HomeMy WebLinkAbout3E - Tower St & Toronto Ave. Prj. 90-12 CONSENT AGENDA: PREPARED BY: SUBJECT: DATE: INTRODUCTION: BACKGROUND: HERITAGE 1891 COMMUNITY 1991 2((9/ WJ~% 3 (e) BRUCE LONEY, ASSISTANT CITY ENGINEER CONSIDER APPROVAL OF CHANGE ORDER NO.2, PROJECT 90-12, TOWER STREET AND TORONTO AVENUE IMPROVEMENTS NOVEMBER 18, 1991 During the course of construction for Project #90-12, additional work beyond the Contract was done by the Contractor. A Change Order for this additional work has been prepared and enclosed in the Agenda packet for Council approval. The contractor, Brown & Cris, Inc. and his subcontractors, have performed additional work which was not included in the original contract. The additional work is described and itemized costs are shown on the enclosed memorandum and Change Order form. A total of five (5) additional items are described with the total cost of the Change Order being $16,714.62. Item #1 is associated with the installation of a storm sewer outlet on Toronto Avenue and grading of drainage ditches. This work was necessary after the storm sewer system was not installed on the Enivid development site and an outlet was needed in order to complete the street improvement on Toronto Avenue. Total cost of item #1 is $2,000.00 and this work was described on the attached May 14, 1991 memorandum to Council. Item #2 is for the installation of a sanitary sewermain and watermain stubs on Tower street to serve the Woodridge Estates development. This work become necessary upon the annexation and preliminary plat submittal of Woodrid~e Estates First Addition. Total cost of th1s work is $13,199.56 and is to be paid for by Trunk Reserve Funds (See attached August 23, 1991 memorandum on this work). 4629 Dakota St. S.E,. Prior Lake, Minnesota 55372 / Ph, (612) 447-4230 / Fax (612) 447-4245 ALTERNATIVES: RECOMMENDATION: BUDGET IMPACT: Item #3 was for the removal and placement of the excess Class 5 aggregate base surcharge material on Tower street to other areas on the project. The cost of this work is $534.00 and was described on the attached May 14, 1991 memorandum. Item #4 is for the repair of a damaged ~ate valve box and curb box on the project s1te. Both items were discovered during the grading operations and it was determined that the damage occurred prior to this project. Total cost of item #4 is $481.06. Item #5 is for the milling of bituminous pavement adjacent to the concrete curb on the portion of Tower street that is to have a bituminous overlay. Bituminous overlay work was added to the contract by a supplemental agreement dated May 14, 1991 and was described in the attached May 14, 1991 memorandum to Council. Total cost of this work in the change order is $500.00. The total amount of this Change Order is $16,714.62 with the original contract amount being $382,105.00. Change Order No. 1 in the amount of $8,452.63 was added to the contract last year, making the contract amount total at $390,557.63. The addition of Change Order No. 2 represents a 4.4% increase in the original contract amount and the contract amount total is now $407,272.25. The alternatives are as follows: Approve a motion authorizing Change Order No.2 in the amount of $16,714.62 to Brown & Cris, Inc. 2. Disapprove the motion for a specific reason. 1. 3. Table this item for a specific reason. The recommendation is to approve Change Order #2 as the contractor has completed the work. This amount will be paid from the Construction Fund and has been included with this month's construction voucher. Sufficient funds exist to pay for the additional cost from this change order. Reimbursement for the change ACTION REQUIRED: order items No.1, 3 and 5 can be obtained by applying for Municipal state Aid Participation funds upon the completion of the project. Item #2 will be paid for with Trunk Reserve funds as this installation of sanitary sewermain and watermain was necessary to serve the Woodridge Estates First Addition. Make a motion as part of the Consent Agenda to approve Change Order #2 for Project #90-12 authorizing the Mayor and City Manager to sign the Change Order. HERITAGE 1891 COMMUNITY 1991 '/OJ:!Jr!).!Y .2Q9f CHANGE ORDER CITY OF PRIOR LAKE 4629 DAKOTA STREET S.E. PRIOR LAKE, MN. 55372 DATE: TO: FOR: FOR: October 30t 1991 Brown 'Crls Inc. Pro ect No. 90-12 Clty 0 Pr10r La e, CHANGE ORDER NO. 2 Tower St. , Toronto Ave. 1m rovements M1nneso a You are hereby directed to make the following change to your contract dated July 16, 1990 . The change and the work affected thereby is subject to all contract stipulations and covenants. This Change Order will (increase) the contract sum by sixteen Thousand, Seven Hundred, Fourteen and 62/100 Dollars (16,714.62 ). Item 1 - Labor, material, and equipment for installing storm sewer outlet on Toronto Avenue Item 2 - Labor, material, and equipment to install sewer and water extensions to the proposed. Woodridge Estates development Item 3 - Labor and equipment to regrade and distribute excess Class 5, Aggregate Base from surcharge area on Tower street Item 4 - Labor, material, and equipment to repair previously damaged curb box and gate valve box Item 5 - Labor and equipment to mill the bituminous pavement on existing Tower Street $ 2,000.00 $13,199.56 $ 534.00 $ 481.06 $ 500.00 NET CHANGE ORDER $16,714.62 Amount of Original Contract Additions approved to date (Nos. Deductions approved to date (Nos. Contract amount to date Amount of this Change Order (Add) Revised Contract Amount 1 ) ) 382,105.00 8,452.63 0.00 390,557.63 16,714.62 407,272.25 4629 Dakota St. S.E., Prior Lake, Minnesota 55372 I Ph, (612) 447-4230 I Fax (612) 447-4245 DATE: TO: FOR: FOR: CHANGE ORDER NO. 2 Approved as to Form: CITY ATTORNEY APPROVALS: Approved CITY OF PRIOR LAKE Owner Respectfully Submitted, CITY OF PRIOR LAKE ENGINEERING DEPARTMENT By Mayor Date By City Manager Date Bruce Loney Project Engine Approved Brown & Cris, Inc. . Contractor B0 )(Uk(LJliJYi Lt L~ '-< (!J71 II~ ' Da Title HERITAGE 1891 COMMUNITY 1991 <{gJ.5(JJV 2Q91 TO: FROM: SUBJECT: DATE: LARRY J. ANDERSON, DIRECTOR OF PUBLIC WORKS BRUCE LONEY, ASSISTANT CITY ENGINEER PROJECT 90-12, CHANGE ORDER NO. 2 OCTOBER 31, 1991 EXTRA WORK ITEM DESCRIPTION & COST On the above referenced project, extra work items were required above the contract scope. The extra work items are listed below with the associated costs and date when the work was completed. These costs have been tentatively agreed to by the contractor, Brown & Cris, Inc. 1. Lump sum amount for contractor to provide and equipment to install storm sewer Avenue. This outlet was originally to be developer of the adjacent site. all labor, material outlet on Toronto constructed by the ASSOCIATED COST AMOUNT June 13, 1991 LUMP SUM AMOUNT (INCLUDES OVERHEAD AND PROFIT OF GENERAL CONTRACTOR) NET TOTAL FOR ITEM NO. 1......................... $2,000.00 2. Labor, material, and equipment to extend sanitary sewer and watermain outside of the graded right-of-way of Tower Street. These extensions were installed to provide service to the proposed Woodridge Estates development. ASSOCIATED COST AMOUNT September 10 - 11, 1991 Mobilization 8" SDR 35 PVC Pi~e - 151 LF @ $25.00/LF Connect to exist1nq sanitary sewer - LS 8" PVC Cap 1 @ $25.00/EA Manhole 1 $l,200.00/EA Pipe Bedding 86.63 TN @ $12.00/TN Wet Tap 6"x 20" 1 @ $1, 650/EA 6" CL. 52 Watermain DIP - 160 LF @ $23.00/LF 6" DIP Plug 1 @ $30. OO/EA Testing Sewer and Water LS $1,050.00 $3,775.00 $ 500.00 $ 25.00 $1,200.00 $1,039.56 $1,650.00 $3,680.00 $ 30.00 $ 250.00 4629 Dakota St. S,E., Prior Lake, Minnesota 55372 / Ph. (612) 447-4230 / Fax (612) 447-4245 (INCLUDES OVERHEAD AND PROFIT OF GENERAL CONTRACTOR) NET TOTAL ITEM NO.2. . . . . . . . . . . . . . . . . . . . . . . . . .. $13, 199 . 56 3. Labor and equipment to regrade and distribute excess Class 5 aggregate base from the surcharged section of Tower Street ASSOCIATED COST AMOUNT September 16 - 20, 1991 Front End Loader 3 HRS @ $98.00/HR $ 294.00 Motor Grader 3 HRS @ $80.00/HR $ 240.00 (INCLUDES OVERHEAD AND PROFIT OF GENERAL CONTRACTOR) NET TOTAL ITEM NO.3........................... $ 534.00 4. Labor, materials and equipment to repair a damaged gate valve box and curb box - both were discovered during final grading operations. It was determined that each were damaged prior to construction of this project. ASSOCIATED COST September 20, 1991 Backhoe Foreman Pipelayer Laborer Curb Box Coupler 18" Curb Box Ext. Curb Box Cap 24" Valve Box Ext. 24" Valve Box Top Section ( INCLUDES 1/2 HR @ 3 1/2 HR @ 2 1/2 HR @ 2 1/2 HR @ 1 EA @ 1 EA @ 1 EA @ 1 EA @ 1 EA @ OVERHEAD AND PROFIT $75.00/HR $46.00/HR $35.50/HR $34.00/HR $11.03/EA $ 3.68/EA $ 6.37/EA $35.19/EA $52.54/EA OF GENERAL $ $ $ $ $ $ $ $ $ CONTRACTOR) AMOUNT 37.50 161.00 88.75 85.00 11. 03 3.68 6.37 35.19 52.54 NET TOTAL ITEM NO.4............................ $ 481.06 5. Lump sum amount for contractor to provide all labor and equipment for milling of the bituminous pavement adjacent to the concrete curb on that portion of Tower street to be overlaid. October 17, 1991 Lump Sum (INCLUDING OVERHEAD CONTRACTOR) NET TOTAL FOR ITEM NO.1........................ $ 500.00 ASSOCIATED COST AND PROFIT OF AMOUNT GENERAL TOTAL TO DATE ITEM NUMBER ITEM TOTAL 1 $ 2,000.00 2 $13,199.56 3 $ 534.00 4 $ 481.06 5 $ 500.00 TOTAL ITEMS 1-5 $16,714.62 The following is a summary to date of the contract for Project #90-12: Amount of Original Contract Additions Approved to Date Deductions Approved to Date Contract Amount to Date Amount of this Change Order Revised Contract Amount $382,105.00 $ 8,452.63 $ .00 $390,557.63 $ 16,714.62 $407,272.25 The revised contract amount for Project #90-12 is $390,557.63. This includes Change Order #1. This Change Order would increase the contract amount by $16,714.62 on 4.3% of the revised contract amount. The project is approximately 93% complete with the remaining work anticipated to be complete this construction season. HERITAGE 1891 COMMUNITY 1991 18J.5fJ.A/' 2Q91 MEMORANDUM TO: MAYOR & CITY COUNCILMEMBERS 1 DAVID J. UNMACHT, CITY MANAGER 1.1.' BRUCE LONEY, ASSISTANT CITY ENGINEER ~ EXTRA WORK FOR PROJECT NO. 90-12, TOWER STREET AND TORONTO AVENUE AUGUST 23, 1991 FROM: SUBJECT: DATE: Please find attached to this memorandum a change order proposal for placement of sanitary sewermain and watermain lines under Tower street to 20 feet south of the north lot line of Outlot A, Enivid First Addition. This proposal is from Brown & Cris, Inc., the Contractor on Project 90-12 which is still under contract with the City of Prior Lake. Included also is a copy of the cross section view and plan view of the proposed sewer and water line installation. This installation is necessar~ to serve the proposed Woodridge Estates First Addition plat w1th utilities. It is being proposed to install these lines as shown on the drawings at this time before the street and sidewalk improvements are installed on Tower Street. Tower Street improvements are proposed to be completed during the 1991 construction season, however, this schedule is dependent on the soils engineer approval for placement of these improvements in the lightweight fill embankment area. The Woodridge Estates First Addition has been annexed to the City recentl~ and a preliminary plat has been submitted for approval. Ut1lity lines under Tower Street will be necessary in order to serve this proposed plat. The estimated cost of these extra work items is $12,375.00 and is proposed to be paid for b~ Trunk Reserve Funds as these are non-assessable trunk ma1ns. A formal change order with actual costs will be submitted to Council for approval after the work has been completed. The developer will be responsible for the extension of sanitary sewer and watermain lines through Outlot A which is owned by City of Prior Lake and is a~proximately 320 feet in length. Staff is requesting Council reV1ew this proposed extra work for Project No. 90-12 and asks that Councilmembers contact the City Manager by August 28, 1991 if there is a problem on proceeding with the work as proposed. 4629 Dakota St. S,E., Prior Lake. Minnesota 55372 / Ph, (612) 447-4230 / Fax (612) 447-4245 TO: FROM: SUBJECT: DATE: HERITAGE 1891 COMMUNITY 1991 18J.5{JA/~ 2Q91 M E M 0 RAN DUM ft- MAYOR & CITY COUNCILMEMBERS DAVID J. UNMACHT, CITY MANAGER BRUCE LONEY, ASSISTANT CITY ENGINEER EXTRA WORK FOR PROJECT NO. 90-12, TOWER TORONTO AVENUE MAY 14, 1991 AND STREET Please find attached to this memorandum a supplemental agreement for proposed extra work on state Aid Project 201-113-01 which is also known as City Project No. 90-12. There are three work items listed on the supplemental agreement that are needed to properly complete the road improvements. These items are summarized as follows: 1.) Removal of the surcharged Class 5 aggregate base material placed on the lightweight fill area. 2. ) A storm sewer outlet and ditch for Toronto Avenue drainage. 3 . ) A bituminous overlay on Tower Street from Station 13 + 50 to Station 16 + 50. The estimated cost of these extra work items is $5,249.00 and are eligible for MSA reimbursement by submitting this supplemental agreement to the District State Aid Engineer. A formal change order will be submitted to Council for approval after the work has been completed. Staff is requesting Council review this proposed extra work for Project No. 90-12 and asks that Councilmembers contact the City Manager by May 20, 1991 if there is a problem on proceeding with the work as proposed. 4629 Dakota St. S,E., Prior Lake, Minnesota 55372 / Ph. (612) 447-4230 / Fax (612) 447-4245