Loading...
HomeMy WebLinkAbout8B - Librayr/Resource Center Change Orders STAFF AGENDA REPORT MEETING DATE: AGENDA NUMBER: PREPARED BY: AGENDA ITEM: . FEBRUARY 16, 1999 8B (1) AND (2) PAUL HOKENESS, PARKS AND RECREATION DIRECTOR CONSIDER APPROVAL OF CHANGE ORDERS FOR THE LIBRARY/RESOURCE CENTER: (1) LLOYD EXCAVATION INC. FOR SOIL CORRECTIONS, STORM SEWER PIPE, AND WATER MAIN. (2) FULCO CONSTRUCTION FOR FOOTING MODIFICATION, ELIMINATION OF PARKING LOT, ELIMINATING BLOCK WALL, REDESIGN OF EXTERIOR SCREEN WALL, AND LIGHTING MODIFICATIONS. DISCUSSION: History On September 8, 1998 the City Council awarded Fulco Construction a contract in the amount of $l ,980,300.00 to construct the Prior Lake Library/Resource Center. On that same date a separate contract in the amount of $ll 0,000.00 was entered into with Lloyd Excavating Inc. to do soil correction work. Current Circumstances 1. Change Order For Lloyd Excavating Inc. For Soil Corrections Soil borings were taken in sixteen locations on the site so we could estimate the amount of excavation, fill, and compaction needed to budget for the project. During excavation we found a pocket of unsuitable soils which required six feet of additional removal and fill. This area was located primarily along the northern edge of the building. Based upon their original unit bid price of $8.50 per cubic yard of unsuitable soil removed and the same amount for compacted granular fill Lloyds Excavation Inc. would be entitled to $38,862.00 for 2,286 cubic yards removed and replaced. We have negotiated a reduction. Lloyd Excavation Inc. has agreed to accept $5.10 per cubic yard for removal and the same change for replacement with compacted fill. (i.e. $5.10 cubic yards + $5.10 cubic yards x 2,286 cubic yards.) The total addition using the reduced figure is $23,317.20 . CHNGLIBR.DOC 16200 Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER . ... .' As part of this change order the city received credit for the relocation of the'vaterline which feeds the building. 162 feet of pipe was eliminated at a savings of$l,l63.l4. Due to the elimination of the small parking lot on the east side of the building we were able to eliminated l23 feet of storm sewer pipe, one casting and one catch basin for a credit of$2,752.00. This change order including additions and deductions is $l9,402.06 which results in a total contract of $l29,402.06. This completes the contract with Lloyd Excavation for demolition, excavation, and moving of utilities. Attached is the change order which describes work done. 2. Change Order For Fulco Construction For Various Items. Five various items are included in this change order: I. A 24 foot bearing wall was eliminated in the resource room area by increasing the beam size. The deduct is $1,000.00 2. The removal of the smallest side parking lot (11 stall) also saves money in bituminous and sidewalk. The deduct is $5,l23.00. 3. Redesigned lighting in the Resource Center, library staff area, and outside. Total deduct is $3,900.00 4. Reduction in length of exterior screen wall for condensers, transformers, and meters. Total deduct of$507.00. 5. Modification of footing around the sewer pipe which serves the new building as well as the old library and Prudential building. The add for this work was $16,487.00. Including all adds and deducts this change order adds $5,957.00 to the contract price. The new contract amount is $1,986,257.00 Conclusion The narratives describing the change orders are included for council information. The major areas of additional cost were subsurface work. Our expectation is that remainder of the project will be more predictable. We will work to save the $25,359.06 which has been added to the Library/Resource Center cost as a result of these change orders. We will not, however, recommend change orders which in our opinion degrade the quality, durability, usability, or maintainability of the facility. CHNGLIBR.DOC ISSUES: ALTERNATIVES: RECOMMENDATION MOTION: REVIEWED BY: CHNGLIBR.DOC The council should determine if it concurs with the change orders as outlined in this staff report rec;ognizing that both the soil corrections, sewer, water, and footing work have been completed to avoid project delay penalties. We did previously advise the council' of these changes through the City Manager's update memorandum. 1. Approve a Change Order for Lloyd Excavation Inc. in the amount of $l9,402.06 as well as Change Order # 1 for Fulco Construction in . the amount of $5,957.00. 2. Table this Agenda item for a specific reason. 3. Deny this Agenda item for a specific reason. pprove a Change Order for Lloyd Excavation # 1 for Fulco Construction LLOYD EXCAVATING INC. CHANGE ORDER 7750 175th Street E Prior Lake,MN 55372 ~> PH:612-440-3020 Fax:612-440-3036 DATE CHANGE OR... "> 12/31/98 ~- 2064 BILL TO City of Prior Lake 16200 Eagle Creek Ave SE prior Lake MN 55372 P.O. NO. TERMS PROJECT 276-Site Work DESCRIPTION QTY RATE AMOUNT Unit Price #1 2,286 5.10 11,658.60 Unit Price #2 2,286 5.10 11,658.60 Credit For Water Main -1,163.14 -1,163.14 Credit For Stonn Sewer -2,752.00 -2,752.00 (see reverse side for complete description of each) - Total $19,402.06 -, LLOYD EXCA V A TINe INC. 7750 175th Street East Prior I.,ake MN 55372-9313 Phone 612~440-3020 Fax 612-440-3036, Discription of Work Additional work completed Unit Price # 1 Soil corrections necessary to achieve satisfactory compaction. It was necessnry to excavate an additional six toot in depth along the Northern edge of the excavation area due to poor soils. This pocket of poor soils started at the middle of the excavation area and continued to the East for appro~imately 100 ft. The additional excavation depths varied alung the vein of poor materials. The quantity of additional soils that needed correcting was 2,286 cubic yards. Removal costs at 55.10 per cubic yard equals 511,658.60. Unit Price # 2 The same quantity was replaced with 2,286 cubic yards of compact able sojJs. Installntion Rnd compactIon costs at $5.10 per cubIc yard equals 511,658.60. Tob,1 add for soil corrections equals $23,317.20 Credits Credit # J There is a credit for relocation of the main water line which feeds the building. By rerouting the water line into the south side of the building rather than the north side we were ahlc to eliminate ] 62 feet of pipe. This aMounts to a credit 0($1,163.14 Credit # 2 With elimination of the small parking loton the cast side of the building We were able to eliminate 123 feet of storm sewer pipe, bne casting, and one catch basin. , This amounts to a credit of $2,752"00. Tolul add Total deduct $23,3 J 7.20 -$ 3,915.14 Toral amount owed 519,402.06 Challge Order Owner . Architect . Contractor . Field C Others n Project: Prior Lake Public Library Prior Lake, Minnesota Change Order Number: 1 Date: 05 February 1999 To Contractor: Fulco Construction 123 Columbia Court North Chaska, Minnesota 55318 Architect's Project No.: 9803 Contract Date: 27 February 1998 Contract For: General Construction The Contract is changed as follows: 1. 2. 3. 4 5 PR#1 PR#2 PR#3 PR#4 PR#5 Eliminate interior block bearing waiL Reconfigure parking lot. Delete six interior lights and modify street lighting. Additional excavation and foundation work to avoid sewer line Reduce the size of the exterior masonry screen wall Deduct Deduct Deduct Add Deduct $1,000.00 $5,123.00 $3,900.00 $16,487.00 $507.00 Attachments: See explanations for the five changes. Not vaEd until signed by the Owner, Architect and Contractor The original Contract Sum was ......................................... .................................. .......... ......... ........ $1,980,300 Net Change by previously authorized Change Orders ..................................................................................$0 The Co:1tract Sum prior to this Change Order was ........................................................................$1,980,300 The Contract Sum will be increased decreased by this Change Order in the amount of .......................$5,957 The new Contract Sum including this Change Order will be .........................................................$1,986,257 The Contract Time will be unchanged by ...............................................................................................0 Days The date of Substantial Completion as of the date of this Change Order therefore is ...... 01 September 1999 Architect Contractor Owner Meyer, Scherer & Rockcastle, Ltd. 119 North Second Street Minneapolis, MN 55401 Fulco Construction 123 Columbia Court North Chaska, Minnesota 55318 City of Prior Lake 16200 Eagle Creek Ave SE Prior Lake, MN 55372 By By By Date Date Date '--:> M S & R Arc hit ec t s .~ PRIOR:..AKE LIBRARY PROJECT NUMBER- 9803 February 3, 1999 PROPOSAL REQUEST # 1 DESCRIPTION OF WORK: Delete the concrete block bearing wall along the north side of the Men's Toilet Room 122. Replace with 6" metal framing and gyp bd. Modify the weight of the Steel beam along grid E to accept the additional load originally carried by the block wall. QUAN'mIES OF WORK: Length of the wall is approx 24 ft. Height of the wall is approx 8 ft 8 inches. The beam wfight increased by 10 pounds per ft. JUSTIFICATION FOR NECESSITY OF WORK: We were able to clear span the west end of the Resource Room thus the block bearing wall could be eliminated. TOTA"LCOST: Df~duct: $ 1000.00 TIME EXTENSION: o days ____ _Equ:i(appo,:",unity .~layer -, - M S & R Arc hit e c't s .~ PRIOR IJAKE LIBRARY PROJECT NUMBER- 9803 February 3, 1999 PROPOSAL REQUEST # 2 '. DESCRIPTION OF WORK: Re~,ise the parking lot configuration. QUANTITIES OF WORK: Eliminate approx 2,300 sf of bituminous paving and 306 sq ft of sidewalk. JUSTIFICATION FOR NECESSITY OF WORK:. . . We. were able to eliminate the east parking lot and regain parking long the street for a net loss of one space. This' move also eliminated the need for the adjacent sidewalk. The redesign also allows more flexibility for future development between the new Resource Center and the existing library. TOTAL COST: Deduct: $ 5,123.00 TIME MTENSION: o ..1 a ys Equal OpportUnity Employer . :-.... -, -, MS&R Architec'ts PRIOR LAKE LIBRARY PROJECT NUMBER- 9803 February 3, 1999 PROPOSAL REQUEST # 3 '. DESCRIPTION OF WORK: Delete several interior light fixtures. Delete one street light fixture and reduce the quality of the: new street fixtures. QUANrmES OF WORK: Eliminated five down lights in the Resource Center and two fluorescent lights in the Staff area. Eliminated one parking lot light fixture and change the balance of the lights to a lesser quality street light.. . JUSTIFICA nON FOR NECESSITY OF WORK: These modifications were necessary to cut cost from the building in order to get us back to th.;: original budget. The street lighting was downgraded knowing that there are pending planning strategies for significant streetscape improvements throughout the downtown area. We did not want to spend money on quality fixtures that would be replaced within a few years. TOTAL COST: D-:duct: $ 3,900.00 TIME EXTENSION: o days EqJUJl Opportunity Employt:r PRIOR LAKE LmRARY PROJECT NUMBER- 9803 February 5, 1999 PROPOSAL REQUEST # 4 - MS&R Architects DESCRlPTION OF WORK: Deepen the foundation and increase the footing size along the north side of the library. QUANTITIES OF WORK: 560 sf of additional concrete block work ( approx 640 blocks) and 14 cubic yards of additional concrete for the footings. . JUSTIFICATION FOR NECESSITY OF WORK: The new sewer line was installed as far north as possible while maintaining the minimum. slope required for gravity drainage. We had hoped that the building would be able to stay far enough away from the sewer line to avoid deeper footings and related excavation. Also th..~ sewer is required to stay outside the foot print of the library except for the service line needed specifically for the building. We also shifted the building as close to the County road right-of-way as possible. Unfortunately the northern edge building laid out tOO tight to the. sewer pipe thus requiring us to drop the foundations below the pipe and increase the footing size. TOTAL COST: Add: $ 16,487.00 TIME EXTENSION: .0 days Equal Opportunity Employ~7' -----Tr- .. M S & R Arc hit e c t.~ PRIOR LAKE liBRARY PROJECT NUMBER- 9803 February 3, 1999 PROPOSAL REQUEST # 5 DESCRIPTION OF WORK: Re:luce the length of masonry exterior screen wall on the east side of the Resource Center. QUAN'TITlES OF WORK: shortened 10 feet. JUSTIFlCATION FORNECESSITY OF WORK: Originally a gas meter and valve was to be located behind the screen ~long with two cO::1densers and the transformer. The meter was reinstalled off-site .to the north allowing us to reduce the length of the wall. TOTAL COST: Deduct: $ 507.00 TIME EXTENSION: o days Equ,zl Opportunity Emplayllr