Loading...
HomeMy WebLinkAbout9C - Lakefront Park Budget MEETING DATE: AGENDA NUMBER: PREPARED BY: AGENDA ITEM: DISCUSSION: STAFF AGENDA REPORT APRIL 19, 1999 9C PAUL HOKENESS, PARKS AND RECREATION DIRECTOR AND BRET WOODSON, ASSISTANT CITY MANAGER CONSIDER APPROVAL OF RESOLUTION 99-"'-APPROVING THE LAKEFRONT PARK BUDGET AND" AUTHORIZING EXPENDITURES FOR THE PROJECT 28- History The total budget for the Lakefront Park Improvement project is $2,744,002.50 with $2.5 million coming from Referendum proceeds (Budget sheet attached). At the April 5, 1999 meeting the City Council authorized the award of bid to Ingram Excavation, Inc. for the construction of a portion of Lakefront Park improvements in the amount of $1,377,052.50. At the March 15, 1999 meeting the City Council separately authorized the advertisement of bids for the Pavilion at Lakefront Park. The bids for the Pavilion will be opened on April 20, 1999 and staff will return to the Council on May 3, 1999 to award the Pavilion bid. The estimate for the Pavilion is $425,000.00. Current Circumstances (1) Miscellaneous Items: As part of the Lakefront Park improvement project staff will be assuming some of the responsibilities for the project, such as the seeding and boardwalk installation. Accordingly, there are a number of miscellaneous expenditures and purchases which will be necessary to complete the project. Staff is requesting Council authorization to expend an amount not to exceed $194,200 of the Referendum proceeds to purchase (including labor) the items included on the attached budget sheet listed as "Miscellaneous Items". This work will require the acquisition of numerous supplies and products including: seed, boardwalk, concession equipment, benches, picnic tables, trashers, trees, shrubs, and other lesser miscellaneous items estimated to cost approximately $194,200.00 (attached is an itemized list of the various supplies and products). Many of these items were purposely left out of the contract knowing that we would be able to purchase these materials and products at a substantial savings, and avoid the typical contractor mark-up. (2) Non-Construction Costs: In addition to the expenditures categorized as "Miscellaneous Items", there are various professional services which are not included in the Ingram contract which the City 16200 ~1~P~R9\Ve. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER ALTERNATIVES: RECOMMENDATION MOTION: REVIEWED BY: LKFTBUDG.DOC will be responsible for. These professional services include survey work, inspections, engineering, and testing. Our estimates for the various professional services is $75,000.00. Conclusion With any and all of these expenditures staff will follow the City purchasing guidelines and state statute. Attached is a budget. It is staff's intention to stay within this budget. 1. Approve Resolution 99-XX approving the Lakefront Park budget and authorize the expenditures for the project. 2. Table this item for a specific reason. 3. Deny this item for a specific reason. Staff recommends Alternative number 1. Motion and second to approve the Lakefront Park budget and authorize the expenditures for the project. RESOLUTION 99-XX RESOLUTION APPROVING THE LAKEFRONT PARK BUDGET AND AUTHORIZING EXPENDITURES FOR THE PROJECT WHEREAS, WHEREAS, WHEREAS, WHEREAS, WHEREAS, WHEREAS, MOTION BY: SECOND BY: at their April 5, 1999 meeting the City Council authorized the award of bids to Ingram Excavation, Inc. for the Lakefront Park improvements in the amount of $1,377,052.50; and at their March 15, 1999 meeting the City Council authorized the advertisement of bids for the Pavilion at Lakefront Park; and the City Council authorized Staff to assume improvement project responsibilities outside the Ingram contract, such as seeding, boardwalk installation and other miscellaneous items; and Staff be responsible for obtaining various professional services including but not limited to survey work, inspections, engineering and testing with an estimated cost of $75,000; and the project will also require the acquisition of numerous supplies and products including but not limited to seed, concrete, boardwalk materials, concession equipment, benches, picnic tables, trashers, trees, shrubs and miscellaneous other items at an estimated cost of $194,200; all acquisitions will conform with the City purchasing guidelines and state statute. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, as follows: 1. The Lakefront Park Budget as submitted is approved. 2. The Staff is authorized to expend up to $194,200 to acquire various supplies and products required for the Lakefront Park project. 3. The Staff is authorized to expend up to $75,000 to obtain various professional services required to complete Lakefront Park. 4. All purchases will be in conformance with City Purchasing Policy and state statute. 16200 t:~~P&R%e. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER Passed and adopted this 19th day of April, 1999. YES NO Mader Mader Kedrowski Kedrowski Schenck Schenck Petersen Petersen Wuellner Wuellner {Seal} City Manager City of Prior Lake LKFRBUDG.DOC LAKEFRONT PARK IMPROVEMENT PROJECT BUDGET ITEMS APPROVED BY CITY COUNCIL Land Acquisition: Kop Farm ($550,000) 550,000.00 ($375,000 from Ref., $125.000 from Const. Fund. & $50,000 Grant) Gen. Improv. Contract: Ingram Construction ($1,377,052.50) ($1,308,050 from Ref. & $69,002.50 from Trunk Res.) 1,377,052.50 Non-Construction Costs: Brauer & Associates Contract ($122,750) 122,750.00 TOTAL OF APPROVED ITEMS: 2,049,802.50 ITEMS YET TO BE APPROVED (To be considered bv City Council on 4/19 and / or 5/3) Pavillion Construction: Pavillion and amenities 425,000.00 Miscellaneous Items: In-House work, seeding, supplies, boardwalk, other amenities, etc. 194,200.00 Non-Construction Costs: Misc. Consulting and Eng. Services 75,000.00 TOTAL OF REMAINING ITEMS: 694,200.00 ESTIMATED TOTAL PROJECT COST: 2,744,002.50 Referendum Proceeds: Construction Fund: Trunk Reserve: DNR Grant: 2,500,000.00 125,000.00 69,002.50 50.000.00 TOTAL: 2,744,002.50 CCINFO.XLS4/13/99 LAKEFRONTPARKIMPROVEMENTPROJECT MISCELLANEOUS MATERIALS. SUPPLIES AND FURNISHINGS (1) Items Purchase and Installed by City Crews: . Boardwalk . Athletic Turf Grass Seed . Native Prairie Seed and Flowers . Trees, Shrubs and Plants . Picnic Tables and Benches . Signs . Trash Containers . Protective Skate Flooring for Pavilion (2) Items Installed by Contractor Other Than Ingram: . Parking Lot and Trail Lighting (NSP Contract) . Mulching . Security System for Pavilion (3) Items Purchased by City and Installed by Others: . Shingles for Pavilion (Installed by Sentence to Service) . Pay Phone . Fireplace for Pavilion (4) Miscellaneous Furnishings and Supplies: . Interior Tables and Chairs for Pavilion . Popcorn, Hot Dog, and Vending Equipment for Concession Stand . Refrigerator for Concession Stand k:\paul\misc\LFPKmisc.doc . ill,