Loading...
HomeMy WebLinkAbout3C - Prj. 90-12 Change Order - Tower and Toronto Improvements 10 CONSENT AGENDA: PREPARED BY: SUBJECT: DATE: INTRODUCTION: BACKGROUND: "CELEBRATE PRIOR LAKE'S CENTENNIAL. 1991" 3 (c) BRUCE LONEY, ASSISTANT CITY ENGINEER CONSIDER APPROVAL OF CHANGE ORDER NO.1, PROJECT 90-12, TOWER STREET AND TORONTO AVENUE IMPROVEMENTS JANUARY 7, 1991 During the course of construction for Project #90-12, additional work beyond the contract was done by the Contractor. A Change Order for this additional work has been prepared and enclosed in the Agenda packet for Council approval. The contractor, Brown & cris, Inc. and his subcontractors, have performed additional work which was not included in the original contract. The additional work is described and itemized costs are shown on the enclosed memorandum and Change Order form. A total of three (3) additional items are described with the total cost of the Change Order being $8,452.63. Items #1 and #2 are associated with the installation of wood chips in the lightweight fill area. The wood chips were placed under the shredded tire chips in the lowest elevations of the lightweight fill area to keep the shredded tire chips above the nearby pond water elevation and was recommended by the Prior Lake-Spring Lake Watershed District. Attached to this Council Agenda Report is a supplemental agreement which was prepared and sent to the MnDOT District State Aid Engineer for approval of Municipal State Aid participation on these items. Item #3 was for the installation of a polyethylene film under the wood chip mulch in the bituminous curb median areas on Toronto Avenue. This material was placed to control the growth of weeds in the bituminous curb median areas and was inadverently omitted from the plans. 4629 Dakota St. S.E., Prior Lake, Minnesota 55372 / Ph. (612) 447-4230 / Fax (612) 447-4245 An Equal Opportunity/Affirmative Action Employer . , ALTERNATIVES: RECOMMENDATION: BUDGET IMPACT: ACTION REQUIRED: The total amount of this Change Order is $8,452.63 with the ori~inal contract amount being $382,105.00. ThlS represents a 2.2% increase in the actual contract. The alternatives are as follows: 1. Approve a motion authorizing Change Order No.1 in the amount of $8,452.63 to Brown & Cris, Inc. 2. Disapprove the motion for a specific reason. 3. Table this item for a specific reason. The recommendation is to approve Change Order #1 as the contractor has completed the work. This amount will be paid from the Construction Fund and has been included with this month's construction voucher. Sufficient funds exist to pay for the additional cost from this change order. Reimbursement for change order items No. 1 and 2 can be obtained by applying for Municipal State Aid Participation funds upon the completion of the project. Make a motion as part of the Consent Agenda to approve Change Order #1 for Project #90-12 authorizing the Mayor and City Manager to sign the Change Order. ... DATE: TO: FOR: FOR: HERITAGE 1891 COMMUNITY 1991 ct8J$,h" 2CZ91 CHANGE ORDER CITY OF PRIOR LAKE 4629 DAKOTA STREET S.E. PRIOR LAKE, MN. 55372 December 19, 1990 CHANGE ORDER NO. 1 Brown & Cris, Inc. proiect No. 90-12, Tower St. & Toronto Ave. Improvements City of Prior Lake, Minnesota You are hereby directed to make the following change to your contract dated Jul y 16, 1990 . The change and the work affected thereby is subject to all contract stipulations and covenants. This Change Order will (increase) the contract sum by Eiqht Thousand Four Hundred Fifty Two and ---- 63/100 Dollars (8,452.63 ). Item 1 - Add the following: See attached memorandum for specific details: Item 2 - Item 3 - Labor and equipment for installing wood $1,000.00 chip lightweight fill that was produced on site. Labor and equipment to furnish, deliver $7,350.00 and install 490 cubic yards of wood chips chips in the li~htweight fill area. Labor and materlal to install $ 102.63 polyethylene film under wood chip mulch. NET CHANGE ORDER $ 8,452.63 Amount of Original Contract Additions approved to date Deductions approved to date Contract amount to date Amount of this Change Order Revised Contract Amount (Nos. ) ~ (Nos. ) $ (Add) (11i'~) (~) 382,105.00 0.00 0.00 382.105.00 8.452.63 390.557.63 4629 Dakota St. S.E., Prior Lake, Minnesota 55372 f Ph. (612) 447-4230 / Fax (612) 447-4245 DATE: TO: FOR: FOR: 19{ 1990 CHANGE ORDER NO. 1 Crls, Inc. No. 90-12, Tower st. and Toronto Ave. Im~rovments Prlor La e, Minneso a Approved as to Form: CITY ATTORNEY Approved APPROVALS: By By CITY OF PRIOR LAKE Owner Mayor Date City Manager Date Approved Brown & Cris, Inc. Contractor BVJU~J4Jl tCk:~ Curv~u.~,,- Title 1t,/j0~U Date Respectfully Submitted, CITY OF PRIOR LAKE ENGINEERING DEPARTMENT ~Ma~ Bruce Loney Project Engineer INTER-OFFICE MEMO TO: FROM: SUBJECT: DATE: LARRY J. ANDERSON, DIRECTOR OF PUBLIC WORKS BRUCE LONEY, ASSISTANT CITY ENGINEER PROJECT 90-12, CHANGE ORDER NO. 1 DECEMBER 19, 1990 On the above referenced project, extra work items were required above the contract scope. The ertra work items are listed below with the associated costs and date when the work was completed. These costs have been tentatively agreed to by the contractor, Brown & Cris, Inc. EXTRA WORK ITEM DESCRIPTION & COST 1.) LumJ? sum amount for contractor to provide equ1pment in stockpiling and installing wood on site in the lightweight fill area. ASSOCIATED COST all labor and chips produced AMOUNT August 27, 1990 LUMP SUM AMOUNT (INCLUDES OVERHEAD AND PROFIT OF GENERAL CONTRACTOR) NET TOTAL FOR ITEM NO. 1.....................$1,000.00 $1,000.00 2.) Labor and material in furnishin~, delivering wood chips in the lightweight f111 area that off site. and installing were produced ASSOCIATED COST AMOUNT August 27, 1990 - September 30, 1990 490 C.Y. (vehicle measure) @ $15.00 per $7,350.00 cubic yard (vehicle measure). (INCLUDES OVERHEAD AND PROFIT OF GENERAL CONTRACTOR) NET TOTAL FOR ITEM NO. 2.....................$7,350.00 3.) Labor and material to install polyethylene film under the wood chip mulch which was installed in the bituminous curb medians on Toronto Avenue. ASSOCIATED COST AMOUNT November 10, 1990 1.5 hr. Pipelarer @ $35.50/hr................$ 53.25 Polyethylene f1lm - Two (2) rolls @ $24.69...$ 49.38 per roll NET TOTAL FOR ITEM NO. 3.....................$ 102.63 TOTAL TO DATE ITEM NUMBER 1 2 3 TOTAL ITEMS 1-3 ITEM TOTAL $1,000.00 $7,350.00 $ 102.63 $ 8,452.63 The contract amount for Project ~O. 90-12 is $382,105.00. This change order to date would 1ncrease the contract amount by $8,452.63 or 2.2% of the initial contract amount. The project is approximately 70% complete with the remaining work scheduled to be completed in the 1991 construction season. "'''';1An ., "'1Iin;,4~;t (6188) stATE 01' MINNE80TA DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL AGREEMENT No. Supp. to eon'reet No._ 1 CofttnIoIor: Brown & Cris, Inc. F.... PI'OfOC1: Sheet} _ o,L 8IMt PIOj8ct No.: 201-113-01 AddIeM: East Frontage Road of 1-35 19740 Kenrick Avenue Lakeville, MN 55044 LOCUion; Vine Street, Tower Street, and Toronto Avenue between CSAH 23 and CSAH 39 AcCO\lnl 1.0. DlpcJI)N, c.co.a c.co.' C.CO.1 TYPe OF MO ( TRANSACTION: A44 ( ) M1( ) )A45( )A48( Dated _ Number Entered by Entered by ) Oated _ . _ Number ThIs contract It amended It follow.: See Attached WHEREAS: This contract provides, among other things, for the installation of lightweight fill (shredded tires) over swamp deposits, as detailed in the Plans and Specifications. WHEREAS: The Prior Lake/Spring Lake Watershed District requested that wood chip lightweight fill be placed below elevation 945.0 to keep the shredded tire lightweight fill above the adjacent pond water elevation. WHEREAS: In the opinion of the Engineer and Director ot the Watershed District, approximately 175 cubic yards of wood chip lightweight fill will be needed to be placed under the shredded tires. NOW THEREFORE, IT IS HEREBY MUTUALLY UNDERSTOOD AND AGREED THAT: 1. The contractor shall furnish all labor and equipment as necessary to install wood chip lightweight fill on this project. 2. Payment shall be to place wood chips left on site in the lightweight fill area - a lump sum bid price of $1,000.00. 3. Furnish and install wood chips in the lightweight fill area for the price of $15.00 per cubic yard, vehicle measure. ESTIMATE OF COST 1. Lump sum labor and equipment of installing wood chips on site _ $1,000.00 t, 2. 250 C.Y. (vehicle measure) at $15.00/C.Y. MUNICIPAL STATE AID PARTICIPATION REQUESTED Regular Account TOTAL - $3,750.00 $4,750.00 c APPROVED: CommIssioner of ~mlni6tratk)n APPROVEO: Commilitoner of Finance Original Contract ., By ApprOVed .. to form and execution OM_ DeteeL. . Astl...", AllDrMy GIniriI - OTlglnallo Statl Auditor - Copy to Agency