CITY COUNCIL AGENDA REPORT
DATE:
AGENDA #:
PREPARED BY:
REVIEWED BY:
SUBJECT:
SEPTEMBER 20, 1999
SA
SUE MCDERMOTT, ASSISTANT CITY ENGINEER
GREG ILKKA, CITY ENGINEER
CONSIDER APPROVAL OF CHANGE ORDER NO. 1 TO
THE CONTRACT FOR THE 1999 IMPROVEMENT
PROJECT, #99-02.
DISCUSSION:
HISTORY
Project #99-02 is the lift station renovation project included
in the 1999 public improvements through a contract with
Braun Pump and Controls of New Prague, MN.
The project consists of rehabilitation of three existing duplex
submersible grinder pump lift stations. The work will vary
somewhat at each location, but in general consists of
replacing the upper portion of wet well, replacement of
piping and wiring in the wet well, new pumps, new control
panels, and site restoration.
This project was originally bid as a part of the Candy
Cove/Lakeside Manor Street Improvement project. The bids
were rejected due the high cost of the lift station
renovations. Council directed staff to readvertise the lift
station renovations as a separate project.
The force main and valve manhole installation required for
lift station #12 remain in the Candy Covel Lakeside Manor
project which was awarded to Northwest Asphalt, Inc. The
existing forcemain will be removed during the proposed
forcemain installation requiring bypass pumping in order to
maintain sanitary sewer service to 35 homes during this
construction. In separating the two projects, the bypass
pumping was not addressed in the street reconstruction
contract.
162(ill&;gglg Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
CURRENT CIRCUMSTANCES
Northwest Asphalt is proposing to complete the forcemain
and valve manhole construction in September. This work will
be coordinated with Braun Pump and Controls for the lift
station #12 renovations.
Braun Pump and Controls' proposal for the bypass pumping
totals $2,500.00. Staff has reviewed this proposal, agrees it
is fair and equitable, and recommends approval.
CONCLUSION
Bypass pumping during forcemain installation is necessary
to maintain sanitary sewer service for approximately 35
homes.
FINANCIAL IMPACT: The original contract was $117,800.00. This change order is
approximately 2% of the original contract. Funding for this
change order is proposed to be from the Trunk Reserve fund
due to the fact the extra work was required in conjunction
with the lift station renovations.
ALTERNATIVES: The alternatives are:
1. Approve Change Order No.1.
2. Deny this item for a specific reason and provide staff with
direction.
3. Table this item until some date in the future.
RECOMMENDED
MOTION:
A motion and second approving Change Order No. 1 to the
Lift Station Renovations Project #99-02, funded through the
Trunk Reserve fund.
REVIEWED BY:
REVIEWED BY:
LIFTCOI.DOC
o 0
BRAUN ,PUMP &CQN:TROLS, INC
oRR4BOX474
o NEW PRAGUE,. MNS06071'
612-758-66000
t~~~;,~ ':~..~~~;~\;~~}'l2:~:
SEP 1 0 1999
September 9~ 1999 0
SUe o McDermott '0,
City of Prior 'Lake 0 '0
16200 Eagle Creek Ave .
Prior Lake, MN 5~}72.,.1787 0 '
Dear SlJ,e, ,
Weare pleased to offer this quote f?r the obypass for Li~ Station # 13,oPioj~ct No 99-02.
Pricing is as follows. ' ,
OLift Station Bypass 0 0
$2,5()O~OO
o 0
o If you havean~ questions please Ogiveme a'calLTh,ank you. 0
Sincerely, :
~~a.u1~L .
.Dave Braun 0 (jJ 0,' 0'
o DB/sr
.. :
. .... . ".'.
, - ~,,'::
CHANGE ORDER
CITY OF PRIOR LAKE
16200 EAGLE CREEK AVENUE SE
PRIOR LAKE, MN 55372
CHANGE ORDER NO.1
TO:
Braun Pump & Controls
RR 4, Box 474
New Prague, MN 56071
DATE: September 20, 1999
FOR:
Project No. 99-02, Lift Station Renovations
OWNER:
City of Prior Lake
You are hereby directed to make the following change to your contract dated July 19. 1999. The
change and the work affected thereby is subject to all contract stipulations and covenants. This
Change Order will increase the contract sum by:
Two-Thousand-Five-Hundred and Non 00 Dollars ($2.500.00)
Add the following:
Item Description Unit Ouantitv Unit Price Amount
1. Bypass Pumping LS 1 $2,500.00 $ 2,500.00
Total Additions $ 2,500.00
Amount of Original Contract
117.800.00
Change Order No. 1
$
$
$
2.500.00
Revised Contract Amount
120.300.00
Contract time is not affected by this change.
APPROVALS:
Approved: City of Prior Lake
Owner
Approved: Braun Pump & Controls
By
By
Mayor
Date
Date
By
Title
City Manager
Date
G:\PROJECTS\I999\02LIFTS\CO I.DOC