HomeMy WebLinkAbout6 - Busse First Addition Preliminary Plat & CUP AGENDA NUMBER: PREPARED BY: SUBJECT: DATE: INTRODUCTION: DISCUSSION: 6 HORST GRASER, DIRECTOR OF PLANNING CONSIDER APPROVAL OF PRELIMINARY PLAT BUSSE FIRST ADDITION, CONDITIONAL USE PERMIT FOR A SUBWAY CONVENIENCE RESTAURANT, VARIANCE. MARCH 1, 1993 The applicant Davann,Inc. and Bradley A. Busse have petitioned the city of Prior Lake for a subdivision review, conditional use permit to construct a Subway convenience store and two variance applications to facilitate the construction of the store on Lot 1, Block 1, Busse First Addition as proposed. The subdivision request is being processed in accordance with Section 6-3-2 of the Subdivision Code, the standard subdivision process. The conditional use permit is processed in accordance with Section 7.5 of the Zoning Code. The variances were approved by the Planning commission in accordance with Section 7.6 and will not require approval by the City Council. The subject site contains about 1.3 acres of B-1 limited business zoned land and is located adjacent to Jo-Anna Stepka's 2nd Addition which is a single family neighborhood. Staff met with Mr. Kopischke on several occasions to discuss and recommend that the buildin~ design be respectful of adjacent single famloly and business uses. The Planning Report (attached) suggests an alternative driveway entry closer to the intersection of STH. 13 and Duluth. City Engineer Anderson was present at the 2-4-93 Planning Commission public hearing to discuss his memorandum (attached) and traffic movements relative to the subject property. He recommended that the alternative access would adversely affect traffic by resulting in an unacceptable stackin~ distance for the 5TH 13 and Duluth intersect loon and poor ingress and egress to the site. 4629 Dakota 51. 5.E., Prior Lake, Minnesota 55372 / Ph. (612) 4474230 I Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPlDYER ALTERNATIVES: RECOMMENDATION: Several members of the audience entered comments into the record which have been incorporated into the minutes of the Planning Commission meeting of 2-4-93 and are attached for your review. Please note that the minutes of the Planning Commission Public Hearing have not been officially approved by the commission. The Planning commission examined the facts and determined that Busse First Addition and Conditional Use Permit are consistent with the Prior Lake Subdivision Ordinance and Comprehensive Plan and moved as follows: MOTION BY LOFTUS, SECOND BY WUELLNER TO APPROVE BUSSE FIRST ADDITION PLAT SUBJECT TO ALTERNATIVES LISTED IN STAFF RECOMMENDATION AS (1) AN EROSION CONTROL PLAN SUBJECT TO THE APPROVAL OF THE CITY ENGINEER; (2) THE RIGHT-OF-WAY FOR DULUTH BE INCREASED BY 7 FEET FOR THE EASTERLY 152 FEET OF DULUTH AVENUE; (3) SEWER AND WATER PLANS MUST BE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER; (4) THE DIMENSIONS FOR LOT 1 BE ADJUSTED TO A MINIMUM LOT SIZE OF 20,000 SQUARE FEET. MOTION BY LOFTUS, SECOND BY WUELLNER TO GRANT THE SUBWAY CONDITIONAL USE AND VARIANCE IN PARCEL 1 TO INCLUDE A 15.05 FOOT SETBACK VARIANCE TO HWY. 13 AND 11 FOOT SETBACK FROM DULUTH AVENUE AND ALSO THE CONDITIONAL USE INCLUDE A VARIANCE OF PARKING SPACES BE REDUCED FROM 40 SPACES TO 27 SPACES AND CONDITIONAL UPON WEEKDAY HOURS CLOSING AT MIDNIGHT AND FRIDAY AND SATURDAY HOURS CLOSING AT 1:00 A.M. THE MOTION CARRIED 3:1; AYES LOFTUS, WUELLNER, ROSETH, ARNOLD. NAYES; GREENFIELD. The applicant has submitted ~reliminary plat satisfactorily lotems 2 and 4. a revised addressing 1) Approve the applications for subdivision and conditional use as recommended by the Planning Commission. Deny the applications as applied for. Continue the hearings as may be appropriate. 2) 3) Alternative #1 MOTION REQUIRED: Two 1) 2) separate motions are required: To approve the preliminary plat of Busse First Addition as amended subject to; a.) Submission of an erosion control plan subject to the approval of the City Engineer. b.) Submission of sewer and water construction plans subject to the approval of the City Engineer. To approve the conditional use permit for a Subway fast food store on Lot 1, Block 1 of Busse First Addition subject to; a.) To limit the hours of operation as follows: Weekdays - midnight Friday & Saturday - 1:00 a.m. ). vi\. Y tAl \\~/ "CU9301" PLANNING REPORT AGENDA ITEM: SUBJECT: 1 PUBLIC HEARING BUSSE FIRST ADDITION PRELIMINARY PLAT; SUBWAY CONDITIONAL USE AND VARIANCE DAVANN INC., CHANHASSEN, MINNESOTA HORST GRASER, DIRECTOR OF PLANNING X YES NO FEBRUARY 4, 1993 APPLICANT: PRESENTER: PUBLIC HEARING: DATE: INTRODUCTION: The ~urpose of this pUblic hearing is to consider three distinct appllocations: Preliminary plat consideration of Busse First Addition; conditional use permit to locate a fast food restaurant (Subway) in a B-1, Limited Business zone; and variance applications to allow reduced setbacks from S.T.H. 13 and Duluth Avenue and reduction of required ~arking spaces for a fast food establishment. The three appllocations are being considered contem~oraneously because of the interrelationship of the subdivlosion to the development proposal. However, it is necessary to distinguish between the applications in the review process since the subdivision, conditional use and variance process are separate issues. A separate motion in the form of a recommendation to the City Council, will be required. Each motion should be supported by findings of fact, performance criteria and hardship findings relevant to the specific application. The attached agenda packet contains the application for subdivision, conditional use and variance along with a written proposal ~repared by the developer, supporting maps and data. The appllocations are followed by a packet illustrating sign options for Subway, a separate packet containing memorandums from City staff and MNDOT and finally the public hearing notice and maps published in the Prior Lake American and mailed to approximately 75 residents, business owners, utility companies and affected agencies. SUBDIVISION REVIEW: The preliminary plat of Busse First Addition is being processed as a standard SUbdivision with the procedures and requirements outlined in Section 6-3-2 of Subdivision Ordinance 87-10. The develo~er petitioned for subdivision review under Section 6-3-1, Abbrevloated Subdivision Process. However, it is impossible to segregate the subdivision and land use process since the 4629 Dakota 51. 5.E., Prior Lake, Minnesota 55372 / Ph. (612) 4474230 / Fax (612) 447-4245 AN EQUAL OPPORrUNITY EMPLOYER conditional use would not be valid for the site proposed, because Lot 1 will not exist until the subdivision is approved. The site contains approximately 1.3 acres and is located north and east of the intersection of Duluth Avenue and S.T.H. 13. The site is zoned B-1, Limited Business and is surrounded by R-1, Urban Residential to the west, R-2, Urban Residential to the north, B-3, General Business to the south and B-1, Limited Business to the east. The minimum lot size in the B-1 District is 20,000 square feet with a minimum width of 120' on a public road. Adjacent land uses correspond to the zoning district permitted permitted uses including, single family residential to the west, a four plex to the north, Prior Lake state Bank to the east and priordale Mall/ Marquette Bank to the south. The proposal is to divide the 1.3 acres into two lots as per attached preliminary plat map. Proposed Lot 2 contains 38,204 square feet and an existing parking lot ~arking lot currently used by Prior Lake state Bank to provlode convenient customer parking, close to the front entrance to the bank building. No use is proposed for Lot 2 at this time however, it is anticipated that a use conforming to the B-1 district requirements will be developed at a future date. Proposed Lot 1, contains 20,098 square feet and is the future site of the Subway restaurant. Both proposed lots meet or exceed the Zoning Code requirements for the B-1, Limited Business district. Assessments: See memo from Ralph Teschner dated November 4, 1992 for details. The subject site does not have water and sewer service available to the property. The developer will be responsible to provide a connection to utilities available within the street intersection of Duluth Avenue and Anna Trail. See attached Grading and utility Plan. The existing utilities were installed in 1959. The applicant will be responsible for the extension of the service lines for the purpose of connection to the City's municipal system. Since utilities do not abut the property and the developer would incur the service cost, the parcel would not be assessed front footage. The subdivision is subject to charges for Trunk Water and Sewer ($2750.00/acre); Stormwater Management Fee (20.3 cents/sq. ft.) and a Collector Street Fee of $700.00/acre. Total City fees required for development of the subdivision amount to $16,458.31 dollars, which will be collected upon entering into a developer's agreement for the utility improvements. Comprehensive Plan: There is little guidance offered by the 1981 Comprehensive Plan for the development of the subject site. The Comprehensive Land Use Plan and Zoning Map indicate commercial use for the site. Policy 3 of the Land Use Plan indicates that new business development should be confined to the Downtown and Brooksville Center areas. There is mention of the need to integrate the various business centers along the Highway 13 strip by improving pedestrian and vehicular access. S.T.H. 13 is classified as a minor arterial, designed to accommodate medium to short trips at moderate speeds. Minor Arterials also connect neighborhoods, subregions, and activity centers within the urban area. Duluth Avenue is classified as a collector which is intended to collect and distribute traffic to the arterial system at lower speeds. Access includes minor arterials, local streets and direct land access. The Comprehensive Plan indicates that sidewalks and trails are recommended along the entire major street system. The collector streets such as Duluth Avenue, connect all areas of the City and are conveniently located to provide suitable alternatives to travel by automobile. The SUbdivision proposal is consistent with the objectives of the Comprehensive Plan. Duluth Avenue is scheduled for upgrade in 1997 with the cost to be distributed between City and Municipal state Aid (MSA> funds. The existing 24' wide road will likely be widened to 32 feet with bike path and sidewalks and posted for no parking. The 1991 ADT for Duluth Avenue was 3,500 vehicles per day. The projected ADT for the year 2011 is 5,000 vehicles per day. The Subway proposal should not significantly affect traffic volumes along Duluth Avenue. Gradinq & utility Plan: The site is generally flat and contains no predominant natural features. The grading plan indicates that Lot 1 will be graded to accommodate the Subway restaurant and parking lot construction. The applicant proposes not to grade Lot 2 at this time, but to wait until a future development proposal is approved. storm water currently flows into the ditches located along Duluth Avenue and S.T.H. 13. The proposal is for the existing drainage patterns to continue. The proposed sanitary sewer and watermain plan indicates that sanitary sewer would extend generally southerly from Anna Trail along the west side of Duluth Avenue and cross under Duluth approximately between the tow proposed lots. An 8" water main would extend southerly along and cross Duluth Avenue near the sanitary sewer. A hydrant is proposed adjacent to Lot 1, along Duluth Avenue to provide fire protection. The Engineering Department reviewed the plat and development proposals and recommends the following. 1. An erosion control and grading plan for the site must be provided, acceptable to the City Engineer. 2. The right-of-way width for Duluth Avenue adjacent to the pro~osed plat should be 80 feet. Seven feet of addlotional right-of-way for Duluth Avenue must be dedicated adjacent to the easterly l55 feet of the plat. 3. The sewer and watermain construction plans must be approved by the City Engineer. Park Dedication: See memo from Bill Mangan dated, December 23, 1992 for details. The park dedication requirement for Busse First Addition will be a cash dedication in the amount of $5,830.00 dollars. General Discussion: The proposed subdivison would add two lots to the block currently developed with Prior Lake state Bank, the ~ost office and Carols Furniture. Although both lots meet the minlomum size requirements they will be the smallest lots in the block. Lot 1 will need to be slightly increased to account for the 225 square feet lost to right of way dedication required adjacent to Duluth Avenue. The subject site is perhaps one of the prime vacant sites available along the S.T.H. 13 Strip. Development will be a focal point in the Priordale Shopping area and serve as a transitional land use between S.T.H. 13 and the single family residential development to the west. Any development must be respectful of this relationship. To accommodate this objective the applicant should consider adjusting the common property line, increasing the building envelope and providing additional design and landscape flexibility for Lot 1. Lot 1 is not an efficient lot from a development perspective. It is bordered by roadways on three sides with setbacks of 50 feet from S.T.H. 13 and 85 feet from the travelled roadway of Duluth Avenue, resulting in a small and difficult building envelope. It is typical for inefficient lots such as this to be overbuilt and/ or to ask for relief via the variance process as will be the case in the Subway conditional use to be reviewed contemporaneously with the plat. Alternatives: 1. Find the preliminary plat of Busse First Addition consistent with the Comprehensive Plan and in compliance with the Subdivision Ordinance subject to: a) An erosion control plan subject to the approval of the City Engineer. b) The right of way for Duluth be increased by 7 feet for the easterly 152 feet of Duluth Avenue. c) The sewer and water plans must be subject to the approval of the City Engineer. d) The dimensions for Lot 1 be adjusted to a minimum lot size of 20,000 square feet. 2. Deny the plat based upon specific findings. 3. Continue the hearing for specific purposes or lack of information or detail. PLANNING COMMISSION MINUTES FEBRUARY 4, 1993 The February 4, 1993, Planning Commission Meeting was called to order by Chairman Roseth at 7:30 P.M. Those present were Commissioners Roseth, Arnold, Loftus, Wuellner and Greenfield, Director of Planning Horst Graser, Assistant city Planner Deb Garross, Planning Intern Jim Hayes, Acting Secretary Phyllis Knudsen ITEM I - REVIEW MINUTES OF PREVIOUS MEETING ITEM I - REVIEW MINUTES OF PREVIOUS MEETING commissioner Wuellner wanted second to the last paragraph on page one to read "water oriented structures should not only conform to setbacks and maintain minimum distance from high water elevation but also have permanent foundations." Last paragraph having to do with contiguous side by side lots also there was verbage in the ori~inal version having to do with lot size and lot width and Commisslooner Wuellner pointed out that there was a wider width at the building line than there was at 904 and that only applies to a very few of the lots on Twin Isle. The majority are pie shaped wider at the lake. The Draft as it was written would not apply to the ma~ority of the lots. The Ordinance should apply to the maJority of the lots that are available for development on the Island. The majority of lots are pie shaped narrower at the back and wider at the lake. On page 4 Commissioner Wuellner made the point that the comparloson of Prior Lake to other adjacent communities, i.e. Savage, Shakopee, Farmington, Lakeville, etc. "I think in most cases with this type of Shoreline Ordinances that it is irrelevant because Prior Lake is really a unique community because of the diverse topo9raphy we have and the fact. that the dominant feature of the area 1S the lake". Second point: in his opinion relative to the 18% coverage ratio issue, adequate two story and multi-level housing could be built with a three car garage in excess of 2000 sq.ft livable on the lots that were platted in the City to change community at problem. Commissioner Greenfield moved corrections of the minutes from of the agenda in the light heard. All agreed. area. He also felt that it is not prudent for the the entire Ordinance which affects the entire the request of one developer because he has a to table discussion of the the previous meetin~ to the foot of two public hear longs yet to be ITEM II - PUBLIC HEARING: BUSSE FIRST ADDITION Commissioner Roseth opened the public hearing at 7:40 p.m. to consider the SUbdivision, Conditional Use and Variance for Busse First Addition and Subway. Greg Kopischke of Westwood Professional Services represented Brad and Mary Busse. The proposal is to subdivide a 1.2 acre parcel, adjacent to the Prior Lake State Bank, at the intersection of Hwy 13 and Duluth Ave., into two commercial lots. The applicant proposes to develop a Subway convenience food restaurant on one of the two parcels. Mr. Kopischke showed renderings of the design of the building, landscape design which is in compliance the existing draft of the landscape ordinance, parking lot, etc. They are proposing to grade Lot 1 which is proposed for Subway, the standards relative to screening the single family area adjacent across Duluth are meant to allow for some screening or buffering of commercial activities. The plan is generally consistent with the intent of draft landscape ordinance that is currently in process. According to the Zoning Ordinance, Subway, a fast food restaurant requires a Conditional Use permit within the B-1 Zoning District. The proposed Subway will contain 1600 sq.ft, with the seating area oriented towards the front, counter area, kitchen located in rear. The building design maintains some of the residential character from the neighborhood using gabled roofs, using brick of the same height and color as the adjacent bank. Signage will be placed on two sides of the building, one facing Hwy 13. Access was a major concern due to intersection congestion, stacking and so forth. The driveway entrance was moved back as far as possible from the intersection. One alternative reviewed was to locate a driveway near Anna Trail, but the distance to Hwy. 13 was not sufficient to allow for safe stacking, safe movement in proximity to the lighted intersection. The applicant acknowledges that there is concern about having a driveway access opposite from single family homes so the drive was cenntered in the lot lines. It would line up directly across two driveway accesses. It would minimize the impact to the greatest extent possible rather than having the driveway access opposite someones living room window. Pylon sign to be erected along with signs on the building on the northwesterly side and southerly side adjacent to Hwy 13. Pylon sign will be of permitted height and size according to City standards. parking: The applicant requests a Variance for re9?ired parking spaces. The City Ordinance for this particular s1te in terms of square footage requires 40 parking stalls. History has shown with free standing subways that they do no require that many stalls. We have researched 14 other communities in terms of what they would require and found a range from 14 to 41, with the majority in the mid 20's. The applicant requests a variance to permit 27 parking stalls based on other Subways of this size and the number of seats, etc. The applicant also requests a building setback variance. The structure meets the front yard setback requirements of a B1 District being 30 feet from street ri~ht-of-way. However, the Ordinance does dictate a 50' setback loS required from Hwy 13. We request approximately a 15' variance at that point. The requirement off Duluth is 85' from center line and we are at 74' - 85 according to the plans so we are looking for an 11' variance for just a corner of the buildin~. We did look at various options trying to locate the bUl.lding in other spots but found with trying to keep access back away, parking really needed to be where it is to keep it away from the residential area as well. Discussion followed. Mr. Brad Busse introduced himself and his wife as the new owners and manager of the Subway and they also are the franchise owners and o~erators of the Subway in Bloomington. They plan to work at thlos store making sure that the standards are kept up which is one of the conditions upon continuing the franchise with the Subway. Along with the involvement on a daily basis we also pledge to become involved with the community, i.e. sponsoring school programs, commendations for students, sponsor Boy Scout Troop activities, etc. Horst Graser, Director of Planning presented staff reports. This is a three-fold project. Hearings for each of the different requests were convened contemporaneously in order discuss them in interrelating issues that are involved with the Subdivision, Conditional Use and the Variance. Mr. Graser presented slides of subject subdivision, elaborated on the zoning, conditional use and the variances that are asked for. There are three options that the Planning Commission has as outlined on page 3 and 4 of the memorandum: 1. Deny the Plat based upon specific findings, 2. continue the hearing for specific purpose or for lack of information or to do an alternative ~lan, 3. Find the preliminary plat of Busse's 1st Addn is conSlostant with our Comprehensive Plan in compliance with the Subdivision Code. The Planning commission may attached conditions as deemed appropriate. staff recommendeds #4, that the Plan not be approved until all conditions are met. The Conditional Use Permit is part of the same package is being submitted under Section 7-5 of the Zoning Code and the Variance under 7-7-6. Specfic variance is approximately 15' from S.T.H. 13, 11' front yard setback from Duluth and a reduction in parking space requirements from 40 to 27 stalls. Mr. Kopischke was advised that when developing this lot, the project should be extremely sensitive to the residential area, and be respectful of the existing commercial uses, the bank and the Priordale Mall area. Duluth is designated as a Collector street. The year 2010 will carry between 7,000 and 9,000 vehicles per day and if Hwy 13 is not reconstructed to a freeway status, the traffic will even be greater. The plan in ~eneral conforms with the performance standards and approval crloteria that are listed in the Zoning Code. The expected daily trips is expected to be 440 A.D.T. having two peaks about noon and later in the evening. The access is from Duluth, City Engineer Anderson discussed an alternative driveway location located opposite Anna Trail. The stacking distance between Hwy 13 intersection and alternative site entrance would not be adequate and therefore the entrance as proposed is the better and safer one. This entrance would line up right in the center of the driveways of Lots 6 and 7 across from the entrance so that even if people were stopped for a considerable length of time, the headlights wouldn't be directly in someones front room. Mr. Kopischke stated that the heaviest berming would be along Duluth to hide the trash receptical and to hide noise eminating from the order board. The owner should consider a plan to clean up adjacent properties on a structured basis. It is also important that maintenance of the grounds and structure be ongoing as it is vital to preserving the image of a 9Uality and respectful place that is used to buffer commerclal development and Hwy 13 from the residential area. staff has outlined three alternatives and those are to 1. deny the ap~lication, 2. continue the hearing for additional informatloon or direction at your choice, 3. find that the conditional use permit and variances are consistant with the Comprehensive Plan and within the spirit and intent of the Zoning Code and that approval is deemed appropriate. Audience Comments: Neil Boderman, General Partner and Owner of Priordale Mall if they estimate 440 trips per day, and 70% of business is conducted in a 3 hr span making approx 100 trips per hour then the number of ~arking stalls doesn't seem adequate. Also if hours are to be untl.l 2 a.m. it would probably become a hang-out for teenagers. Jim Netsfeld, Owner of NAPA - I think it would be a good addition to the community to have another selection to choose from for fast foods. In response to previous speaker, most of the traffic would be drive thru so would not need the parking. Emmy Schneider - resident - concerned with width of the street uses Hwy 13 and Duluth and feels that with the growth that the City is anticipatin~ that it will become a very busy intersection so her concern is Wloth the 15' variance from Hwy 13 and with the 11' variance from Duluth. If Duluth will eventually be redesigned with right turn lanes, we certainly need more than 30' there. Future traffic problems and when other lot gets developed it will again increase traffic - might Anna Trail cross over to make another exit or entrance to Hwy. 13. Jan Hansen - citizen Forum - suggests having a trash rece~tacle at the exit with an extended shoot so that they can throw lot in from the car window - Regarding parking stalls may look at the DQ as it is a comparable business. Bill Schoenecker - has been working with the Busse's, and on their behalf has talked to the neighbors across the street on Duluth. Of the people he has talked to, none of them are against the proposal. The only comment they made was they didn't want a gas station put there. W.B. Thomas (letter written to Deb Garross) See attached letter. In brief - does not object to Subway being built in Parcel 1 but does object to entry and exit off Duluth Ave. Would rather see these off Hwy. 13. - Thinks additional noise and traffic would decrease property values. Deb Garross submitted comments by Howard Clausen, Owner of Dairy Queen who could not attend tonights meeting. He objected to the Subdivision and the Conditional Use Permit. Basis of these objections he felt that traffic would be a concern of his based on the intersection and the amount of traffic that would be generated from the Subway use, concerned about the lights and compatibility issues that have been discussed this evening between the business and residential district. He also felt that other land is available in the community for such a use and that he didn't feel that special consideration be given to this particular business at this particular location. Bradley Busse - regarding Mr. Grasers comment of the 440 cars per day - our estimate shows we will have 200 customers per day, and 2 or 3 person carloads would greatly reduce that carload - We are anticipating an average of 200 customers per day with anywhere from 150 to 200 cars per day coming through the area. Based on Subway records, 30% of sales are from the drive-thru or about 60 per day drive-thru. Greg Kopischke - when one looks at traffic count one looks at a trip being in and a trip being out - or 200 transactions per day equals 400 trips. They also took into account the employees coming and going and delivery vehicles coming and going on a regular basis. The parking stalls closer to Duluth might be designated as employee parking as they would be the furthest from the door and that would lessen the activity of those stalls that seem to be of a concern especially during peak times then the employees are going to be tied up anyway. Regarding the trash concern: the Busse's plan to be here and have every intent of being a good neighbor and will be policing the site to make sure that everything is in order. Bob Schaffer - resident - The building is just going to be a first rate structure and if this building wouldn't be a~pro~riate there what might you hope to accomplish on that corner ~n lloeu of this. I encourage you to support this and allow them to build. Martha Hoover resident and realtor - personally spoke to 16 of the 30 agents in the office they personnally support this improvement to the community - With concern that this become a hang-out for the kids, it would become job ~otential for them. We encourage the Commissioners the support thlos development to our communloty. Public Hearing was closed by Commissioner Roseth at 8:40 p.m. and then asked the other Commission members for their comments. Commissioner Wuellner: Asked Mr. Busse if Subway had guidelines, suggestions, or regulations to a minimum or recommended numbers of parking spaces who responded that they don't have specific numbers all they can draw on Ultimately is when different stores are operational and are doing just fine. He has surveyed four stores that have drive-thru free standing facilities such as we are proposing anywhere from 20 to 26 stalls. Commissioner Wuellner also asked Mr. Busse's intent of hours of operation, and has there been research done by Subway or you as a Subway operator, are you able to project by the hour what the incremental bookings are between 10-11 p.m., 11-12 a.m., 12-1 a.m. Mr. Busse responded that Corporate Subway has required hours on national basis of Mon-Thurs from 10 a.m. to 2 a.m. but then allow graces on these days from 10 a.m. to midnight. Then on Fri. and Sat. the national hours are until 2 a.m. and except for a few cities in the metro area the majority of the Subway establishments are open until 2 a.m. and those are determined by City Ordinance. He talked to the developmental concerning the hours and they said there was a couple of pockets in the Minneapolis area where these communities ordinances read stores are open until 11 p.m. on weekdays and 1 a.m. on weekends. It is Mr. Busses intent to work the the city for the good of both the community and the propsed business. Questioned if a traffic study had been done for the number of vehicles exiting from the Bank? Mr. Graser did not have an answer but estimated 400 to 600 trips per day which would be similar. Mr. Wuellner was trying to make a comparison on an already existing condition on the same street affecting the same people on that street. Commissioner asked Mr. Kopischke regarding the screening that is going to put along the drive up order entry area and the trash bin area, initially when it is planted how high is the screening going to be and what will the optimum height be? Response was scrubs initially at 2' to grow to 5'. Evergreens also to be used would go in at 6' to 8' and grow to approximately 15' or so in 10 years. Commissioner Roseth recognized that the 8:45 p.m. Public Hearing on Shoreland Management Ordinance is due to start and asked what the parlimentary procedure was for this. Horst Graser advised if there were a lot of people waiting for that hearing perhaps it should be convened, otherwise he felt it would be appropriate to convene it and then continue it until 9:15 p.m. Commissioner Roseth called the Public Hearing for the Shoreland Mana~ement Ordinance at 8:45 p.m. to order and then continued the hearlong until 9:15 p.m. Commissioner Greenfield interjected regarding traffic felt that the noise coming from Hwy. 13 was going to some of the concerns coming from the order board. Commissioner Wuellner to City Engineer Anderson asking what is the projected setback from Hwy. 13 and Duluth Ave as we now enVloSloon them now to be developed in the next few years, i.e. what is this intersection going to look like, what will Hwy 13 look like, what will Duluth Ave. look like, where is the building going to fit in all of that. noise, he over power Mr. Anderson states the City is goin~ through a Comp~ehensive Plan update and he has been in contact Wloth firm that 1S doing the transportation plan for the City as late as yesterdar, to discuss traffic on Duluth Ave. They have some prelimlonary numbers for projected ADT on Duluth Ave. Those numbers are not final. Preliminary of about 7,000 cars per day on Duluth Ave. with that kind of traffic there would be for sure a right turn lane coming off Duluth Ave onto Hwy. 13, a straight-ahead through lane. That lane mar also serve as a left turn lane onto Hwy 13. with the possibilloty with a separate left hand turn lane depending on the actual design and the traffic that we have then there would be one north bound lane. The right-of-way that we have requested would serve to provide the right-of-way necessary for those improvements. The ri~ht-of-way does get wider at the intersection to provide for additloonal movements. We see that roadway as being either 32' wide or 36' wide depending on actual design with a sidewalk and bikeway on each side of the roadway. That system for pedestrian and bikeways, I believe is very essential to provide for the downtown connection from CR 21 to the shopping center. There was a suggestion by the Parks Director that we consider the sidewalk. I believe at this time it would be premature to put the sidewalk in. That section of roadway will have to be reconstructed from right-Of-way width across. We will convert that to an Urban section and then the sidewalks and bikeways will be constructed relative to the elevation and grades necessary to to roads. Hwy 13 is scheduled for 1995 improvements for safety improvements for channelization for which will be a two-lane roadway. Those improvements would be very similar to section of roadway that is in ~lace today. In this particular area it is two lane with channellozation. Those improvements would be from CR 44 to CR 42. In the long term plan the overall direction that the Comprehensive Transportation Plan is looking at is that Hwy. 13 would become a four lane facility, which would mean an additional lane onto Hwy 13 which would be another 12' of widening to the north with ~ossibly a right turn lane. It seems there is sufficient rloght-of-way that exists today to make those accomplishments both on Duluth and Hwy 13. Regarding to the proposed parking lot, there is one stall that I am concerned about and that is the stall on the northerly side of the driveway adjacent to Duluth. The sidewalk or bikeway will be right at the right-Of-way line. We have requested an additional 7' of right-Of-way for once we slide the right-of-way line out and put the sidewalk right there we would have a conflict with that particular car backing out there, so we suggest that the stall in question be eliminated. Commissioner Loftus asked Mr. Graser what the other conditional uses would be in a B-l District. Mr. Graser listed both permitted and conditional uses. The Comprehensive guide that you say this would be consistant with is a 1981 document, correct? Answer Yes. Is there any different treatment in the 2010 Draft of this area that you are aware of between the 1981 Plan and proposed new draft. The zoning is consistant with the Comprehensive Plan and if the zoning is consistant then the uses therein by way of reasoning are also consistant. What we are trying to do in the new Plan is relate businesses more to neighborhoods. Our business community right now relates to highways and what we are trying to do is be more village like in nature so that as a community grows and highways and transportation systems fail, businesses don't fail along with it. commissioner Loftus continues stating that seems everyone is favorable regarding design and so forth that when you have a fast food restaurant on a critical corner that is so visible that from a planning aspect it strikes me that you have a solo use just sitting out there by itself. Finds it a sense of frustration that all of these fast food can't be linked together instead of havin9 to get in your car and drive to all these different locatloons instead of being able to strole down the sidewalk to choose from different tastes. Asked about the possibility about Subway delivering which would raise traffic count. Answer does not deliever as a rule except for party subs, if company has a large meeting etc. Does not forsee this as becoming a feature for their business. Commissioner Arnold, because he came late he did not hear if some of his questions were answered. Asked if the proposed driveway was the safest and thought the Anna Trail alignment would be better. Mr. Graser answered his question based on previous testimony. Also asked about trash being found in adjacent yards and asked if we have had complaints from the other fast food locations in the area. Answer few complaints from Burger King area but thinks that since none of the facilities have outside seating that it is at a minimum. Commissioner Greenfield is pleased with the cooperation that took place.during the initial stages of this proposal between staff and loS very pleased with who the building is put together and looks like it would be a welcomed place in the community. I still would like to voice a concern about the trash that we should express on behalf of the residents in the neighborhood that we may have to look into the possibility of wrappers being blown across the street. Also expressed his feelings regarding the possibilities of using more footage of Lot 2 and turn the proposed building 180 degrees would make the order board more towards Hwy 13 henceforth less of a noise problem. These are his opinions. Also was wondering about taking more than 7' for right-of-way. Mr. Anderson and Mr. Graser answered the issue. Also wondered if enough thought was given to placin~ the building on the lot, or if other lots were considered whloch mi~ht negate the need for a variance, or have the concern with traffloc flow, etc. Answer was yes but felt they have designed a nice building to compliment the area. Also questioned the hours again that because of the residential nature of the area that a condition of operational hours mi~ht be attached subject to approval of this Condition Use Applicatloon. commissioner Roseth asked Mr. Busse how much of his product is throwaway both in food stuffs and packaging. Majority of the customers are dine in and receptacles are in the stores where 70% of the garbage ~oes. On the carry out business most go through the drive thru, plock up the sandwich and drive home to eat it. The Corporate office im~resses on all franchise holders that cleanliness is the best thlong that you can have when you are dealing with a restaurant. There is 4 or 5 times scheduled during the day that the store is cleaned inside and out, trash is picked up. Mr. Roseths concern was how much refuse was degradeable and would hate to be at the order board next to the trash bin on a 99 degree day. Thinks the dumpster is in the wrong spot. Deliveries to the restaurant would take about 10 minutes once per week and there would is adequate s~ace to maneuver the delivery truck around. Was the state notlofied of this proposed development? Yes they were notified and we received a letter from MnDot stating no objections to either of the applications. They would not allow any direct land access for either of the lots, nor would they allow any regrading, planting or any type of landscaping in their right-of-way. Greg Kopiscke elaborated again on parking lot design, trash bin location so that the hauler can get in and out, and people know what they want to eat so clustering probably would not have much effect. Tom Loftus - clustering was thought of if there was a line at one you might change your mind and go to another facility cause the option is there. Regarding the hours you are allowed by corporate to shorten the hours, I am thinking of the employees and safety reasons. Mr. Busse stated that the closer will be an adult and cameras and alarms are to be installed. Allen Greenfield - your original proposal of September and water hookup had those on the bank side of the road your December proposal has them on the residential side. the decision made in light of citizen and street empact? for sewer and now Why was MOTION BY LOFTUS, SECOND BY WUELLNER TO APPROVE BUSSES FIRST ADDITION PLAT SUBJECT TO ALTERNATIVES LISTED IN STAFF RECOMMENDATION AS (1) AN EROSION CONTROL PLAN SUBJECT TO THE APPROVAL OF THE CITY ENGINEER; (2) THE RIGHT OF WAY FOR DULUTH BE INCREASED BY 7 FEET FOR THE EASTERLY 152 FEET OF DULUTH AVENUE; (3) SEWER AND WATER PLANS MUST BE SUBJECT TO THE APPROVAL OF THE. CITY ENGINEER; (4) THE DIMENSIONS FOR LOT 1 BE ADJUSTED TO A MINIMUM LOT SIZE OF 20,000 SQUARE FEET. Discussion followed: Commissioner Greenfield would be in favor of continuing an issue of this complexity with the number of motions and stipulations etc. and get the issues more distinctly expressed in paperwork and proposals before us. Commissioner Arnold - should we see the design of the shifting of parking spaces before approval? Greg Kopischke could make it a condition of the approval but we can work with Mr. Anderson of this parking stall in question. Vote taken signified ayes by Loftus, Arnold, Wuellner, Roseth. Nayes by Greenfield. MOTION CARRIED. MOTION BY LOFTUS, SECOND BY ARNOLD TO CLOSE THE SUBDIVISION PUBLIC HEARING. Vote taken signified ayes by Arnold, Loftus, Wuellner, Greenfield, Roseth. MOTION CARRIED. MOTION BY LOFTUS, SECOND BY WUELLNER TO GRANT THE SUBWAY CONDITIONAL USE AND VARIANCE IN PARCEL 1 TO INCLUDE A 15.05 FOOT SETBACK VARIANCE TO HWY. 13 AND 11 FOOT SETBACK FROM DULUTH AVENUE AND ALSO THE CONDITIONAL USE INCLUDE A VARIANCE OF PARKING SPACES BE REDUCED FROM 40 SPACES TO 27 SPACES, AND CONDITIONAL UPON WEEKDAY HOURS CLOSING AT MIDNIGHT AND FRIDAY AND SATURDAY HOURS CLOSING AT 1:00 A.M. Justification: Commission Loftus for a Condition Use it is consistant with the Comprehensive Plan because it is a Conditional Use listed in the B-1 Zoning District. The people that testified during the Public portion of the hearing were proponents of the applicant with only a few qualifiers but applicant has stated they are responsible operators and intend to exceed expectations so will not be detrimental to the general welfare and health and safety of the community. Commissioner Greenfield again is uncomfortable with railroading this through without more time to look it over and discuss it more thoroughly and feels that 1:00 a.m. is more than generous with the residents. Vote taken signified ayes by Lotfus, Wuellner, Roseth, Arnold. Nayes by Greenfield. MOTION CARRIED. MOTION BY ARNOLD, SECOND BY LOFTUS TO CLOSE THE PUBLIC HEARING ON THE CONDITIONAL USE AND VARIANCE APPLICATION Vote taken signified ayes by Loftus, Wuellner, Greenfield, Arnold and Roseth. MOTION CARRIED. Public Hearing closed at 10:00 p.m. Commissioner Loftus asked for a 5 minute recess. ITEM II - I N T E R 0 F F ICE MEMORANDUM TO: FROM: SUBJECT: DATE: oj HORST GRASER, CITY PLANNER v.p,BRUCE LONEY, ASSISTANT CITY ENGINEER I BUSSE FIRST ADDITION PRELIMINARY PLAT REVIEW JANUARY 21, 1993 The following comments are from the Public Works review of the above referenced plat: Preliminary Gradinq Plan 1. Grading of site should be revised so that the drainage of site is towards Trunk Highway 13. Revising the grades will eliminate the need of a storm sewer pipe on a future Duluth Avenue improvement project. 2. An erosion control plan needs to be done for the site development. 3. The right-of-way width for Duluth Avenue adjacent to the proposed plat should be eighty (80) feet. Sanitary Sewer & Watermain 4. Sewerrnain and watermain lines should have a ten (10) foot separation. On the west side of Duluth Avenue, a portion of the pavement section will need to be removed, and details of the pavement removal and restoration need to be submitted. 5. The existing topography and in particular, the trees along Duluth Avenue are not shown. Trees to be disturbed or removed should be specified on the plans. site Plan 6. The parking stall nearest Duluth Avenue should be eliminated to provide a safe sight distance for future street and sidewalk traffic. 4629 Dakota 51. 5.E., Prior Lake, Minnesota 55372 / Ph. (612) 447-4230 / Fax (612) 447.4245 AN EQUAL OPPORTUNITY EMPLOYER M E M 0 RAN DUM TO: FROM: RE: DATE: HORST GRASER, DIRECTOR OF PLANNING BILL MANGAN, DIRECTOR OF PARKS AND RECREATION PARK DEDICATION REQUIREMENT FOR BUSSE FIRST ADDITION DECEMBER 23, 1992 Since this is a commercial application, the park dedication requirement will be treated just as all of the business applications have been treated. The most recent application involved Radermacher's County Market. However, that application was substantially larger than this one. The most recent application similar to this subdivision is the existing Burger King restaurant. For these commercial application, a raw land value is assigned per square foot rather than per acre. The raw land value for this subdivision will be $1.00 per square foot. As a result of this determination, the parcel has a raw land value of $58,300. The 10% park dedication requirement is applied to this figure to result in a park dedication requirement of $5,830. Horst, there is one other consideration to keep in mind with this subdivision. Duluth Avenue is a collector street within the city. Eventually, there will be sidewalk and bikeway on both sides of the street. There is currently a bikeway striped on the west side of Duluth Avenue. I would suggest to the developer that, at minimum, a 5' concrete sidewalk be considered at the time of construction. This sidewalk is identified in our city trail system plan and should receive consideration for this application. If there are any comments or questions related to this subdivision, I will be available to answer them. 4629 Dakota 51. 5.E., Prior Lake, Minnesota 55372 I Ph. (612) 4474230 I Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER TO: FROM: RE: DATE: MEMORANDUM Planning Department 1i / Ralph Teschner, Finance Director~ Busse 1st Addition Preliminary Plat November 4, 1992 The 1.33 acre parcel (PIN #25 902 049 0) does not have water and sewer service available to the property. The closest proximity to such utilities would be within the street intersection of Duluth Avenue and Anna Trail. These improvements were originally installed in 1959. The applicant, Davann( Inc. would be responsible for the extension of the service llones for purpose of connection to the City's municipal system. since utilities do not abut the property and the developer would incur the service cost, the parcel would not be assessed front footage. The subdivision would however be subject to the charges outlined below: Trunk Water & Sewer Charge Stormwater Management Fee Collector Street Fee $27S0.00jacre 20.3 centsjsq. ft. $700.00jacre The a~plication of these City charges would generate the followlong costs to the developer based upon a net area of 58,302 square feet as provided within the site data of the preliminary plat description: 1.34 acres @ 700.00jacre 1.34 acres @ 2750.00jacre 58,302 sq. ft @ 20.3 cents Total City fees $ 938.00 (collector) $ 3,685.00 (trunk) $11,835.31 (stormwater) $16,458.31 There are no other outstanding special assessments currently certified against the property nor any ~ending deferments. The above represented charges for the prelimlonary plat of Busse First Addition would be collected upon entering into a developer's agreement for the utility improvements. 4629 Dakota 51. 5.E., Prior Lake, Minnesota 55372 I Ph. (612) 4474230 I Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER iLIl " OF ,,-,# Minnesota Department of Transportation Metropolitan Division Transportation Building St. Paul, Minnesota 55155 Oakdale Office, 3485 Hadley Avenue North, Oakdale, Minnesota 55128 Golden Valley Office, 2055 North Lilac Drive, Golden Valley, Minnesota 55422 Reply to Telephone No. 593-8533 December 15, 1992 Mr. Horst Graser Director of Planning City of Prior Lake 4629 Dakota St. S.B. Prior Lake, MN 55372 In Reply refer to: TH 13 C.S. 7001 Busse First Addition Duluth AvejTH 13 Prior Lake Dear Mr. Graser: We are in receipt of the above referenced plat for our review in accordance with Minnesota Statutes 505.02 and 505.03 Plats and Surveys. We find this plat acceptable for development with consideration of the following comment: · Work within MnjDOT Right-of-Way along TH 13 will not be allowed. Please contact Bill Warden in our Permits Section at 593-8449 with any questions about this issue. H you have any other questions please feel free to call me at 593-8533. Sincerely, , -IJJA~ . C{ ,S~.~ William A Sirois Senior Transportation Planner cc: Dotty Rietow, Metropolitan Council Brad Larson, Scott Co. Engineer William Schmokel, Scott Co. Surveyor All Equal Opportullity Employer APH.IC'ATION FOR 'mE SlJBDMSION (R LAM) WI'niIN 'mE CITY OF PRIOR LAKE 9J PID ~~~r~,~ .~~~'~1::~ IUXhYider'-2"~_-,~~_~;: : Address: . Agent: Poone: Address: :: ~ ~~~: ~~uL~~':P'7 Phone: Poone: ~L/7- 2!.s-:?O - Legal Description of Property: E. A/. K~A/B-J -r;e%.;;!'- ~~~i!JP Present Zoning: ;:?' -I Deed lEstrictions: No4 Yes Property Acreage: ~Oa:JO .5/ (, SAC) If so, please attach. Has the Applicant previously sought to plat, rezone, obtain a variance or oonditional use permit on the subject site or any part of it: tb ~. Yes What was requested: When: I have read the Prior Lake Slbdivision Ordinance and agree to provide the infoDnaticn and do the work in accoreance with the provisions of the ordinance. '$(Jd/~ ~ Oct /1, /99:J. Appllcants 5i ure Date " ~ "i; U-T r l . , 1 ,,--{'.., Q f't A rr) "'"' A I \ l\AI ~-CD" "\ Co ~ ~ I q q? . Pee CMlers 51~ature _ Date ( /Z.te:"-~ q~/lt..J-1 "'''''11:-- .?<J.I ~Jf i.-l, 1'0/; ~~ ~~../t:/r~ J;:::.rF 46-ur '1H ION '10 BE FILLED IN BY THE PI..ANNIN; DIRECroR PI..ANNIN; <D1MISSION _APPRCmD CITY <DUlCIL _APPROJID CDNDITION5: DENIID DENIm Ot\TE OF HEARn{; Dr\TE OF HFARIR; Signature of the Planning Director Date -'zoo~ December 10, 1992 BUSSE FIRST ADDITION Prior Lake, Minnesota REOUEST Submission is presented to the City of Prior Lake requesting review and approval of a preliminary Plat and Final Plat for a two-lot commercial subdivision proposed as Busse First Addition. SITE DESCRIPTION The 1.33~ acre site is located at the northeasterly corner of Highway 13 and Duluth Avenue. Adjacent land uses include Prior Lake State Bank and other commercial to the east, single-family residential northerly across Duluth Avenue and commercial south across Highway 13. The site is primarily a vacant, open, grassed area. A portion of the easterly side of the site was leased by Prior Lake State Bank, which has constructed a small parking area. Even though the Bank site is sufficiently parked per code, this parking area was added to in order to provide close and convenient access to the main building entry for customers. The site is generally flat, with a 2-4 foot elevation change. Site stormwater runoff currently flows into the ditches along Duluth Avenue and Highway 13, eventually flowing northeast along Highway 13. Zoning is B-1 Limited Business. PROPOSAL The 1.33~ acre site is proposed to be subdivided into two (2) lots of 20,098 sq. ft. and 38,204 sq. ft. Zoning is intended to remain B-1 Limited Business. Both lots meet or exceed the zoning code standards for minimum lot area (20,000 sq. ft.) and width (120 feet). The westerly Lot 1 (20,098 sq. ft.) is proposed to develop with a 1,600 square foot, free-standing Subway Restaurant with a drive-through lane. Access will be to Duluth Avenue. This use is projected to generate 200 transactions per day. Including a 10% trip increase for employees and deliveries, the site would generate approximately 440 trips per day. The P.M. peak is about 5.6% of the total for about 25 trips. The noon hour is the actual peak use period, generating about 78 trips during an off-peak time for background traffic. Refer to the submission narrative for a more detailed description of the site plan proposed for this lot. The easterly Lot 2 (38,204 sq. ft.) is not proposed to be developed at this time. No specific buyer or use has been identified for the site. The use would fall within the B-1 zoning. The site has two options for access, the first being a separate access to Duluth Avenue. The second would require an agreement with Prior Lake State Bank for joint use of an existing access to Duluth Avenue that is directly adjacent to the lot boundary. The existing parking on Lot 2 would be used for any future site use, though an option exists for joint use of parking between this lot and the bank. The final determination regarding access and parking will need to be made when a specific site development proposal comes forth. To determine potential traffic generation, two theoretical site development scenarios were prepared (using ITE standards for trip generation): 1. Office Assumed 25% site coverage creating a 9,550 sq. ft. building and 39 parking stalls. This will generate about 117 trips per day, with about 22 during the P.M. peak hour. 2. General Retail Shopping Assumed 20% site coverage creating a 7,640 sq. ft. building and 39 parking stalls. This will generate about 886 trips per day, with about 115 trips during the P.M. peak hour. SCREENING Lot 1 shows screening to the adjacent uses, especially the single-family across Duluth Avenue, on the proposed site plans. Screening is intended to meet the standards of the proposed draft landscape ordinance. Lot 2 is proposed to meet the following performance criteria for screening along Duluth Avenue across from the existing single-family. Parking lot screening shall be provided on the perimeter of any new parking lot. a) Screening shall be provided using a combination of shrubs, coniferous trees, fencing, berming, etc., to minimize the effect of headlights and reflected light from bumpers, grills and headlights. Screening must attempt to address at least 60% of the perimeter where views of the parking lot could originate. b) Effectiveness of the screening shall be 80% opacity year-round. c) Berming must achieve a 30" height to provide 80% opacity on 3' high screening. (Berms cannot be used as the only method of screening. They must be used in combination with other elements.) d) Plant materials must be spaced no more than 30" apart on single rows of deciduous shrubs, 48" apart on double staggered rows of deciduous shrubs, with initial planted height of at least 2' (spacing may vary, subject to species used). e) Coniferous trees must be placed no farther than 8' apart, to be counted as screening. UTILITIES/DRAINAGE The site currently is not served by sanitary sewer and municipal water. A preliminary plan is submitted with this subdivision proposal which shows the extension of services. Sanitary sewer would extend generally southerly from Anna Trail along the west side of Duluth Avenue and cross under Duluth approximately between the two proposed lots. An 8" water main would extend southerly along and cross Duluth Avenue near the sanitary sewer. A hydrant is provided for fire protection. Storm water will continue to flow into the existing ditches along Duluth Avenue and Highway 13. Lot 1 (Subway) is proposed to be graded for building and parking lot construction. Lot 2 will not be graded at this time, nor until a formal development proposal comes forth. The existing drainage patterns will continue. All runoff will be handled consistent with City and Watershed requirements. I gL I , I 1 I I I, : I . I i \J .. ; \ ' .~" ,'- '-.. '" i '''~,:-- . J' ','. , " ... ... ~ ------- I ~\.....::,~""" '--~-- i:\ / -, ~ ~ ... -, . '\ ~ / \ '\..... ~ - - . ~ ;" x:..__ _~ ....... - , 0' ,-, -.. , ~... . <>. ;' , r I t1 II "' !I -- " ;' ; . ;' \ .; ,. ,/ ;' ... ..; ;' .; ;' ..; ;' .; ,/ " ;' 5 ... N\. ..; ..; ./ .; .; ~ ~ . \ ~ \~ \ \ \ \ , \ \ , \ \ \ \ \ -So ''; \~ , \ \ \ , \ , , , \ , , .. , .. \ '\ , "- , "- " , " ... ... .... ... ... " ...... \ \ - .).- ~\ -- \ ,. I I I I -I ~ I I I I I I I I . J \, I I , . ,- I I I I I I . J \, I I I I I I f I I I it I I I I I I I I kI I- ;! (I) l!l g ~ :x: ~ z ::> It I- I~ , ~ I '\i ~ \. I --- BUSSE FIRST EDITION J )- 1 J 1 1 J J l ] .1 ] ] J I ] J .J J BUSSE FIRST ADDITION PRIOR LAKE, KIHHlSOTA A COKKERCIAL DEVELOPEKEHT j , 1 J ] J j J I J J .J J FEE OWNER/PLATTER E.N. BARSNESS TRUST A & B C/O Mr. Robert Barsness 16677 Duluth Avenue S.E. Prior Lake, Mn. 55372 Ph. 612-447-2101 PURCHASER/DEVELOPER DAVANN, INC. BRAD BUSSE & MARY BUSSE 1420 Mallard Court Chanhassen, Mn. 55317 Ph. 612-448-5710 DISIGN CONSULTANT: VALLEY SURVEYING CO., P.A. 16670 FRANKLIN TRAIL SE SUITE 120-C PRIOR LAKE, MINNESOTA 55372 Ph. 612-447-2570 Ronald A. Swanson, R.L.S. ENGINEER VALLEY ENGINEERING CO., INC. 7301 OHMS LANE SUITE 500 MINNEAPOLIS, MINNESOTA 55439 STEVEN D. HAnVEY P.E. Ph. 612-832-9475 I t 1 I J . ) I .1 ] ] J ] ] J J J J J J BUSSE FIRST ADDITION PAGE 1 TABLE OF CONTENTS NARRATIVE Property Location PAGE 2 Property Legal Description 2 Zoning 3 Existing Site Conditions 3 Storm Water Runoff 4 Steep Slopes and Erosion Control Measures 4 Vehicular Access 4 Request for Subdivision 5 EXHIBITS Preliminary Plat 6 Utility plan 1 Final plat 8 I r I I 1 ) J J ] ] J ] ] J ,I ] J J J BUSSE FIRST ADDITION Page 2 PROPERTY LOCATION: The property is bounded on the west and northwest by Duluth Avenue, on the south and west by State Highway No. 13 and on the northeast by the existing Prior Lake State Bank. PROPERTY D~OH of RF.X:ORD: That part of the West Half of the Southeast Quarter of Seotion 2, Township 114, Range 22, Scott County, Minnesota and that part of the East Half of the Southwest Quarter of said Seotion 2, lying northerly and easterly of the northwesterly right-of-way line of State Trunk Highway No. 13, southeasterly of the southeasterly right-of-way line of Old Trunk Highway No. 13 (Duluth Avenue) and southwesterly of the following desoribed line: Commenoing at a point on the east line of said West Half of the Southeast Quarter distant 1940.80 feet north of the southeast oorner of said West Half of the Southeast Quarter, said point being on the south line of a Town Road; thenoe defleoting to the west at an angle of 92 degrees 32 minutes 00 seoonds along said south line of a Town Road a distanoe of 652.15 feet more or less to the interseotion with the northwesterly right-of-way line of said State Trunk Highway No. 13; thenoe oontinuing on an assumed bearing of South 87 degrees 39 minutes 52 seconds West along said south line of a Town Road a distanoe of 759.70 feet to its interseotion with said southeasterly right-of-way line of said Old Trunk Highway No. 13 (Duluth Avenue); thenoe southwesterly along said southeasterly right-of-way line along a nontangential ourve oonoave to the northwest having a radius of 1185.41 feet a ohord bearing of South 22 degrees 39 minutes 47 seoonds West an aro length of 231.50 feet to the point of beginning of the line to be described; thence South 60 degrees 00 minutes 00 seconds East a distance of 310 feet more or less to said northwesterly right-of-way line and there terminating. ,. J J 1 "I J J J ] I . J J J i . . J 1 J J BUSSE FIRST ADDITION PAGE 3 ZOHING CLASSIFICATION: The property is presently zoned B-1 Limited Business and the requested use for this project is also B-1 Limited Business. EXISTDfG SITE CONDITIONS: The site is a generally flat open grassed area with the exception of a portion of the proposed lot 2 which is presently leased to the existing bank for overflow parking. as shown on the prelimina.ry plat drawing this area is presently paved. The existing site surface drainage flows southerly. westerly and easterly from the center to Highway 13 and Duluth Avenue with the exception of the previously mentioned parking area which flows southeasterly onto the bank site thence into the existing Highway 13 ditch. All of the existing drainage for the site eventually flows into the Highway 13 ditch. The area west and northwesterly of Duluth Avenue is an older established single family developement which was developed around the time of the relocation of Highway 13. To the northeast of the site is the existing Bank site and the Post Office. to the southeast across Highway 13 is the Hollywood Restaurant. to the south is the shopping center and to the southwest is the Holiday Gas Station. The intersection of Duluth Avenue and Highway 13 is presently signalized. Anna Trail intersects the southeasterly side of Duluth Avenue about 250 feet north easterly of the site. Public sanitary sewer, water service is available at the intersection of Duluth Avenue and Anna Trail and will be extended as a part of this proposal. electrical and gas services are available to the site at this time via the existing bank site. , .1 1 ] J J ] ] I ] ] I J ] J J J I. BUSSE FIRST ADDITION PAGE 4 STORK WATER RUNOFF: As previously stated predevelopment stormwater runoff flows southerly along Duluth Avenue and overland into the existing Highway 13 ditch. The runoff from the Highway 13 ditch flows northeasterly into a wetland on the northerly side of the C.H. Carpenter Lumber yard and southwesterly into a creek that eventually flows into Prior Lake. Preliminary review of the si te indicates that on site ponding of surface water runoff may not be necessary for the requested improvements. All storm sewer easements needed for the site will be provided via the final plat after the final plans are approved by staff. STEEP SLO~ AND EROSION CONTROL MEASURFs: There are no steep slopes or existing soil erosion problems on the site. As required by city ordinance proper erosion control and runoff containment will be provided during all on site construction. Upon completion of the building construction and utility hookup all disturbed areas will be dressed off and covered with sod. mrrcULAR ACCESS The access to the site from Highway 13, will be via Duluth Avenue and Anna Trail. The accompanying request for a Conditional Use Permit on lot 1, of the proposed plat prepared by others will show a more detailed proposal for access to Duluth Avenue j 1- 1 I 1 I I I ~ I .1 I :J J J J J j J 1 BUSSE FIRST ADDITION PAGE 5 REQU&ST FOR SUBDIVISION The request as presented. is for, prelimina.ry and final plat approval to subdivide the existing 1.32 acre B-1 parcel into two B-1 zoned lots. Accompanying this request is a proposal by others for a Conditional Use Permit for a fast food restaurant within a B-1 (Limited Business) zoning district. Along with the permit will be a 'request for a setback variance from Highway 13, for lot 1. At this time it is not anticipated that a sale will be made on the area proposed as lot 2. It is not anticipated that the use of this lot will be changed in the near future. We would expect to ask for approval and provide a site grading and landscape plan at that time. If this is not acceptable perhaps lot 2, could be changed to an Outlot for the final plat. It is my understanding that if the Conditional use permit is denied we would not pursue the final plat at this time. lA.:z 00 J: ....- :38 a..<t >-.... ~~ zG: ~IAJ G)CI) f~ \ \ t \ \ . , I I I \ l~ .'; \ & '. \ I \ \ \ \ \ \ \ \ t1IU 11'~11'~'f" ')'" ).tl, ,if IJI i I'J I :jJj!J11'P !If,l mjl.~~Uii: J'~II "fJ !h f6,1 ,ill JJJ'fl,'fiB, II : III! II! '11 " f II Ie HII'l li't: 'Uu:;hllll , I !. III! f II' I ,~I ! !Iil II~' ~ . JJf I "I"P IIII I ! .:1 !' ,I"~IIJ 'il '.w ,~,.~iJlllll1 I :Jhi hH~f!hlmf IIIIJ IIIII ,.. H II II II I, i 1 I: Inll .1111111 / \ \ \ ., \ \ \ \ \ , , , , , , , I ~ /~ . t.~! a.s fiil a n;:1 .. ill Ii .- I !w Iii! 'I)' - I, I I!~ ~' I.'! ! J'"' . ,.:1 !!I!I ~ . / ...---. --~-- .'..l ...,......... ,....'...~ -- ....- .' .. ...... ... -~~ ;:\ -.--- .. - I .. ~ .--- -- .~":"- N''n'lIlI.lYM , IIIMII AlIY.lINn " r '--- ~.~.::~ff~~~ I ~ . - ':lU' "OJ ~::':~:;;A'''D^ ' 1... _. 1flIt)oo. NOUIOOY J.'III~ ...ns 3 j ....... . ~ ..........., (JO. ........ I " \ t~ \ , (\,L-~~ j-~i~f;:' ~ ~.-_..-.~.:~ jI \ r ~ ' ,...-/1 \ f ! ~ _I iJ: r JII' W ! " . :. : I . ~, i & __,I Ii : i~_._. .- 'w I " -. . l I. J..:.... '" ~ . II!, Ie ? .~. ! '"j /'--- ,1 !.~/t ~- i' I t~t, :Jj ~: ~Ie~!lh , I' '/ I' -4--- . iiI / ',Iii!, . dll -.. 'fl., II' Ii I I =.. \ II \ \.e \~! " . . . \ \ \. \ \ \! I \, \\ ,I. \ ,,--::,,~--"".,. ',~.' ./'. \ v .;. ..j-'" / ./ , . 4' I L!! ~ ! I .. ~ -J uJ en ~ :J: !; ...4 ~ C 00 ~l I~J ~jjJlif.J' J~ Jil IJJII,JJ,-I .) .It .;11JJ,1I Jl JI~ _JJJIJJJ.' If !ilj i!:f~~f~liil I. J!~I -'~!I !lj II t~~lf 1'111'111- :1 II i J:8,a11~il~ !I i~:ll ;J!j~~!li~; JIj 111 1)1 JiJj!~ .~ II! I :"~-1-151 j. I I 1',' ~ 1 ~l '~!J ii:~:jl~l! ,I lJ!; .Jlll.~I:I. I J.'i II'tI1' J f II. JJJr {l'; JII 8 ; I" ,'JJ ;IJ!~.IIIJI I 11:/1. Jl,lll ~JI iil~ fliJ'IJ ~Sl 2:! HI; iJ;hl.hJ o - t- - 2J <(I I J ! I- U)j O::j G:l J J. lU ..:1 (f) III (f) 1)\ ::> ti' Q) : J 'i ;, I. )1 J. . " J ! .i i 1 J I' ji ~! I I I I. Ii .~ 11 I! .; ,! !i L :J :1 J : II I I .i J H HI " ! il ~ n' n 1'1 !I. ,," HI ) ) 'UI I · J~ i I". ,I ~) I Ii-I r 1 J' d! . !f!' i' ., I .!I ; I t I' J J,' I' J J I .J ~ j Ifll i I: . I, I I~ i I~ ! .1 - t II I t ~ ~I I I-I: IJ I 1;! i I ,1n IJ ! ., i II . II ili!l II : .~!:I i I: l!'li II ! !l I l al f:1f. al Ii I~ _I 1-) . 111 ~1 I) I!! I . !:!.i hi I: III I I' Iii I Ih ..hi ~.. II! !I :aJ I, 13 oct t'lt. ..... Q.; ",Ir . . ~tY; tI.l. ~\~..~~ 8 ~. v ~ / I ~" ~ m ~' i i ~, --- -----] IJPJ: 01' _- _ j r-".I 'OIS ___ ....--- ----- ------- / --- / / :-: / ~ ~ /<< I / '''J ;>''', llJ. -jfl U ~I / I ~ I .. .j 09"U:92 10:09 F.t! 612 ~~i ~2~3 eIn- PRIOR L\KE ,:,)~ ;::~ :aJ U!):! -- APPLICATION FOR CDNOITIOlW., USE PERilT .' CD q~ -()~ PIDt ~ )'- 9u.; -oJ'f-o Applicant: Davann, rnc. Bane Phone: 448-5710 Address: 1420 Mallard Lane: Chanhassen, MN 55317 WOrk Phone: A48-5710 Property ONner: Norman Barsness Estat~ l'rust - Acme Phone: AddtesS:~/o Pr~or kak~ ~tate Bank: b6~77 Du~uth A~ S.E. Wbrk Phone: 447-2101 Consultant:Westwood Prof. SP-TV_ r or La e, HN 5372 Phone: 937-5150 Address: 14180 W. 78th ~tr~et. Sp~te 220. Eden P\aiTip, MN 55344 Proposed Conditional Use Mdress: Duluth Avenue S. E. Legal Description: See attached descriPtion bv Valley Survevin2 Co.. P,A. Existinq Use of Property: Vacant Property Acreage: .20.098~~q. ft. Present Zoning: B-1 Conditional Oe8 Being Requested; For fast food restaurant within B-1 zoning as allowed ..... " . oer zonin2 ordinance. Deed Pest rictions: ---L-N:l Yes If so, please attach. Has the Applicant previously sought to plat, rezone, obtain a variance or conditional use pecnit on the subject site or any part of it: X to ~Yes Pequest: When: SJBMISSION RroUIREMENrS: (A) Completed application form. (B)Cornplete legal description and parcel identification nlm'Cer U?ID). (C)E'iling fee. (D)Oeed restrictions, if necessary. CEJFifteen copies of site plan drawn to scale showinq existing/proposed structures. (F)Additional infornation as requested by the Planning Director includinq but not: limited to: existing grades and buildings within 100 feet, drai.naqe plan with finished grade and relationship to existing water bodies, if a11Y, pr01=Osed floor plan with use indicated plus builc:Unq elevations, landscape plan with schedule of planti.ngs and screeninq, curb cuts, driveways, parking areas, walks and curbing. (G)Certified frcm abstract firm the names and address of property owners within 500 feet of the existing property lines of the subject ptoperty. CHlApplicaticn and supportive data are due 20 days pdo!: to any scheduled hearing. ONLY CDMPLETE APPLICATIONS $ALL BE REVIE:WED BY THE PLANNI~ a:MUSSION. To the best of ~ knowledge the info.rmation presented on this form is correct. addition, I have read Section 7.S of the Zoning Ordinance which specifies requiranents for condit:ional uses. I agree to provide Wormation and follow pr res as ou in in the Ordinance. In the the ~5~d/J /~~ Date " Fee Owners Signature Date THIS SE:CrION 'IO SE FILLED M BY THE PLANNI~ DI~R PLANNIm <D1MISSION _APPFOlFD CITY CDtnOL ~ <DNDlTIONS: DENIm OENIm D.\TE OF HF.ARDC Dt\TE rR HEARIm Siqnature of the Planning 01 recto: tate CONDITIONAL USE PERMIT This agreement is for 8rad & Mary Busse to apply for a conditional use permit to the City of Prior Lake. The conditional use permit is f6r the property located at Duluth Ave. and Hwy 13 E.N.BARSNESS TRUST- a~ (3~D'T"\A.O ~ RICHfiElD BANK & TRUST CO Richfield, Minnesota BY ~ I~<< Personal Trust 0 lcer ""\ 'v L.\..~ \- .. 0- Permission granted by 09/17/92 Proposal for ~ . . Prior Lake, Minnesota By Davann, Inc. September 21, 1992 SUBWAY Prior Lake, Minnesota REOUEST Submission is presented to the City of Prior Lake requesting review and approval of the following: 1. Site plan review for a 1600 % sq. ft. Subway restaurant on a 20,098 % sq. ft. site at the northeasterly corner of Hwy. 13 and Duluth Avenue S.E. 2. Conditional Use Permit (C.U.P.) for fast food restaurant within a B-1 (Limited Business) zoning district. 3. Variance from ordinance parking requirements (40 stalls) based on demonstrated need (27 stalls). SITE DESCRIPTION The site is currently a vacant, open grassed area. Topography is generally flat with a 2-3 foot elevation change over the site. Site surface water drainage currently flows from the center of the site (high point) into ditches along Duluth Avenue and Highway 13. Drainage flows south along Duluth Avenue then easterly along Highway 13. Existing adjacent land uses are single family residential northwesterly across Duluth Avenue, Prior Lake State Bank and other businesses to the northeast and commercial south across Highway 13. Duluth Avenue and Highway 13 is a signalized intersection. Anna Trail intersects the northwesterly side of Duluth Avenue about 150 feet north of Highway 13. The land subdivision is to be processed by the fee owner. PROPOSAL The site is proposed to develop as a 1600 sq. ft., 40 seat Subway restaurant with 27 parking stalls and a drive-thru window. Access will be from Duluth Avenue approximately 270 feet north of Highway 13 and 120 feet north of Anna Trail. The building will be located on the west side of the site with parking to the east away from Duluth Avenue and adjacent to an undeveloped commercial parcel. The architectu+e is a one-story structure approximately 32 ft. by 52 feet in size. The proposed gable roof will help transition the building to the adjacent existing residential neighborhood and provide an appropriate scale and appearance. The exterior will be primarily a brown brick, similar to that used on the adjacent bank. The trash enclosure will also use the same brick veneer (with a screen gate) to provide a compatible appearance. Signage will include a pylon sign at the corner of Duluth Ave. and Hwy. 13. Wall signs will be located on the south and west facades on the gable roof ends. A small drive thru sign and order board will direct customers to the pick-up window. All signs will comply with the ordinance regarding size and height. Appropriate State and Federal signage will be provided for the handicap parking. 1 Site lighting will use three (3) 20 foot high poles with 400 watt high pressure sodium shoe box type fixtures. The fixture height is compatible with the building and the lighting color is the same as used for the bank. Cutoffs will limit off-site glare at the site boundary. Landscaping is proposed to meet the draft landscape ordinance requirements for quantity of material and appropriate levels of screening. The service/drive thru area uses coniferous trees, shrubs and berms to screen/soften the appearance from the adjacent residential area. Shrub massings are used along Highway 13 and the west boundary to screen the parking area. Foundation planting are used around the building and trash enclosure to soften their appearance. Annual beds are placed at entry points and key visual locations for focal enhancement. The overall intent is to screen views of the service and parking areas, soften the building and provide appropriate visibility at the site entry and of the building and siqnage. Drive thru stacking is provided for 5 cars. Subway indicates this is adequate for their anticipated peak demand. Also, the Northwestern University Traffic Institute provides the following calculation to determine appropriate stacking: Stacking length = 20 ft. x the number of drive-thru vehicles that can be expected to be stored in a 1 5 minute period. Subway indicates three minutes is the typical average for each transaction. Therefore five stalls is appropriate. Another scenario is that this proposed store is expected to have 200 transactions per day with 30\ expected to be drive-thru. 200 x 30\ 60 transactions drive-thru percentage total expected drive-thru transactions per day 40 transactions expected for peak lunch period (11:00 a.m. - 1:30 p.m.) 5 transactions expected for peak 15 minute period If the last drive-thru space is filled, customers can continue to an open parking stall by the building. Employee parking is closest to Duluth Avenue to avoid conflicts with customer traffic at the site entry. CONDITIONAL USE PERMIT The proposed use requires a conditional use permit within the B-1, limited business zoning district. The following comments relate to the listed "Criteria for Approval" as found in the zoning ordinance. 1. The proposed use is an allowed conditional use within the existing B-1 zoning district. The proposed site plan conforms to or exceeds all general regulations of this ordinance (except as per requested parking quantity variance. See following discussion for this request) . 2 2. There will be nothinq associated with the construction or operation of the proposed use that would be dangerous, injurious or noxious to any other property or person and comply with the performance standards. 3. The proposed use is sited, desiqned and landscaped to produce a harmonious relationship between structure, site and adjacent land uses. 4. The proposed project will fit visually with the neighborhood. The architecture has a residential character for transition to the single family neighborhood and materials compatible with the adjacent commercial use. Landscaping will soften, enhance and screen as appropriate. 5. The entry point provides adequate visibility at the public street. The distance from adjacent street intersections avoids any potential conflict. Internal traffic circulation provides for smooth movement and ease of parking. Adequate parking is proposed. 6. The prosed use fully complies with the objectives of the zoning ordinance and is consistent with the Comprehensive Plan. 7. There are no Conservation District issues to address. Performance Standards for Conditional Uses 1. There are no flammable or explosive materials handled or stored on site that would create a unique fire hazard. 2. There are no activities that would create an electrical disturbance. 3. There are no objectionable noise generators that are involved with this use. 4. There are no activities that generate vibrations. 5. There are no undesirable odors generated from this use. 6. There are no air-borne pollutants produced. 7. Lighting will be controlled to avoid undesirable glare on adjacent property and roadways. 8. Erosion will be controlled during and after construction by appropriate methods (i.e.: erosion control fabric, landscaping, ground cover, rip-rap spillways, etc.). 9. The proposed use will conform to the water pollution standards of the Minnesota Pollution Control Aqency. No unique water pollutants would be generated by this site and proposed use. 3 VARIANCE REOUEST The current zoning ordinance requires that the proposed use provide 40 parking stalls. Based on the performance of other similar Subway restaurants, this amount of parking is in excess of what is needed to operate at acceptable levels. Therefore, a variance is requested for 27 parking stalls. The following are similar free standing Subways for comparison. All are 36-40 seats and have drive-thru operations. Three are operational and functioning at acceptable levels with available parking. . Monticello, MN (operational) . 26 parking stalls . Fergus Falls, MN ( opera tional ) . 25 parking stalls . Manka to, MN (operational) . 20 parking stalls . New Pra9\le, MN (approved, scheduled to start construction October, 1992) . 20 parking stalls A number of Twin City area communities were also checked regarding how they determine parking needs. Of the 20 t communities reviewed, a few also used Prior Lakes ratio of 1 stall per 15 sq. ft. of floor area. Definitions of floor area ranged from the seating/public counter area to the entire building. This ratio typically is listed for drive-in restaurants within most ordinances, meaning the older style, A&W type drive-in with car hops which usually had no interior seating or service areas. Below is a sampling of various ordinance parking standards for class II, fast food type restaurants. . Prior Lake/Lakeville 1 stall per 15 sq. ft. seating/counter area 598 sq. ft. + 15 = 40 stalls . Brooklyn Park This City also had a 1 stall per 15 sq. ft. ratio but applies it only to the older style drive-in. Their ratio for fast food restaurants is: 1 stall per 35 sq. ft. of seating/counter area 598 sq. ft. + 35 = 18 stalls . savage/Chaska/Eden Prairie/Apple Valley 1 stall per 3 seats (Savage has a 1 stall per 20 sq. ft. standard for drive-ins but uses the seating standard for fast food restaurants) 14 stalls 4 . Minnetonka 1 stall per 60 sq. ft. gross floor 1600 sq. ft. + 60 z 27 stalls . St. Louis Park 1 stall per 25 sq. ft. seating/counter 598 sq. ft. + 25 = 24 stalls . Champlin 1 stall per 75 sq. ft. gross floor 1600 sq. ft. + 75 = 22 stalls . Blaine/St. Paul 1 stall per 100 sq. ft. floor 1600 sq. ft. + 100 z 16 stalls . Burnsville 1 stall per 50 sq. ft. of floor area plus 1 stall per employee on largest shift 1600 sq. ft. + 50 = 32 + 7 employees 39 stalls . Plymouth 1 stall per 2.5 seats plus 1 stall per 15 sq. ft. counter area (40 seats + 2.5) + (165 sq. ft. + 15 sq. ft.) 27 stalls The communities checked varied from 12-46 stalls for the proposed facilities. Those listed above range from 14 to 40 stalls with Prior Lake being at the top end of the range. Typical averages are 22 to 27 stalls. The proposed parking is for 27 stalls. This is compatible with the standards of Minnetonka and Plymouth which are based on two different methods of calculations (building area and seating/counter area respectively). The proposed 27 stalls is also similar or greater that the other comparable Subways currently in operation. The following comments relate to the standards to be met for a variance approval. Even though the ordinance states that all of the following requirements must be met, items 3 and 4 should take an overriding precedent. 1. Literal enforcement of the ordinance would only result in an undue hardship with respect to the property in that unnecessary additional land would need to be acquired to provide parking in excess of that appropriate for safe and reasonable operation of the proposed use. 2. There is no hardship unique to the property. 3. The hardship is created by the parking provisions of the ordinance and is not the result of actions by persons having an interest in the property. Earlier discussion points out that the current ordinance is likely outdated and excessive in its parking requirements for this type of use. 5 4. The variance is believed to be in the spirit and intent of this ordinance, produces substantial justice and is not contrary to public interest. The ordinance intends to provide adequate off- street parking appropriate for the proposed use such that it will protect the health, welfare and safety of the general public. The examples provided in earlier discussion should demonstrate that the proposed parking is adequate for the intended use and will not create an undo hardship on the owner, City or general public. 6 DEVELOPMENT DATA proposed Building Area Lot Coverage of Building Parking Required 1 stall per 15 sq. ft. customer 598 s.f. + 15 + 40 stalls parking proposed std. stalls 9' x handicap per ADA total Zoning Standards Minimum lot area Minimum lot width Minimum Yard Setbacks Front Side Rear parking/Drive Lanes . 20,098 t sq. ft. . B-1 Limited Business . B-1 with C.U.P. for fast food restaurant . 1600 t sq. ft. . 7.96' . 40 area Site Area Existing zoning proposed Zoning . 27 (variance) 18' - 25 stds. -2 27 . 20,000 sq. ft. . 120 ft. . 30 ft. . 15 ft. . 30 ft. Oft. LEGAL DESCRIPTION The southwesterly portion of that part of the West Half of the Southeast Quarter of Section 2, Township 114, Range 22, Scott . County, Minnesota and that part of the East Half of the Southwest Quarter of said Section 2, lying northerly and easterly of the northwesterly right-of-way line of State Trunk Highway No. 13, southeasterly of the southeasterly right-of-way line of Old Trunk Highway No. 13 (Duluth Avenue) and southwesterly of the following described line: Commencing at a point on the east line of said West Half of the Southeast Quarter, distant 1940.80 feet north of the southeast corner of said West Half of the Southeast Quarter, said point being on the south line of a Town Road: thence deflecting to the west at an angle of 92 degrees 32 minutes 00 seconds along said south line of a Town Road a distance of 652.15 feet more or less to the intersection with the northwesterly right-of-way line of State. Trunk Highway No. 13; thence continuing on an assumed bearing of South 87 degrees 39 minutes 52 seconds West along said south line of a Town Road, a distance of 759.70 feet to its intersection with said southeasterly right-of-way line of said Old Trunk Highway No. 13 (Duluth Avenue); thence southwesterly along said southeasterly right-of-way line along a non tangential curve concave to the northwest having a radius of 1185.41 feet a chord bearing of South 22 degrees 39 minutes 47 seconds West an arc length of 231.50 feet to the point of beginning of the line to be described; thence South 60 degrees 00 minutes 00 seconds East a distance of 310 feet more or less to said northwesterly right-of-way line and there terminating. LANDOWNER Norman Barsness Estate Trust c/o Bob Barsness Prior Lake State Bank 16677 Duluth Ave. s.!. Prior Lake, MN 55372 phone: 447-2101 APPLICANT/DEVELOPER Davann, Inc. Brad and Mary Busse 1420 Mallard Court Chanhassen, MN 55317 Phone: 448-5710 SURVEYOR Valley Surveying Co., P.A. 16670 Franklin Trail S.E. Prior Lake, MN 55372 Phone: 447-2570 ARCHITECT Michael J. Wilkus Architects 14180 W. 78th Street Eden Prairie, MN 55344 Phone: 949-0985 PLANNER/ENGINEER/LANDSCAPE ARCHITECT .Westwood Professional Services, Inc. 14180 W. 78th Street, Suite 220 Eden Prairie, MN 55344 Phone: 937-5150 i :- "':.'); ,.J" ~ P!Dt ~-3~ - - CITY OF PRIOR LAKE APPLICATION FOR VARIAN:! Applicant: Davann, Inc. Address: 1420 Mallard Lane: Chanhassen. MN 55317 Property Owner: Norman Barsness Estate Trust 55372 AddresS: c/o Prior Lake Stat~ ~nk :...J.6677 D~~~f~ Av~. Type of Ownership: Fee Prior La e CdHtract Oonsultant/Contractor:Westwood Professional Services 14180 W. Hwy 5 Eden Prairie, MN 55344 Bome Phone: 448-5710 WOrk Phone: 44R-~71n Home Phone: ------- SEWOEk Phone: 447-2101 Purchase 1'.greenent x Phone: 937-5150 Existing Use of Property: Vaeant Legal Description of Variance Site: see attached descriPtion Variance Requested: Building setback variance from 50 feet to 34.95 feet adjacent to Hwv. 13 and from 85 feet to 74 feet adiacent to Duluth Avenue. (see attached narrative) Bas the applicant previously sought to plat, rezone, obtain a variance or conditional use peIJDi.t on the subject site or any part of it? Yes x R> What was requested: When: Present Zoning: B-1 Disposition: Describe the type of improvements proposed: site plan approval for a free-standing subway restaurant. &JBMISSION REUJIREMENTS: (A)CaDpleted application fom. (B)Filing fee. (C)Property &1rvey indicating the proposed developnent in relation to property lines and/or ordinaty-bigh-water mark; proposed building elevations and drainage plan. (D)Certified fran abstract fim, names and addresses of property owners within 100 feet of the exterior boundaries of the subject property. (E)Canplete legal description & Property Identification Number (pm). (F)Deed restrictions or private covenants, if applicable. (G)A parcel nap at 1--20 '-50' showing: The site deve10pnent plan, buildings: parking, loading, access, surface drainage, landscaping and utility service. ONLY OJMPLETE APPLICM'IONS saALL BE ~J.'w AND REVnMD BY THE PIANNINi a:HotISSION. To the best of my knowledge the infotmation presented on this fom is correct. In addition, I have read Section 7.6 of the Prior Lake Zoning Ordinance which specifies requiranents for variance procedures. I agree to provide information and follow the procedures as outlined in the Ordinance. ~t:l6 4. ~ . / ~ lIpplicants S~ture SJl::mitted this J2day of ' 19 '1.2. Fee <Nners Signature THIS SPACE IS 'ID BE FILLED our BY THE PLANNIro DlREcr'OR PI..ANNnX; a::t1MISSION CITY COUN:IL APPEAL <DNDITIONS: APPROlED APProvED DENIED DENIED DATE OF HEARINi DATE OF HEARINi Signature of the Planning Di rector Date 09;18"92 10:10 F.tI 612 ~~i ~2~3 eIn PRIOR UKE 7:.0';;' ,.-' iii 003 ~ --- C!.T'I Of PRIOR LAKE APPLICATION roR VARIANCE .. V'A.-- PIDt Davann, Inc. Bane Phone: Work Phone: Sane Phone: 448-5710 448-5710 447-2101 chase Agreanent x Existing Use of Prcpertyl Vacant Present Zoning: B-1 Legal Description of Variance Site: see attached descriotion Variance Bequested: reduction in oarkin~ from 40 reauir~q bvCft~.. <?.F~diqance to a w". demonstrated need of 27 . . . Has the applicant previously sought to plat, rezone, obtain a variance or conditional use pemit on the subject: site or any part of it? Yes x No What: was requested: When: Disposition: Describe the ;ype of improvements proposed: Sub~av restaurant. site plan approval for a free-standing .-.~. ".A.','-:P.J ...'....,~_~. .~-..-. .~.;e.~""'i? . SOBMISSION ~: (A)Comp1eted application tom. (B)Filinq fee. (C) Property Suvey indicating' the proposeO cwelopnent in relation to property lines and/or ordinaty-high-water mark; ptQP'6eC building elevations and drainage plan. (D)Certified from abstract firm, names and addresses of pr0p9rty owners within 100 feet of the exterior boundaries of the subject property. CE)Complete legal description << Property Identification Number (PIC). CF)tleed restrictions or private covenants, if applicable. CG)A parcel nap at 1"-20'-50' shewing: The site developnent plan, buildings: parkinq, loadir.g, access, surface drainage, landscaping iiU1d utility service. ONLY COMPLETE APPLICATIONS S!ALL BE ACCeYrED AND REVIEWED BY 'l'HE PLANNIm CJ:t.iMISSION. To the best of my knowledge the infomation presented On this form is correct. In. addition, I have read Section 7.6 of the Prior Lake Zoning Ordinance which specifies requirements for variance procedures. I agree to provide information and follow the procedurllS as outlinad in t:ha Oll!inance. ~~~ AA . Applicants gnature &11:mitted this &&.y of /1~-,19'JJ. Fee OWners Signature 'lmS S?ACE IS 'It) BE FILLED 00l' BY mE PI.ANNIN3 DIiECroR lUNNING Ol-1MISSION Cl'1!':l COtJN:IL APPEAL CONCmONS: APPBCmD APPIOlED DENIED DENIED Ci\1'E OF HFARIm DATE OF BFARIN:i ....-: ...... .'.' "t.. ...... . .~.~. - ,,.......,,. ,~~l)_ . "'I _ Signature ot the Plannir.g Director Date ~ SUBWAY . Variance Request - Front Yard Building Setbacks The proposed Subway was designed to meet or exceed the 30-foot B-1 Limited Business front yard building setback. A 30-foot setback is proposed to Duluth Avenue and a 34.95-foot setback is provided to Highway 13. These proposed setbacks would still require a variance from the required collector street and Highway 13 minimum front yard building setbacks which are as follows: - Collector street - (Duluth Avenue S.E.) 85 feet, measured from the centerline of the existing traveled roadway, in platted areas with utilities - Highway 13 - 50 feet from the right-of-way line The requested front yard building setback variances would be: 1. From 85 feet to 74 feet from the collector street (Duluth Avenue S.E.) 2. From 50 feet to 34.95 feet from Highway 13. The following comments relate to the standards to be met for a variance approval. 1. The literal enforcement of the ordinance would create an undue hardship with respect to the property in that the size and shape of the parcel limits reasonable site layout alternatives due to a curve along the westerly boundary adjacent to Duluth Avenue. This has forced the building to be located closer to Highway 13 than the minimum 50-foot setback. The building location is a result of locating the site vehicle entrance to the easterly side of the site as far from the intersection of Duluth Avenue and Highway 13 as is possible to avoid potential traffic conflicts. 2. Such unnecessary hardship results because of circumstances unique to the property. See discussion above. 3. The hardship is caused by provisions of the ordinance and is not the result of actions of persons having interest in the property. The Duluth Avenue alignment was determined by earlier governmental decisions. The lot width and area provisions of the ordinance have dictated to a great degree the subdivision of the property. 4. The variance observes the spirit and intent of the ordinance, produces substantial justice and is not contrary to the public interest. The setback variances are minimal (11 feet along Duluth Avenue and 14.95 feet along Highway 13). Site design attempted to maximize the setbacks where possible. The variance along Duluth Avenue is only for a small corner of the building_ The front yard building setbacks do meet or exceed the B.1 standards. The setbacks provided for the driveways and parking areas (5-18 feet) are well in excess of that required (0 feet). This setback area is used to provide landscaping and buffering that typically has not occurred in Prior Lake. This variance will not create an undue hardship on the health, welfare or safety of the general public. (EXi~ting Single Family Re.'lidentia~ / / I ;s- / -S' / .<:).::i / / / / I / (Adjacent Vacant B-1 Parcel I / / / / / / / I l- I I I I i I I I I / / I / I rJ I , I -- I Anna Trail - --....... '" ) I I \ \ \ \ \ \ \ , \ \ \ I / I / 85' I I I I I \ \ \ \ \ \ \ \ \ "- ........... /' /' .-/ ...- /' \'; .-/ .-/ .-/ .-/ .-/ /' .-/ .-/ .-/ .-/ .-/ ~~'3-~ /' ~\~ ,/ ....... - -- "SU09PN" NOTICE OF SUBDIVISION PUBLIC HEARING FOR BUSSE FIRST ADDITION You are hereby notified that the Planning Commission will hold a Public Hearing in the Prior Lake City Council Chambers at 4629 Dakota Street S.E., on Thursday, February 4, 1993 at 7:35 p.m. The purpose of the public hearing is to consider the BUSSE FIRST ADDITION, into two commercial lots. description of the property is as follows: subdivision The legal LEGAL DESCRIPTION: That part of the West Half of the Southeast Quarter of Section 2, Township 114, Range 22, Scott County, Minnesota and that part of the East Half of the Southwest Quarter of said Section 2, lying northerly and easterly of the northwesterly right-of-way line of State Trunk Highway No. 13, southeasterly of the southeasterly right-of-way line of Old Trunk Highway No. 13 (Duluth Avenue) and southwesterly of the following described line: Commencing at a point on the east line of said West Half of the Southeast Quarter distant 1940.80 feet north of the southeast corner of said West Half of the Southeast Quarter, said point being on the south line of a Town Road; thence deflecting to the west at an angle of 92 degrees 32 minutes 00 seconds along said south line of a Town Road a distance of 652.15 feet more or less to the intersection with the northwesterly ri~ht-of-way line of said State Trunk Highway No. 13; thence continulong on an assumed bearing of South 87 degrees 39 minutes 52 seconds West along said south line of a Town Road a distance of 759.70 feet to its intersection with said southeasterly right-of-way line of said Old Trunk Highway No. 13 (Duluth Avenue); thence southwesterly along said southeasterly right-of-way line along a nontangential curve concave to the northwest having a radius of 1185.41 feet a chord bearing of South 22 degrees 39 minutes 47 seconds West an arc length of 231.50 feet to the point of be~inning of the line to be described; thence South 60 degrees 00 mlonutes 00 seconds East a distance of 310 feet more or less to said northwesterly right-of-way line and there terminating. Or more commonly described as: Approximately 1.3 acres lying north and east of the intersection of S.T.H. 13 and Duluth Avenue and located west of the Prior Lake State Bank Building. 4629 Dakota 51. 5.E., Prior Lake, Minnesota 55372 / Ph. (612) 447-4230 / Fax (612) 447.4245 AN EQUAL OPPORTUNITY EMPLOYER If you desire to be heard in reference to this matter, you should attend this hearing. The Planning Commission will acce~t oral and or written comments. If you have questions regard long this matter, contact the Prior Lake Planning Department at 447-4230. /J);JJ#tO-A A~ Deborah Garross Assistant city Planner To be published in the Prior Lake 25 and February 1, 1993. American on Monday, January ~ r------ ~-- / ------~ / ..." pA' / / t/~' · '"---_o- j /+/ MAR\.lIJ;;:rr;;: /~ ~ -------- - ~':. - / ------ ~ -------------------------- / -',.- ~~ ~~ ~ '.04, ~ - ~... ----------' ~ ......... '" ............... ~ - - 4 ~ ~.-~ " =_-:.::=.--~ ........... ./. -_0I~- ~E! _01 :- ~ -:::'L;..;,.. ,.. ... .. .::;.. ':: PffEPAR BRAO ~SSFOR: 1'1110* E CHANHAJtttRO COfRT . W<I. 553/4 ""E_ Vo/Iey D fI'(, '"10 ~1ttJ Co .. ,.",OR ~IN TRA ~ .,.04. t/llllJ ...7 _ z,':,. ,~'7lE. / o ... E ....LW / I EXPANDED ! I BUSSE PREUMINARY P _,........ .._._ \ FIRST ADDIT tAT OF \ _ _._- \ .ION "02 - A I, N~ I · I ~- \ --........ \ ~ \\ .... _n \ -. ....- ...... "" "1.1- "" _LilKj_ '~:ii:5~~> "v// </ ~~~" 'i. !. :~----- ANN"- :,R:~R ",. ....,.,.,... -- --- -- ---- TRA::' .. .. ,rrJ - - ------ - ---"\ / / ,'/ ,t' . " / " _~:<z ..~~.~TC. 6A::l< ~I I:J :,jJ'jf-Jf J~ f~IJ' IJJ1f,JI1- .J ("IJII JI ill ijjJI II.' If !f j 1!:f.fl~i:J 1. J,'I 'f I II' )1 t=:I'1 fi,li:'!I; 11 II i fll'I!!I! II ~f~1 1.ltl lIt! ij liil ililil,llj ii I'l! !1::I;fl~J II11 .:!J ii~~f:il~J! IJJ; JIll '~I~I ' J ,. 'f.l I' I f !t; ~~Ji !If';!~111JI :JiJl till f'llill~i~I~8! 21 Iii; J hl.hJ o - I- - 2J <(I J I-J <ni O::g G:I J 'i . ::> d; Ql : J Ii j. j~ ~ I' J ! ;1 J ,I j: ,I I I 1 I! I' .j I, I! ., j! !i L '1 jJ J ii f) I .1 JJ H HI 'I! I f I n. n ,) !~ II _~ · 'UI i 1.(. I Iii" . 'fl. I " 1, .I !iil i ! I~f; i I!:~ I 'In II Ili!l fl H~II' 1 J.II aI f:' I ' '111' JJ I J:!.I I IIi .;hl "Itl ".", . ~t; lI,l, .,~' ~. i~ .' ~~ I I .1 ".1 1 I I I r I J I i' '1 I J ,I II 'J j J; fi .1 J , I J I I) i j' i If ! .J j hi f~ "- 'I IIi M Or (J) J~ I 11 ! U . II i i Ii I ~ i I ., : 'I f. J I ! r. ! i ' !l I ! :; il OJ Ii. IJ 1,1 'ii I II I) :d .. 1:1 ci Q,; 8 / 1 t ~ " j I "VA35PN" NOTICE OF HEARING FOR CONDITIONAL USE PERMIT AND VARIANCE APPLICATION You are hereby notified that a hearing will be held by the Planning Commission in the Prior Lake Council Chambers at 4629 Dakota Street S.E. on: February 4, 1993 at 7:35 p.m. PURPOSE OF HEARING: To consider a conditional use permit and variance application for Davann, Inc., 1420 Mallard Lane, Chanhassen, MN 55317. SUBJECT SITE LOCATION: Vacant parcel located southwest of Prior Lake State Bank and northeast of the intersection of Duluth Avenue and S.T.H. 13. If the proposed subdivision of Busse First Addition is approved, the subject site would be Lot 1, Block 1, Busse First Addition. (See enclosed subdivision notice and map for reference.) REQUESTED ACTION - CONDITIONAL USE PERMIT: The applicant proposes to construct a "Subway" restaurant on the most southwesterly corner of the property. The proposal is to develop a 1600 square foot, 40 seat Subway restaurant with 27 parking stalls and a drive-thru window. Access will be from Duluth Avenue approximately 270 feet north of Highway 13. The building is proposed to be located on the west side of the site with parking to the east, away from Duluth Avenue and adjacent to an undeveloped commercial parcel. The subject site is zoned B-1 Limited Business which is intended to provide commercial opportunities for office, retail and service establishments. The "Subway" restaurant is considered to be a fast food establishment and as such, requires that a conditional use permit be granted before construction can begin. The purpose of a conditional use permit process is to evaluate the "Subway" proposal and to allow the City to place special restrictions on the business in order to reduce negative impacts to adjacent properties. The "Subway" proposal will be reviewed to determine noise, traffic, visual impression, neighborhood compatibility, as well as other performance criteria listed in the Zoning Ordinance. 4629 Dakota St. S.E., Prior Lake, Minnesota 55372 / Ph. (612) 4474230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPlDYER .... REQUESTED ACTION - VARIANCE APPLICATION: In order to build the "Subwa~" restaurant as J?roposed, the applicant requests the follow1ng setback and park1ng variances: The required setback from the centerline of Duluth Avenue is 85 feet. The applicant requests an 11 foot variance from this standard in order to locate the building 74 feet from the centerline of Duluth Avenue. The required setback from S.T.H. 13 right-of-way is 50 feet. The applicant requests approval of a 15.05 foot variance from the standard in order to locate the building 34.95 feet from the right-of-way line. The Zoning Ordinance requires 40 parking spaces for the proposed building. The applicant requests a variance to allow 27 parking stalls instead of the required 40 stalls. If you desire to be heard in reference to this matter, you should attend this meeting. Oral and written comments will be accepted by the Plannin9 Commission. For more information, contact the Prior Lake Plann1ng Department at 447-4230. Prior Lake Planning Commission DATE MAILED: January 19, 1993 't 'l' ~ . ; @!.- . .,.~ ~!;'N . &ouTH ~ . c ','" .... " ; " " " " @~~~!;'N . NO~TH ....c. Ii " I~ J G> L -.- 1 ~ d: \ J \ \ J \ ~ \ . \ , , '\\ \ \ \ \ ..... \ \ \ \ \ \ \ I I - I -, I b -- / -- / J -- _/ .-- ------~---- If - "' \ -- i U .r /-- ----------