,n2.00 0566.102 r AVDa:Il'1' HUSAGI: (loT ARROW' POLY IPIII:I'ONoI 13t .05 EAC.B 8 1,112.40 6 834.30 2 278 .10 0566 . 602 IPAVDa:Il'1' HUSAGIt (1lT ARROW) IPOLY PIII:I'ONt 13t .05 EACB 6 83" 30 6 834.30 0566 . 603 ,. BOLlI> LUll: urn: IP ADl'.r 0.25 LDI I"l' 10300 2,575.00 "36 2,65t.00 66' 116.00 0566.103 12. 8'1'OP LDlI: 11111'1'1: 1PADl'.r 1.36 LDI rr 73 U.28 73 U.28 0566.603 26. 8'1'01P LUll: UI'1'I: 1PADl'.r 1.61 LDI I"l' 83 133.63 83 133.63 0566 .103 ,. BOLlI> LDlI: YUl.OIl 1PADl'.r 0.25 LDI I"l' 3616 '04.00 3616 t06.00 0566.603 ,. DOOIlU BOLlI> LDD: YI:1.LOII PADl'l 0.67 LDI I"l' 5118 2,605.66 3668 l,I29.t6 U50 775.110 0566.603 12. BOLlI> LDlI: YUl.OIl I'ADn 1.36 LDI rr 153 208.08 153 208.08 0566 . 603 26. BOLlI> LDD: YJ:1.LOtI I' ADn 1.61 LDI I"l' 568 n..68 568 n'.68 0566 . 60' CIlOSS1IALJC MAIlItD1Gl l'OLY I'III:I'OIlM '.17 SO I"l' "2 3,302.64 792 3,302.66 2565.511 I'ULL 7 ACI T COIi'1'ROL SIGtIAL SYB'l'DC 70,000.00 SIG SYS 1.00 70,000.00 0.50 35,000.00 0.110 311,000.00 2573.501 BALI: CII&a 8.00 EACB 73 584.00 37 296 .00 36 288.00 2573.502 S IL7 I'DICZ, Ill:AVY 007Y 3.00 UII rr 661 1,383.00 1U 623.00 320 t60.00 2575.501 SI:I:DDIG 3,500.00 ACIlI: 1.8 6,300.00 1.35 .,.125.00 O.U 1,5')5.00 2575.502 SEED, MIX'J'tJJlZ 500 3.00 I'OOHI) ,. 228.00 57 171.00 U 57.00 2575.502 S&J':t), KIrJ'tJU 1000 8.00 POOHI) 15 120.00 11 8&.00 4 32.00 2575.505 8OIlDDIG, 7YlP1: LAJ8l 2.10 so YI> 5888 12,366.80 3.28 7,lt8.80 2460 5,166.00 2575.505 aCXlODIG, 7YlP1: EROSICl5 2.10 SO YI> 570 l,lt7.00 5'0 l,lt7.00 2575.511 amLCII MA.%'ERI.AL, 7YlP1: 1-3 250.00 TOIl 3.2 800.00 2.5 625.00 0.70 175.00 2li75.5l2 I&JLC8 MA:rU.IAL, 7YlP1: 2-3 6.30 GALLON 30. 1,307.20 246 1,057.80 58 24t.'O 2575.523 WOOD rIIII:Il BLUna:7S 1.15 SO YI> 1588 1,826.20 t84 1,131. 60 606 6,. .10 2575.532 c<:HtI:RCIAL 1'I:R7ILIZI:I\ JUlALYSIS 10-20-20 0.30 I'OOIID U6 274.80 658 U7.'0 258 77 .60 $76t,6t5.92 $446,076. ,. . 4253,114.68 460, t54. to . $9,271. 60 450,226.50 8P - 6",029.84 fatat. (u.a. - 20,108.86 . HSAP - 262,466.08 'City (50.t.) - 20,846 .0' *Total stat. Participation 466,183.80 **Total City Partio~tioA 283,312.12 MNIDOT TP-02134-03 (&'88) 8\.w. to Contrlld No. . STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL AGREEMENT NO. 5 Sheet 1 0# ] Contracto,: Federal P roje<:t: State Project No.: Valley Paving, Inc. 1001-62 Addr..s: I Location: I 8800 13tb Ave. B. I Trunk Highway 13, between Candy Cove Trail and Qreen Oak. Trail Sbakopee, HH 55319 I in Prior Lake, Minne.ota , Proj. No. I F.Y. I Aocount 1.0. I DeptJOIv. I Sequenoe No. t Suffix I Object I Vendor ITr I Amo~ i I I i i 01 i i i Purchase Terms I Asset No. I C.CO.1 I C.CO.2 I C.CO.3 I C.CO." I C.CO.5 I , i i i i TYPE OF A40 ( ) A41 ( ) Dated Number Entered by TRANSACTION: A44 ( ) A45 ( ) A46( ) Dated Number Entered by ThIs contract Is amended as follows: WHERBAB: In accordance with the .ettlement agreement outlined in MnDOT letter dated Karch 18, 1993, (copy attached hereto) and agreed to by involved partie., the following i. added to the exiating contract: ITEM NO. ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 Total. Mill 3 Operator 4 Rlt $350.00 $1,400.00 2 306 Bobcat and Operator 5 Rlt $45.40 $221.00 3 321 Broom Tractor and Operator 5 Rlt $46.40 $232.00 4 215 Roller and Operator 5 Rlt $40.50 $202.50 5 205 Paver and Operator 4 Rlt $110.40 $441.60 6 113 Di.tr~tor and Operator 2 RR $48.00 $96.00 1 11 Foreman and Pickup* 9 Rlt $40.00 $360.00 8 Tran.port and Operator 3 Rlt $15.00 .$225.00 9 Triax1e Dump. and Operator. 11.25 Rlt $48.00 $540.00 10 Tandum Dump. and Operator. 23.15 Rlt $42.00 $997.50 11 Jackhammer and Operator 2 Rlt $39.00 $78.00 12 Flag and Laborer 8 Rlt $24.50 $196.00 13 Total Tran.port and Operator 2 Rlt $75.00 $150.00 14 2341 Binder 163.94 TON $19.80 $3,246.01 15 Tack 100 GAL $1.00 $100.00 --------------- SUBTOTAL** $8, 491. 61 * Supt. and pickup will not be included with Foreman and pickup on project. ** Rate. include overhead and profit. Additional overbead and profit will not be included. 'fotal above to be .hared by 3 partie.; amount to be added to contract _ $2,830.54 APPROVED: I APPROVED: I Original Contract I Commissioner of , Commissioner of I I Dated 3-30-93 Administration I Finance I I I I Approved as to form 10ated/J-J-1'J IBy r By I and execution I I I Approved as to form I Dated I I I Dltrlcl EnuIr- Dated I Dated I I Dated I , Aell_ AIIllmey 0_" I ~HHd /f!DJ ~~~ Minnesota Department of Transportation Metropolitan Division Transportation Building St. Paul, Minnesota 55155 Oakdale Office, 3485 Hadley Avenue North, Oakdale, Minnesota 55128 Golden Valley Office, 2055 North Lilac Drive, Golden Valley, Minnesota 55422 March 18, 1993 Reply to Telephone No. 593-8518 RECEIVED I~il~:( 2 ..~ ;995 Mr. Vince T. Montgomery TKDA and Associates, Inc. 2500 American National Bank Building ST. Paul, MN 55101 T.K.D.A. Subject: SP 7001-62 SAP 201-105-03 1H 13 at Fish Point Road, City of Prior Lake Cooperative Agreement 67360 dtREI'I ,... ~..,., ~'--. ~.=~ Q eEATiY Q... HARnEY_ QBERK~ ~D6F~ Q eo - Q@.'l)l~ YER _ CU:iRI( Q~ - Q.ERX\~ ~DA~D~ .~~ o C;:'f: . . N1.~e..,.f'l""""1 \ '- "" o ~ i:i Vo.w.::"'~' Dear Mr. Montgomery: C .1' "\ - ;? a n...c:.u WI r "t.. This letter is a follow-up response to several previous letters, phone conversations and meetings that have occurred recently relating to the above referenced project. As you are aware, the need for all this discussion resulted from a contractor claim based on a bituminous pavement failure that occurred in the fall of 1990. Although no specific reason has ever been identified or proven to be the cauSe of this failure despite the extra effort put forth by many experts in the bituminous field, we feel it is time to settle this claim. In an amicable attempt to settle and close this project, The State of Minnesota will accept financial responsibility for one-third of a modified contractors claim. This one-third split is the original proflosal submitted by the contractor. The original claim for $11,347.31 has be reviewed by our Estimating Section and adjustments have been made to reflect acceptable terms. This modified claim is detailed on the following page and reflects a total dollar amount of $8,491.61. Adjustment are indicated in bold. Under this attempt for settlement, the State will accept $2,830.54 to be added to the contract. Please inform me of the decision of all parties involved and, if acceptable, submit a lump sum supplemental agreement to cover this work. Indicate the total dollar amount and the percentage distribution of all parties accepting responsibility. All Equnl OP/I()rtllllity Employ", Mr. Vince T. Montgomery March 18, 1993 Page 2 Equipment Totals Mill 3 operators 306 Bobcat and operator 327 Broom tractor and operator 215 Roller and operator 205 Paver and operator 113 Distributor and operator 17 Foremm and. pickup* Transport and operator Triaxle dumps and operators Tandum dumps and operators Jackhammer and operator Flag and laborer Total Transport and operator Materials 2341 Binder Tack Hou~ ~ 4 350.00 5 45.40 5 46.40 5 40.50 4 110.40 2 48.00 9 40.00 3 75.00 11.25 48.00 23.75 42.00 2 39.00 8 24.50 2 75.00 Ouantity 163.94 19.80 100.00 1.00 TOTAL MODIFIED ClAIM ThW 1400.00 227.00 232.00 202.50 441.60 96.00 360.00 225.00 540.00 997.50 78.00 196.00 150.00 3246.01 100.00 $8491.61 ** * Supt. and pickup will not be included with Foreman and pickup on project. ** Rates received from the Estimating Section include overhead and profit, therefore additional overhead and profit provisions will not be included. ntact me if you have any questions. r y, ~ Greg M.\U~ ~1-0 Cooperative Agreement Engineer Metro Division cc: Elmer Morris Mary Bieringer Larry Anderson-City of Prior Lake Pat Schrader-Municipal Agr. Gene Schmidt-Estimating Project File v- Mrw'OqT, l"-218<CO-02 (&'83) I' \ Sheet 1 of ! STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION CHANGE ORDER # 2 Co~.ctor Valley Pavina. Inc. S.P. No. 7001-62 HSAP 201-105-03 ~ess 8800 13th Avenue Eaat. Shakopee. MN 55379 F.P. No. Job Location orB 13/Fiah Point Road Contract No. In aocordance with the terms of this Contract, you are hereby authorized and Instructed to perform the Wor1< as altered by the followtng provisions: The attached pag.a ahow compenaating quantities to the exiating contract, reaulting in an increaa. to the contract in the amount ot $41,438.10. ESTIMATED CHANGE IN COST CONTRACT ITEM NO. ITEM NAME UNIT QUANTITY UNIT PRICE AMOUNT TOTAL $ CHANGE IN CONTRACT TIME Due to this change the Contract TIme: .. II' naeased () by deaeased ( ) b. Is not changed (x). Wor1<l ng ( ) Calender ( ) days. Issued by !:..::s:(I'IL -1...... L~ Plof~1IdenlICoulty ~ 3-30-93 0... c. may be revised If the work affected the controllng operation ( ). Approved by g~ Accepted by ~ ~. Iz~Repr.enIdve DatI ij-/-1.J DaN OrigInal to Contractor Copy to Centr. Admin. Engr. - Salmon Copy to Project EngIneer - Pink Copy to Materials ottIce - GoIdervod Rem tI) ConIl. ........ s.a.l.200 . .3e7 . - . .~ .. ~ ... utrld ~Dft' IlOIlI> rDW. CCMPDISAnIIO caA*& 0IlI)0 110. : MuQ )0, un r-:0Il LUZ, IIJ]IIIE.IO'I7o .F. 'OOl-.2~.I.A.F. 201-105-0) . TOrAL c:oIrnAC'f vau.a I~' I I.P. '001-" rAVDI 0lIlI~uw. rnw. DIITEI'DIC& AHOOIIf OlIlIGDW. rnw. DIJTV. nDC 110. DUCP.D'TI~ ~ nIc:& o.n OVAln'I'IT QOAX'2'I'IT +/- +/- QOUTrn OVAln'rn +/- ....___-----------r ---------- 2021. SOl a<<>an.lP%JQI 26,000.00 I..t:IMF .oM 1 1 0.1'1 0.1'1 2031.101 r~ orrJ~, '1"YPt D 4,000.00 u.aa 1 1 0.5' 0.1' 2101.501 ~ 1,100.00 ~ 0.1$ 0.15 2101.502 ~ 110.00 '11\J:E 45 50 5 550.00 )4 n 2101.506 QRDBB~ 1,500.00 ~ 0.15 0.15 2101.50' ~%NG IS.OO TIU:E 45 50 5 4'15.00 34 )I 2104.501 ~ ~ ,.. GIt7'l"rD. ).00 LIJI " 1181 2025 140 420.00 l'0 251 :104 .501 QHOVE )a:%AJ. on.vu:r. 6.00 LIJI " " " " " 2104.501 ~ n:ua I'IP& 6.00 LIJI " .4 U 15 '0.00 2104 .S05 ~ arztlouAOO. 'AVDCE117 0.10 ~m 1146' 11'" 3U 311.40 un 1211 2104.505 UHC/YE ~ PAYDa:IIT 2.10 -0 m 201 1" -)t (11.~1 n 6'7 2104.50' UHOYE CM'Ca USIJI 110.00 v.:a ) 2 -1 (110.001 2104.50' ~ WOOD UcaT ~u: ~ ~JlE 110.00 u.aa 1 -1 (110.001 1 2104 .50' UHOYE WE"%Al. Al'JUlIQ 30.00 EA.CII 3 ) ) 3 2104.$Ot UHC/YE CIOIICQ:.TE APMU 15.00 u.aa 3 1 -2 11'0.00) 2 2104.50' UHOYE CAft1JIGI 15.00 u.aa 3 3 2104 .513 aAWDIG al"J'QaJlOU' I'AVEHDlT 2.35 LIJI " 2'01 2043 -U5 (1,562.'751 25" U'O 2104 .121 SALV10GIt SDIa I'nc '.10 LIJI " 52 52 2104.123 SALV10GIt IJ~ Zt.OO u.aa 11 11 . , 2104.IU ~V1oGIt ~ APMU 110.00 u.aa 1 1 2105 .SOl ~ CtCA~lc:. 4.10 co m U41 2n5 )t4 1,'U.20 UI n, 2105.10' ~I: J:XCA,VUIQI 4.10 co m "01 '7031 -5'0 (:,136.001 5652 5U' 2105.5:2 RLIC'2' GRAIIOIoM aoMCl'l 1.35 co m 415' Ill' 1251 ',130.)0 455' 5111 2105.12) OOMNOK BOKROW (EVI 3.41 co m 25no 22244 -"U (12, Ul. '01 lU12 16241 - 2105. 5)) ~VN:;J:D ~UE (J:V) 5.15 co m 221$ 221$ 2215 2215 211'.501 ~ SOJU"ACIJI(;, c::LASa 1 15.00 'JQI 11 1'7 2130.501 tIUEIl 11.00 ~ 50 -50 ('00.001 25 2211.501 ~ aACE, c::LaU 5 '.00 '1'l* "00 10110 3UO 23,460.00 45" 6800 2)) 1. 510 'rY1'& )1 aDlDEll 000JI.n ~ U.50 'JQI 420 556 13' 2,652.00 un .114 rtJ'E n ~ CXlOUE aax::rtIJlE It.OO 'JQI 1360 2'" ., 1,653.00 lU6 lIU U31.511 arrtaaJlOO' ~ l'OlIl I'A2'CaDIG 150.00 'JQI 62 '0 . 1,200.00 62 5. U31.510 ':YPE U aDlDEll CJClItmSI: ~ U.IO 'JQI "3 113 100 1, tlO.OO 11) In un.501 ralt u wu.JUIIG c:CJOI\SZ ~ 21.50 'JQI 120' lno 421 ',0$1.50 785 1012 235'7.502 a~S ~ l'OlIl ua: ex>>:: 1.20 cau.c.zs 1314 1185 411 5".20 15) 1030 0403.60) J:XrDID '.rDfBD. 1D.LL 11.50 10" 40 ))) 2U 3,3".50 0411.603 0ClIICIU:U IlLOCI: JU:V.IJ(1JIG WALL, 1-0' -4' 11.50 IQ" 1" 612 50) 5,784.50 0.. 11 .60) CQNCJU:'ZI: IlLOCI: JU:V.IJ(1JIG WALL, 1-4' .,. 11.10 IQ" 31' 41'7 31 "1.40 0411.603 CXlIICIU:TE IlLOCI: ~ WALL, '-6' -I' U.OO 10 " n6 2n -413 (4, '56 .001 0411 . 60) CCIIlCRE'rI: IlLOCI: JIZ:'U.IJIlJIG WALL, ....' -11' 12.'0 SO " 112' 1146 1'7 U5.to 2411.50' ~ BEODIJI(; (cy) 15.00 co m 46 60 14 210.00 U51.513 rDIE rII..2:EIt AQGP.r.GAft (cy) 11.00 co m 1st 205 46 506.00 250 1 .511 11- JU: 1'11'& ClDIoVEll:r 12.25 LDI " 10 12 -I (118.001 10 '2 2501 .511 36- CII .11'& ClDIoVEll:r U.OO LIJI " 12 12 12 12 2501.515 15. JU: .11'& Al'1ll* 450.00 v.:a .. ) -1 (450.001 ) ) 2501 .115 18- JU: .11'& Al'1ll* 410.00 u.aa . 4 2 2 2501.513 DIftAI,.J. HI!:UJ. Al'au:. 60.00 u.aa 1 1 0501 . 602 JlUI.,DJ:llD o:n.VJ:Il:I' 60.00 u.aa 2 2 2 2 0501.602 'l'AA.D'~ J"OIl. 18- I'DC APJtCII 26..00 u.aa 1 1 0501.602 nASa ~ J"OIl. U- 1'Il'E Al'N* 240.00 EA.CII 1 -1 (240.001 2502....1 4' p~ '.rP I'DI: DI\ADI 10.10 LDI " 283 )65 12 I"."CO 0502.601 'llECAS'J' ~ UADWlU.Z. lto.oo u.aa 2 2 250).541 15- JlC .11'& ~ DES )006 2).60 LIJI " "2 '735 5) 1,250.80 402 400 250).541 15- JU: .11'& ~ DE.S )006, 0. III 23.60 LDI " '0 11 -52 (1, ::0:, .201 - . 2503.~41 15- JU: 1'11'& ~ DU JOOt, C. IV 23.60 LDI " 62 62 250).541 11- JU: 1'11'& ~ DES )006 26.00 LDI " 226 :25 -1 (26.00) 250).541 11' JU: .11'& ~ DU JOG6, 0. III 26.00 LDI rr uc 135 1 26.00 210).541 18- ItC .11'& ~ DES JOOt, 0. IV 26.00 LDI rr 200 20) ) 18.00 2IO).ln DIftALL le- IIIC I'IP& RIID. '.00 LDI rr 52 51 -1 (1.001 250).n) DIftALL 1.. IIIC I'DC AP~ w/'nIAU GOAJa) 110.00 u.aa 1 1 0504.602 ItDJf1ft V>>.VC ~ - D2D loe.OO UICIl 5 I ) 324.00 0504.602 N>JVft CUD .. 215.00 DCa J -) (645.00) 2SH .106 ~ MNmou:" IlCS I' 110.00 LDI " 41.2 56.2 I 110.00 2506 . Ie" CXl&ftJIIIIC'.r c:ua auDIa, IlCS G OIl a 211.00 LDI rr 31.2 "., -0.6 112'.001 15.' U.' 2SH.50' CiCMS'%'JlDCr c:a2CII auDIS, IlCS LI' .-4 1,500.00 u.aa 2 2 2506.511 ~.....OI.I:I 150.00 LDI rr 13.) u.) 10.6 10.6 2SH.516 ~ A-'-'OY'" 210.00 DCa 16 11 1 210.00 . 6 2SH.S:!1 DftALL ~ fS.OO u.aa 2 ) 1 65.00 1 1 2SH.5%2 N>JVft I'IUlI& Am IUJIG c:un1IlO 155.00 DCa , , 1 1 OSH. 602 ~ DI20 I:z:lftDlG .. OIl c:a 210.00 DCa 4 4 2511.501 ~ ~. CL II 1t.00 co 'm 14 JI 2. 1,416.00 4 11 2111.111 GIWl'l7LAJI. rD.2D '.00 co'm 6 13 , 56.00 2 4 2.21. &01 4. CiClIIC2lJ:ft 1IlU.It 1.45 IQ" J41' )526 110 lSt.&O 10" 10" 25;:1. &01 ,- CXIIl'CJlI::rE 1IlU.It 2.20 IQ" U5 125 .. ... .. Fnuz. ClClllrDl..uDIG c:&AIIGE 0fIIDD. 110. I 7... U/I'UI ~DIf IllOAD ruoa s..u:&. I(JJ8IUO'Uo '.r. 7001-f2~.'~'P. 201-10t-03 tkr8 30. UU 1- 1'O!A.L c:x.rtUoCT-----I-----..,. '001- ~GDCAL rDlAJ. DII'I'DDa ANOUM7 o..IGDlAJ. r~ DIrn OKn OONffITT OOAX'J'rrT +/- +/. QCWr1'ITT oo.\lITtT'l +/ ~ PAVDIG W1T '1Uc:& J:TD' 110. IlUa.IPTI~ .. .to..________________________ ---------------- --- 1130 5fH un 2 " 164 1 25. 6 5 6525 .0 .0 3UO 2311 202 16. .U 1 100 1600 1.52 5. 15 6315 1040 3.1 304 U'3 fl6 4022 U,. 16U 2 ., 164 1 2n . 6 10300 U 13 3n6 511. 153 568 "2 1 'U 411 1..0 76 15 518. no 3.2 304 1518 fl6 2U: -::2.. 2131..01 catCJU:n c:ou AIIlD Gl'JTTEP., DU a.24 un. 501 (lCIICJII:'l'J: CVJta AIIlD Gl'JTTEP., J)U au 4 2531.103 ~ aa:DlAJI 0131.602 ~ NEDlAJI )lOR 2531. S07 f. ~ DIUVE10J 'AVDCER'l 0557 .603 1IOOODf l"DICI: 016) . 601 n-uTIC ClCIM'7:1lOL 256...31 r , I '1~ PARELI, TlYt C 056' .602 rAYJ::IG:1n' JG:SSAQ (1.1' ~ POLY ,JIUOIlM 0564.f02 'AVDG:Bf ~ (1t2' ~ POLY'UJ'OIQf 056..603 .. SQLUI Lx.!: warn PADl1' 0.64 .603 U. STOP LDIE am: I'ADI'f 0564.603 24- STOP LDIE am: ,ADft 05".603 4' SOLID LDIE TEt.LOW I'ADft 0564 .603 C- DOOBL& IOLID LDIE n:u.ow FAIJIT 0$".603 12' ~ LDI& n:L1.oll ,ADft 0$64.603 24' ~ LDIE n:L1.oll pADft 056. .604 CIloOSSlQIJt HAJUaJIG POLY nEI'OIQI& 2165.111 nn.L ,. N:f '% OOIITI\DL IIQQL ITrrrH 2573.501 aALZ CBZCK 25"73 .102 .~ 1'I:lfCZ. JD:AVY DO'n' 2575.101 n:EDIRG 2575.502 n:ED, HIX2VU 500 2575.502 n:ED, HIX2VU 1000 2575.505 ~IRG. 'n'PE LAJII( 25'5.505 SODDIRG, ~E ~SIar 2575.511 Hn.CII MA:!'EIUAL, ~E 1-3 2575.512 Hn.CII HA:l'CJUAL, ~ 2-3 2575.523 1IOOD rIJID. aLAHaT' 25'75.532 ~1AJ. FEla'ILUD. ARALnu 10-20-20 6.50 6.05 14.00 '00.00 20.50 45.00 18,000.00 2'.00 1U.05 13'.05 0.25 1.36 1.n 0.25 0.47 1.36 1.n ..17 '0,000.00 '.00 3.00 3,500.00 3.00 '.00 2.10 2.10 250.00 '.30 1.15 0.30 UJI " LDI " 10 1D E.Aa 10m LDI " t.tIWr' ItW 10 " ua EN:a LDI " LDI " LDI " JoDI " LDI " JoDI " LDI " 10 " SlG IT, E.Aa LDI " AOI& POOMD POOMD so m 10 m 1QI ~ 10m POOIIID 14,24'.00 (13, '0'.t51 1130 :n.. un 2 to:2 n. 1$35 2 21 nO.50 0.57 In 4 5 4:.5 .0 .0 3055 1337 0.S7 In 6 6 "" U 13 U16 34" , 2 1 37n -7 3 116 2.01 -u 400 -72 252.00 271.10 13'.05 J(3.71 ('.52) ..13 46.50 1,316..7 (u....) 6...00 (300.U) 16. .... 0.50 50 ISO 1.23 .. 11 362. 1040 2.5 246 llf'7 n. 5" ,U 0.50 37 1<<1 1.35 51 11 342. 570 2.5 246 tI. n. -21 -l1n 0.2' 18 (216.00) (3,417.00) "0.00 54.00 -." -470 .1 (1,OU.70) ("7.00) 25.00 -)(15 ('U.15) SUIlTOD.L SUl'PLDIDI'ZAL AGRJ:DG:II'2' 110. 1 2104 .501 GW.RDRAIL ~ 2331.1112 arI'lllQ:lrOOs LI:YE1.DfG COOI\S& 0550.601 S1l1JfCO AIlU' aIJIGU 25" .501 ~ JlIS"V.LI.AnQl 25" .521 PLAn ARCBOIl.S 25".523 'l'WIS'IEI) Da) ~ 2564 .531 nn -P"' SIGII I'.ANJ:LI n',64'.65 + 1.:5 LDI " 310 310 310 310 + 20.55 1QI 220 303 I) 1,713.t5 :20 303 + ',003.15 U>>&' stat 1 1 1 1 + 1:.20 LDI " :50 250 250 250 + 250.00 E.Aa 1 1 1 1 + 620.00 EACJI 1 1 1 1 + 2..00 S(.>" 20 20 20 20 ----------- $1,713." + '36.00 E.Aa 2 2 2 2 + 1... 10 m 256 256 256 256 + 14.31 so " 24 24 2. 24 + 26.00 SO" 28.5 28.5 2'.5 21.5 SUIlTOD.L lRJPPI.DtER'lAL ~ 110. 2 0504 .602 1.owD. WAD:Il SERVICES 2511.515 G:I:OTJ:lC7n.& I'UJUC 256. .531 -m:GIJrS ~) - SIGal rlUU:LS 2564 .531 ~& -P"' SIGII I'.ANJ:LI stI1I'%O'rAL lRJPl'LDG:M'rAL AGRJ:DG:II'2' 110. 3 2105. 541 ~1IOD. ~ (LV) 2564 ."1 DEI.~ 'rYl'J: a SUII1'OUIo + 11.50 c:u m 335 341 6 ".00 335 341 + 31.00 EA:I 6 , 3 11..00 6 6 ---------- ----- UU.oo + o.ao 80 m 12 72 + 2.35 LDI " US 265 + 11.50 c:u m 211 20e -, (103.50) + '.00 'DI U 22 + 110.00 'DI 13 11 + 13.25 10" 30 30 + 20.50 LDI " 215 211 + 2'0.00 E.Aa 1 1 + 3.65 10m 215 211 IU03.50) 2,830.54 I.mtP ItW 1 1 + .41,438.10 Mln"LDIEIIUL .aG:RJ::DCEIft 110. C 2104.505 aJ:HCIft ar.rtHDlOOS rAYDtEII'f no<< .IU ~ B1'2"CKDIOOS 'AVIH:ft 2105.525 ~1IOD. ~ (LV) 2211.501 ~ BAA. c:LAU I 2~~1.ll' a~a IIIXl'UIl& rea rA:CllDIG 2'11.111 CIQAUZ ru.:ra ~ 21502.111 C- n PU& IlaADI 0506.602 ~ JJm) EXIftDIG .. 0.. CB 2511.1'" -...-.......In.& n:I.D:a ftH J svnorAL 5OP~ ~~ 110. 1 3 PAIln' PJV%S%QI or TODL ....n.n svnorAL 'Jo:rAI. CIUIItGE CIlDD ~. 2