HomeMy WebLinkAbout8C -Library/Resource Center Change Order #3
STAFF AGENDA REPORT
AGENDA ITEM:
AUGUST 16, 1999
8C
PAUL HOKENESS, PARKS AND RECREATION DIRECTOR
BRET WOODSON, ASSISTANT CITY MANAGER
CONSIDER APPROVAL OF CHANGE ORDER #3 FOR
FULCO CONSTRUCTION FOR THE LmRARY/RESOURCE
CENTER
MEETING DATE:
AGENDA NUMBER:
PREP ARED BY:
DISCUSSION:
Historv
On September 8, 1998 the City Council awarded Fulco Construction a
contract in the amount of $1,960,300.00 to construct the Prior Lake
Library/Resource Center. To date the City Council has approved two
change orders. On February 16, 1999 the City Council approved
Change Order #1 for an addition to the contract of $5,957.00 and on
March 1, 1999 the Council approved Change Order #2 for the
purchase of pre-cast concrete in the amount of $28,442.90.
Change Order #3 includes eight items which the Architect discussed
with the Council at the July 6th worksession. Item #9 on the Change
Order is an additional item, which the Council did not discuss on July..
6th.
Current Circumstances
The Library/Resource Center is very close to completion. The
Architect is still negotiating two items: Hardware and window
opening masonry. These two items mayor may not be a Change
Order. Below are listed the nine items that the Architect has agreed to
as legitimate. As a side note we have been fortunate to have Kirby
Thompson as the Construction Superintendent on the job. Kirby has
worked closely with the sub-contractors and helped us avoid items
that could have potentially been change order items.
Nine items are included in this change order:
1. Window shade price increase. There was an industry increase
in the cost of the window shades. The Architect thought that we
could save some money by decreasing the number of window
shades. By delaying the purchase of the shades we got caught in
a price increase. Add $784.00
2. Fire and smoke damper wiring. This item was not included in
the original plans and is a Building Code requirement. Add
$1,285.00
16200 ~el~~~9\ve. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
~,~
<:
~.
3. Gypsum board covering of plenum plywood. There was
exposed plywood in the return air plenum which needed to be
covered by sheetrock for fire protection purposes. This is a
Building Code requirement. Add $4,980.00
4. Louver changes. Apparently the louver manufacturer felt that
there was not enough detail provided on the louver drawings and
the louvers would cost more than originally thought. Fulco
requested an additional $1,624.00. This was one item that the
Council was very concerned about at the worksession. Barry was
able to reduce this amount to $765.00. Add $765.00
5. Wood batten supports for Resource Center ceiling. These
wooden battens help support the insulation and plastic vapor
barrier on the ceiling. This is a Building Code requirement. Add
$1,313.00
6. Coffee shop sink plumbing. The plans did not include rough in
plumbing for the coffee shop sink. This was discovered by staff
and was included before the walls were finished and floor
poured. This would have had to be done later and would have
resulted in retrofitting and additional costs. Add $1,178.00
7. Parking lot lighting. The number of fixtures had to be increased
to provide additional lighting for safety reasons. Add $1,854.00
8. Fire damper valve access panels. The plans did not include the
access doors for the fire damper valves. This is a Building Code
requirement. Add $955.00
9. Raise condenser screen wall. In Change Order # 1 we received a
$507.00 deduct as a result of decreasing the length of the wall
which screens the exterior mechanical equipment. During
construction and following the delivery of the condenser units it
was discovered that these units had a larger fan housing and were
taller than expected. According to our City Code these outdoor
units have to be screened and not be seen from the street. Though
the wall was shortened we were required to raise it two courses of
block which resulted in added labor and materials. Add $1,500.00
Change Order number 3 adds $14,614.00 to the Fulco contract which
would bring the contract total to $2,009,314.00.
Conclusion
The Architects narrative describing the change orders is included for
council information.
ISSUES:
The council should determine if it concurs with the change order as
outlined in this staff report. We previously advised the Council of
eight of the nine changes at the July 6th worksession. Item #9, (the
height of the screen wall) had not been determined as a Change Order
item prior to the July 6th meeting. The Contractor had not advised the
Architect as to this Change Order item.
CHGLIB#3.DOC
FINANCIAL IMPACT:
ALTERNATIVES:
RECOMMENDATION
MOTION:
REVIEWED BY:
CHGLIB#3.DOC
As a result of change otBer #3 we are currently $73,275.00 or (2.9%)
over the original budget amount of $2.5 million. (budget attached)
1. Approve Change Order #3 for Fulco Construction in the amount
of$14,614.00.
2. Table this Agenda item for a specific reason.
3. Deny this Agenda item for a specific reason.
Motion and second to approve Change Order #3 in the amount of
$14,614.00 increasin he total Fulco Construction contract amount to
$2, 09,31 .00
Prior Lake Public Libr~ry and Resource Center
Meyer Scherer lie Rockcasde, LId. Archilecls
Projecl Budgel 07/26/99
Projecl Scope
T olal Gross Area of Building
hems for AlIocalion
Bid Package One: Soils Correclion and Ulilily Relocalions
Conlingency, drop 10 zero
Sublolal
Bid Package Two: General Conslruclion
Comingency; none
Sublolal
Wood dance floors@ 6.25 per sf PACKAGE THREE
Millwork PACKAGE TIIREE
Carpel @ 20.73 per sy fob job sile purchased direcl
Bid Package Three: Miscellaneous
Conlingency @ 0
Sublolal
Mirrors BID SEPERA TEL Y BY OWNER
SecurilY BID SEPERATEL Y BY OWNER
Phone BID SEPERATELY BY OWNER
Signage BID SEPERATEL Y BY OWNER
Landscaping BID SEPERA TEL Y BY OWNER
Dance Barre BID SEPERATEL Y BY OWNER
Bid Seperalely by Owner
Conlingency @ 0
Sublolal
Grand TOlal Consrruclion
General Furniture lCiIY pOrlion only)
Reimbursibles
Professional Fees
Minnegascu land
Cap Well
Remove Slreel Lighls
Adverlisemenl
Conslruclion Sign
Dumpsler for Old Gas Building
Conslruclion Tesling and Surveys
Move calch basins
New Fill for Sile
Sublolal Non Conslruclion COSIS
Sublolal Currenl Projecl COSI Porjeclion
Change Order No 1
Excavalion Silework Change Order for Cily work
Change Order No 2 Casl Slone by Owner/Fulco
Change Order No 3 see ilems below
Shades, price increase
Conneclion of fire + smoke dampers
Addilional Gyp board f,?r fire raling
Louvers
Wood balren supporling vapor barrier
Plumbing for fUlure coffee shop sink
Parking 101lighling
Screen wall fur Chillers
Access pnls fur plumbing shlll-offs
TOlal ChanRes
TOlal Currenl Projecl COSI Projeclion
Projecl Budgel
Amounl Over Budgel
md(lrujcI.:upriorlakl112 l-bl'JHOJf8S. wk4
19,955
""
Increased from 19,850 on 7/26/99
Amounl NOles
$110,000 ConlraCI amI
$0
$110,000 Com leled
$1,960,300 Conlracl amI
$0
$1,960,300
$22,834 Comracl amI
$86,000
$30,805 Conlracl amI
$139,639 Bid 6115/99
$0
$139,639
1
$2,940
$0
$3,182
$9,500
$18,400
$1,260
$35,282
$0
$35,282
$2,245,2211
$3,000
$9,500
$207,000
$1,650
$1,030
$1,020
$293
$543
$280
$15,475
$2,470
$17,376
$259637
$2 504 8581
$5,957
$19,403
$28,443
1
$784
$1,285
$4,980
$765
$1,313
$1,178
$1,8H
$1,500
$955
$68,417
$2,573,275 I
$2,500:000
$73 275 I
Bid 5/99
s.f. COSI
aClual
s.f. COSI
s.f. COSI
s.f. C051
% over
budgel 28,S 12
Original budgel was 36,700
$4,500 on 7-1-99 budgel
$ 112.51
$13.ot
$125.53
$128.95
0.029
27 July, 1999
Frank Boyles
City Manager
Prior Lake City Hall
16200 Eagle Creek Ave SE
Prior Lake, Minnesota 55372
Dear Frank:
We've completed Change Order #3 for the Council review and approval.
Following the direction of the July 6rh workshop, I've attempted to trim dollars
on several items. The gypsum board required to cover the exposed wood within
the plenum spaces dropped from $5,368 to $4,980. The Millwork was reduced
from $91,900 to $86,000. Fulco Construction also agreed to reduce the Louver
increase from $1,624 to $765.
As you requested, we are trying to anticipate other cost changes. This week
Fulco raised three issues with potential dollar impacts. One request is from the
hardware supplier. I recall no changes in his work so I have no idea why he
wants more money. Fulco is sending a detailed explanation (request approx
$1,300). The second request is from the brick mason regarding the cost for
deleted windows (request appro x $900). I need more info on this as well. The
third issue is also from the brick mason requesting $1,500 for increasing the
height of the chiller screen wall. I've discussed this with Fulco and the amount
appears accurate. I've included the add on C.O. #3.
With respect to the sales tax issue, all sales taxes from the subcontractors and
vendors to Fulco were excluded in the original base bid. The money saved as a
result of the sales tax exemptions was accounted for in our original budget.
Also there are no sale taxes on the work in Change Orders 1 through 3.
I've 0 attached an new Project Budget dated 07/26/99. We are $73,275
(2. Yo). udget. Obviously the Millwork miscue greatly impacted this
nu b .
dJproj ectlpriorlk/9 8 031 t 15 .doc
.
. ~ -- .
:... -,..J
I-.---~
I AI'r' - ~ lC,Cg I
I v\J V 1.......J
I
i J
~:..:;~O .r<~_~~~~~.:n I
Change Order
Project:
Prior Lake Public Library
Prior Lake, Minnesota
Owner . .
Architect .
Contractor .
Field 0
Others 0
Change Order Number: 3
Date: 27 July 1999
To Contractor: Fulco Construction
123 Columbia Court North
Chaska, Minnesota 55318
Architect's Project No.: 9803
Contract Date: 27 February 1998
Contract For:
General Construction
The Contract is changed as follows:
Item #1
Item #2
Item #3
Item #4
Item #5
Item #6
Item #7
Item #8
Item #9
Window shade price increase
Fire and smoke damper wiring
Gyp Bd cover of plenum plywood
Louver changes
Wood batten supports for Resource Center V.B.
Coffee Shop sink plumbing
Parking lot lighting
Fire damper valve access panels
Raise condenser screen wall
Add
Add
Add
Add
Add
Add
Add
Add
Add
Attachments: See attached explanations.
784
1,285
4,980
765
1,313
1,178
1,854
955
1,500
Not valid until signed by the Owner, Architect and Contractor
The original Contract S urn was ..................................................................................................... $ 1,960,300
Net Change by previously authorized Change Orders ........................................................................ $ 34,400
The Contract Sum prior to this Change Order was ....................................................................... $ 1,994,700
The Contract Sum will be increased decreased by this Change Order in the amount of ...................$ 14,614
The new Contract Sum including this Change Order will be ........................................................$ 2,009,314
The Contract Time will be unchanged by .............................................................................................. 0 Days
The date of Substantial Completion as of the date of this Change Order therefore is ....... 01 September 1999
By.
Contractor
Owner
Fulco Construction
123 Columbia Court North
Chaska, Minnesota 55318
BY~ ~w.
Date ~G ~I q,
City of Prior Lake
16200 Eagle Creek Ave SE
Prior Lake, MN 55372
By
Date
-.
Prior Lake Public Libr~ry and Resource Center
Meyer Scherer & Rockcastle, Ltd. Architects
Project Budget 07/26/99
Project Scope
Total Gross Area of Building
19,955 Increased from 19,850 on 7/26/99
Amount Notes
$110,000 Contract amt
$0
$110,000 Com leted
$1,960,300 Contract amt
$0
$1,960,300
$22,834 Contract amt budget 28,S 12
$86,000 Original budget was 36,700
$30,805 Contract amt
$139,639 Bid 6/15/99
$0
$139,639
$2,940
$0
$3,182 $4,500 on 7-1-99 bu~get
$9,500
$18,400
$1,260
$35,282 Bid 5/99
$0
$35 282
$2,245,2211 s.f. cost $112.51
$3,000
$9,500
$207,000
$1,650
$1,030
$1,020
$293
$543
$280
$15,475
$2,470
$17,376 actual
$259637 s.f. cost $13.01
$2 504 8581 s.f. cost $125.53
$5,957
$19,403
$28,443
$784
$1,285
$4,980
$765
$1,313
$1,178
$1,854
$1,500
$955
$68,417
$2,573,275 I s.f. cost $128.95
$2,500:000 % oyer 0.029
$73 275 I
Items for Allocation
Bid Package One: Soils Correction and Utility Relocations
Contingency, drop to zero
Subtotal
Bid Package Two: General Construction
Contingency; none
Subtotal
Wood dance floors @ 6.25 per sf PACKAGE THREE
Millwork PACKAGE THREE
Carpet@ 20.73 per sy fob job site purchased direct
Bid Package Three: Miscellaneous
Contingency @ 0
Subtotal
Mirrors BID SEPERA TEL Y BY OWNER
Security BID SEPERA TEL Y BY OWNER
Phone BID SEPERA TEL Y BY OWNER
Signage BID SEPERATEL Y BY OWNER
Landscaping BID SEPERA TEL Y BY OWNER
Dance Barre BID SEPERATEL Y BY OWNER
Bid Seperately by Owner
Contingency @ 0
Subtotal
Grand Total Construction I
General Furniture (City portion only)
Reimbursibles
Professional Fees
Minnegascu Land
Cap Well
Remoye Street Lights
Adyertisement
Construction Sign
Dumpster for Old Gas Building
Construction Testing and Surveys
Move catch basins
New Fill for Site
Subtotal Non Construction COSlS
Subtotal Current Project Cost Porjection I
Change Order No 1
Excavation Sitework Change Order for City work
Change Order No 2 Cast Stone by Owner/Fulco
Change Order No 3 see items below
Shades, price increase
Connection of fire + smoke dampers
Additional Gyp board fl." fire rating
Louvers
Wood banen supporting vapor barrier
Plumbing for future coffee shop sink
Parking lot lighting
Screen wall for Chillers
Access pnls for plulIlhing shut.offs
Total Chanl!es
Total Current Project Cost Projection I
Project Budget
Amount Over Budget
ncrlprujl.:t.:upriorlake/121-bl\JH03f8.i. wk4
,..""~,.J",,c,',.'_'I~ ...,,~_,
-
-
.~.,(o\ialllil~r..
.tr..;,_,:~~:;J.",.