HomeMy WebLinkAbout12 - Westbury Ponds
AGENDA NUMBER:
PREPARED BY:
SUBJECT:
DATE:
INTRODUCTION:
BACKGROUND:
13
HORST W. GRASER, DIRECTOR OF PLANNING
WESTBURY PONDS PRELIMINARY PLAT
MAY 17, 1993
Westburr Development Corporation has submitted
a petit10n for preliminary plat for Westbury
Ponds consisting of 97 single family lots.
The Planning Commission conducted a public
hearin9 March 14, 1993, to consider the
prelimlnary plat. The Engineering Department
recommended approval to the Planning
Commission with four contingencies dealing
with stormwater management, grading, and
utilities. The contingencies have been
resolved as follows:
1. A NURP pond was required northwest of
Lots 11 and 12, Block 1, necessitating a
30 foot access between Lots 11 and 12.
The result was Lots 12 19, Block 1,
were moved easterly 30 feet causing a
5300 square foot loss to the park.
2. The old borrow pit west of Lots 8, 9, and
10 (now classified a wetland) will be
dredged out and used for a stormwater
management pond (NURP pond). A trail
connecting willow Lane will be the
northern boundary of this pond.
Public testimony
issues:
included
the
following
1. Preservation of the wetlands and wildlife
systems.
2. The effect of construction on the natural
areas to the north of the lots.
3. Increase in traffic and can the streets
accommodate it?
4. 'When will a signal be installed at Five
Hawks Avenue and STH 13.
5. Lot sizes were too small.
The Planning Commission found the preliminary
plat to be consistent with the comprehensive
plan and in compliance with the Subdivision
Ordinance (see attached Resolution 93-34).
4629 Dakota St. S.E., Prior Lake, Minnesota 55372 I Ph. (612) 447-4230 I Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLDYER
ALTERNATIVES:
RECOMMENDATION:
ACTION REQUIRED:
Although the Planning Commission was aware of
the alternative development plan and it was
entered into the record, however, it was not
included in their motion.
Staff is re~esting the Council include in
their conslderation an alternative eyebrow
cul-de-sac design. staff is suggesting that a
center island be introduced to reduce the
large area of blacktop. The right-of-way
would have to be increased by 10 feet. It
will not reduce the number of lots.
1.
Approve the preliminary plat by adopting
Resolution 93-34.
Continue the ~reliminary plat hearing.
Deny the prellminary plat.
2.
3.
Alternative 1
A motion to adopt Resolution 93-34.
"RS9334"
RESOLUTION 93-34
RESOLUTION OF THE PRIOR LAKE CITY COUNCIL ESTABLISHING FINDINGS
OF FACT AND CONDITIONS TO APPROVAL OF THE PRELIMINARY PLAT OF
WESTBURY PONDS.
MOTION BY SECONDED BY
WHEREAS, the Prior Lake Planning Commission conducted a Public
Hearing on the 4th day of March 1993, to discuss and to
act on an application submitted by Westbury Development
Corporation for a Preliminary Plat in accordance with
section 6-3-2 of the Prior Lake Subdivision Ordinance.
WHEREAS, notice of the hearing on said motion had been duly
published and posted in accordance with the a~plicable
Minnesota Statutes and an opportunity was prov1ded for
all interested parties to comment and be heard; and
WHEREAS, the Planning Commission determined the proposed plat to
be consistent with the Comprehensive Plan and has
recommended approval of the Preliminary Plat subject to
the following conditions:
1. The sanitary sewer, watermain, and street plans
must be subject to the approval of the city
Engineer.
2. The stormwater management, storm water, grading,
and erosion control plans must be subject to the
approval of the City Engineer.
3. Appropriate drainage ahd utility easements be
provided acceptable to the City Engineer.
4. Additional recommendations in the memo from the
City Engineer.
and;
4629 Dakota St. S.E., Prior Lake, Minnesota 55372 I Ph. (612) 447.4230 I Fax (612) 447-4245
AN EQUAL OPPORTCNITY E."'1PLDYER
WHEREAS, the Planning Commission granted block length variances
Block 6 for 415 feet, Block 1 for 371 feet, and Block 7
for 30 feet.
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE TO
APPROVE THE PRELIMINARY PLAT OF WESTBURY PONDS SUBJECT TO THE
FOLLOWING CONDITIONS:
1. The three eyebrow cul-de-sacs be redesigned to include a
center island or eliminated. '
2. The City of Prior Lake, Developer, and School District
719, have signed a letter of understanding which sets
forth an alternative develo~ment plan for the easterly
half of the plat. All partles understand that a replat
will be necessary to implement the alternative
development plan.
Passed and adopted this 17th day of
YES
May
, 1993.
NO
Andren
Fitzgerald
Kedrowski
Scott
White
Andren
Fitzgerald
Kedrowski
Scott
White
Horst W. Graser
Director of Planning
{Seal}
.I
"
..:-
"CU9304"
PLANNING REPORT
AGENDA ITEM:
SUBJECT:
2
PUBLIC HEARING WESTBURY PONDS PRELIMINARY
PLAT AND VARIANCE REQUEST
WESTBURY DEVELOPMENT CORP., SAVAGE, MINNESOTA
JAMES HAYES, ASSOCIATE PLANNER
X YES NO
MARCH 4--;-1993
APPLICANT:
PRESENTER:
PUBLIC HEARING:
DATE:
INTRODUCTION:
The purpose of the public hearing is to consider two distinct
applications: Preliminary plat consideration of Westbury Ponds;
and variance applications to allow increased block lengths of
three blocks within the subject site. The two applications are
being considered contemporaneously because of the
interrelationship of the subdivision to the development proposal.
However, it is necessary to distinguish between the applications
in the review process since the subdivision and variance process
are separate issues. A separate motion in the form of a
recommendation to the City Council, will be required. Each motion
should be supported by findings of fact, performance criteria and
hardship findings relevant to the specific application.
The attached agen~a packet contains the application for
subdivision and varIance application along with a written
proposal prepared by the developer, supporting maps and data. The
applications are followed by a packet containing memorandums from
city staff and other affected agencies received as of March 1,
1993. Finally, the public hearing notices and maps published in
the Prior Lake American and mailed to approximately 200
residents, business owners, utility companies and affected
agencies.
SUBDIVISION REVIEW:
The preliminary plat of Westbury Ponds is being processed as a
standard subdivision with the procedures and requirements
outlined in Section 6-3-2 of Subdivision Ordinance 87-10. The
subject site consists of approximately 60 acres bounded on the
south by S.T.H. 13 and the existing and proposed plats of West
Edge Estates (a Townhouse Project), on the east and northeast by
Five Hawks Avenue and Five Hawks Elementary School, on the north
by Pershing Avenue and the older plat of Spring Brook Park, and
on the west by the plat of Willows Sixth Addition. See Exhibit A
for the subject site area location map.
4629 Dakota St. S.E., Prior Lake, Minnesota 55372 I Ph, (612) 447-4230 I Fax (612) 447-4245
AN EQUAL OPPORT1JNlTY EMPLDYER
The bulk of the property has been under cultivation except the
pond areas to the north and northwest and the areas with
boxelder growth near the farm buildings and ravines. The pond
areas are wooded with a mixture of tree types and sizes. There
are several areas that are becoming eroded because of storm
water runoff from the south, the main problem is along the
westerly boundary with the willows sixth Addition plat.
The ~roposal as presented is for preliminary plat approval to
subdlvide the property into 97 single family lots in two phases.
Phase 1 as shown on the preliminary plat contains 42 lots. Phase
2 would contain the remaining 45 lots. The proposal will provide
for a sidewalk along the northerly side of Willowwood street from
willow Lane to Five Hawks Avenue and a six (6) foot earth berm
along the Highway 13 right-of-way with lilac and sumac cover on
top. Also as a part of the proposal the developer will dedicate
to the City the park area and deed the area contained in Outlot
A, on the plat to the city.
The access to the site from Highway 13 will be via County Road
No. 12 and willow Lane for phase one of the ~roject. After
completion of phase two the property will access Hlghway 13 from
Five Hawks Avenue and the proposed willowwood street. This
intersection will eventually receive signal lights thereby
improving the safety of access for the Five Hawks School busses.
The proposed roadways will also allow an access to the west and
north for the school busses without entering Highway 13.
It is the intention of the developer to have custom built frame
houses with attached garages and a mixture of individual house
designs using earth tone color or wood exterior finish. The
house size and type will be similar to the houses constructed in
the willows sixth Addition. Sales are anticipated to be in the
$110,000 to $135,000 range.
Assessments:
See memo from Ralph Teschner dated February 19, 1993 for details.
The subject site has been previously assessed for water and sewer
improvements under project 72-7 in 1974. All past applicable
deferred assessment amounts have been called and distributed
against the land. The tax status of the property is in a current
state with no outstanding delinquencies. The subdivision is
subject to a unit assessment for Water and Sewer ($601.48/lot);
Street Overlay sum ($908.20); a Stormwater Management Fee
(16.8 cents/sq. ft.) and a Collector street Fee of
($700.00/acre). Total City fees required for the development of
the subdivision amount to $324,088.77, which will be collected
upon entering into a developer's agreement for the utility
improvements.
Comprehensive Plan:
The Planning Commission held a public hearing for the
comprehensive plan amendment and rezoning on August 6, 1992. The
commission recommended approval of the amendment to the
comprehensive plan for Westbury Ponds from medium density to low
density residential and that the zoning map should be amended to
reflect a rezoning of the site from R-3, Multi-family
Residential and B-3, General Business to R-1, Single-family
Residential. The city council subsequently approved the Planning
Commission recommendation for these amendments on September 8,
1992. Thus, the development of Westbury Ponds is consistent with
the comprehensive plan of the City of Prior Lake.
Gradinq & utility Plan:
See memo from Larry Anderson dated March 1, 1993 for details.
Predevelopment stormwater runoff flows northerly into the ponds
and northeasterly via the northeasterly pond into a creek and
then into Prior Lake. A large amount of stormwater flows onto the
southwest corner of the site and into the smaller northwesterly
ponding area. This runoff has caused some severe erosion problems
along the westerly boundary of the property. Preliminary review
of the site indicates that on site ponding of surface water
runoff to maintain water quality will be necessary for the
requested improvements. All storm sewer easements needed for the
site will be provided with the final plat submittal after the
final plans are approved by staff.
The drainage problem which exists in the area abutting this ~lat
will be corrected by filling in the hole created by the prevlous
developer. The hole is on lots 2 - 5, Block 1, Westbury Ponds
First Addition. The storm water will be routed through a
proposed pipe in willowwood street and Dunkirk Avenue. The hole
on Lots 2 - 5, Block 1, will be filled and the drainage problem
corrected.
There are some steep slopes along the north and west sides of the
property between the pond areas and the area being proposed for
development. These areas will be protected with silt fencing and
by seeding the disturbed areas as soon as ~ossible after site
grading is completed. As required by C1ty Ordinance, proper
erosion control and runoff containment will be maintained auring
construction of the houses. Upon completion of the building
construction and utility hookup all disturbed areas will be
dressed off and covered with sod.
Park Dedication:
The park dedication requirement for Westbury Ponds will be an
area of 2.78 acres on the northeast edge of the site abutting the
Five Hawks School property. It is understood that this area will
be available to residents as well as students during the daytime
hours. In addition, 15.9 acres will be deeded to the city as
Outlot A which contains wetlands and steep slope areas. This
park acreage may be exapnded in future plans during phase two of
the development.
General Discussion:
The proposed subdivision can be considered an infill property in
Prior Lake and is restricted on all sides by adjacent
residential, transportation, or natural areas. These site
restrictions require variances for three blocks within the site.
MnDOT has discouraged additional road access to T.H. 13 which
has compelled the developer to plat the parallel block #6 to
extend for 1415 feet, which requires a variance of 415 feet.
Block #1 will also require a variance of 371 feet because of the
constraints of the wetlands bordering the site on the north and
northwest. Finally, block #7 will also require a variance due
to the constraints of the school property and park dedication
which border the site on the north. This variance is only 30
feet but still must be addressed in this application.
The city is currently working with the school district and the
developer to dedicate additional land for school property. The
school district is attempting to find suitable land for an
additional school building. This may entail a joint powers
agreement in which there would be a land exchange between the
school district and the developer. All of this information will
be presented at subsequent meetings.
Alternatives:
1. Find the preliminary plat of Westbury Ponds in compliance
with the Subdivision Ordinance contingent upon:
a) The sanitary sewer, watermain and street plans must be
subject to the approval of the City Engineer.
b) The stormwater management, storm sewer, grading, and
erosion control plans must be subject to the approval
of the City Engineer.
c) Appropriate drainage and utility easements be provided
acceptable to the city Engineer.
d) Additional recommendations in the memo from the City
Engineer.
2. Deny the plat based upon specific findings.
3. Continue the hearing for specific purposes or lack of
information or detail.
WESTBURY PONDS FIRST ADDITION
Page 3
PROPERTY ZONING CLASSITICATION:
The property is presently zoned R-1 Single Family Residential and the
requested use for this project is also R-1 Single Family Residential.
PROPERTY LOCATION:
The property is bounded on the south by State Highway 13 and the existing and
proposed plats of West Edge Estates (a Townhouse Project), on the east and
northeast by Five Hawks Avenue and Fi ve Hawks School, on the North by
Pershing Avenue and the older plat of Spring Brook Park, on the west by the
plat of Willows Sixth Addition.
EXISTING SITE CONDITIONS:
The bulk of the property has been under cultivation except the pond areas to
the north and northwest and the areas with boxelder growth near the farm
buildings and the ravines. The pond areas are wooded with a mixture of tree
types and sizes. There are several areas that are becoming eroded because of
storm water runoff from the south, the main problem is along the westerly
boundary with the Willows Sixth Addition plat.
Public sani tary sewer, water and electrical services are available t'o the
site at this time.
EXISTING STORM WATER RUNOFF:
Predevelopment stormwater runoff flows northerly into the ponds and
northeasterly via the northeasterly pond into a creek and then into Prior
Lake. A large amount of stormwater flows onto the southwest corner of the
site and into the smaller northwesterly ponding area. This runoff has caused
some sever erosion problem along the westerly boundary of the property.
Preliminary review of the site indicates that on site ponding of surface
water runoff to maintain water quality will be necessary for the requested
improvements. All storm sewer easements needed for the site will be provided
with the final plat submital after the final plans are approved by staff.
WESTBURY PONDS FIRST ADDITION
Page 4
STEEP SLOPES AlID EROSION CONTROL MEASURES:
There are some steep slopes along the north and west sides of the property
between the pond areas and the area being proposed for deve1opement. These
areas will be protected with silt fencing and by seeding the disturbed areas
as soon as possible after the site grading is completed. As required by city
ordinance proper erosion control and runoff containment will be maintained
during construction of the houses. Upon completion of the building
construction and utility hookup all disturbed areas will be dressed off and
covered with sod.
VEHICULAR ACCESS
The access to the site from Highway 13, will be via County Road No. 12 and
Willow Lane for phase one of the project. After completion of phase two the
property will access highway 13, from Five Hawks Avenue and the proposed
Willowwood Street. This intersection will eventually receive signal lights
thereby improving the safety of access for the Five Hawks School Busses. the
proposed roadways will also allow an access to the west and north for the
school busses without entering highway 13.
ARCHITECTURAL STAlIDARDS
It is the intention of the developer to have custom built frame houses with
attached garages and a mixture of individual house designs using earth tone
color or wood exterior finish. The house size and types will be similar to the
houses constructed in the Willows Sixth Addition. Sales are anticipated to be
in the $110,000 to $135,000 range.
WESTBURY PONDS FIRST ADDITION
Page 5
r
REQUEST FOR SUBDIVISION
The proposal as presented is for preliminary plat approval to subdivide the
properly into 97 single family lots in two phases. Phase 1 as shown on the
preliminary plat contains 42 lots. Phase 2 would contain the remaining 45
lots. The proposal will provide for a sidewalk along the northerly side of
Wil1owwood Street from Willow lane to Five Hawks Avenue and a 6 ft. earth berm
along the highway 13 right-of-way with lilac and sumac cover on top. This berm
should greatly reduce the traffic noise generated by highway 13.
Also as a part of the proposal the developer will dedicate to the City the
park area and deed the area contained in Outlot A, on the plat to the City. it
is understood that the City Park Department will construct the 8 ft. nature
trail shown on the plat.
SITE DATA & DENSITIES:
GROSS AREA OF PLAT
59.80 ACRES
OUTLOT A OF PLAT
15.90 ACRES
PROPOSED PARK AREA OF PLAT
2.78 ACRES
AREA OF STREET R/W IN PLAT
8.09 ACRES
33.03 ACRES
NET AREA OF PLAT
TOTAL PROPOSED LOT
97
NET DENSITY
97/33.03
2.94 DU AC.
PAGE 6
Introduction
This is an inventory of the forestry cover type for the preliminary plat of
Westbury Ponds. '
Considering the many different treed areas of the plant, I have separated out
certain areas for ease of explanation, They are as follows:
A. Isolated areas of Boxelder
B. Open, uncultivated areas
C. Low wet areas bordering the wetlands
D. Steep areas bordering the wetlands
E. Conibination of wet and steep area near the wetlands
F. Small stand of Black Walnut
See Appendix A for a list of forestry tenns and scientific names
of trees mentioned in this report.
A. Isolated Areas of Boxelder
· These are areas that have not been fanned because they were too
steep to be tilled or because it was part of the fannstead.
· Boxelder. a weak. fast-growing tree dominates these sites because they
out-compete other species.
· These sites have been dumping grounds for old fann machinery.
· Most trees on these sites are old growth (30+ years).
· Regeneration of Boxelder and Elm occur in thinner populations.
B. Open, Uncultivated Land
. Sumac and Elm are being established,
· Trees are small, generally about 2" caliper.
PAGE 7
C. Low Wet Areas Bordering the Wetlands
Area C1 has a few old-growth larger remnants,
. A very large (estimate 5' dbh) Ash tree grows here. Possibly a record.
. A large Bur Oak (24"+ dbh),
. Regeneration consists of Boxelder, Elm, Green Ash, Hackberry, Bur
Oak, and Red Oak.
. Regeneration is mostly Boxelders with diameters of 4-10" dbh.
. Young tree population is average.
. There are a few scattered Willows and Cottonwoods in this site.
Area C2 consists mainly of Cottonwood and Willow
. Diameters range from 6-12" dbh.
. Regeneration is Boxelder.
. This area is wet most of the year.
. Populations are average to thin.
D. Steep Areas Bordering the Wetlands
Area 01 is predominantly 4-5" dbh Ash trees.
. Population of young Ash trees is high,
. Small Red Oak and small Boxelders also grow here, but their population
is small,
Area 02 (along Pershing Avenue) consists of large, sparsely populated
Bur Oak. A large Basswood and Red Oak was also found.
. A thick population of Basswood and Oak (2-6" dbh) are established.
II
_.....__...._.-...........__.... ,__..__". . r-__...-~...,.-.......".., ............-_.__
PAGE 8
Area D3 has Sugar Maple and Bur Oak.
.
Trees are mature and population is light.
.
Mature trees are 16-20" dbh.
Regeneration is Sugar maple (under 2" caliper).
E.
Combination of Wet and Steep Areas Around Wetland
.
Predominate tree cover is 10-16" dbh Cottonwood.
.
Swamp Willow established at wetland edge.
.
New growth is Elm and Boxelder.
.
Populations are average.
F.
Stand of Walnut
.
This stand exists within Area D
· A large Slack Walnut (est. 20" dbh) is probably the seed source for
newly established trees.
· 10-20 Black Walnut trees of 4-6" diameter are fond in this area.
· - The large Black Walnut is not a high value lumber or veneer tree. Most
of its value is for wildlife.
Conclusion
· The large high-quality trees that are found on all sites are very susceptible to
construction damage, either by filling over with soil, compaction from
equipment, or excavation.
· A minimum safe distance from these trees would be the drip line (the area
around the base of the tree that is determined by the outermost edge of the
branches),
· If drainage patterns change, soil and moisture conditions will change, thus
affecting the health and vigor of the trees.
PAGE 9
· It is a good practice to keep desirable small trees because they can survive
construction and eventually replace the old trees when they die,
· Most all trees on this site have a small value for the lumber they can
produce, but their value is in the benefit they provide to the wildlife and
esthetics to the people.