AUGUST 6, 2007
9D
JENNIFER WITTKOPF, PUBLIC WORKS COORDINATOR
CONSIDER APPROVAL OF A RESOLUTION ACCEPTING BIDS AND
AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE
CITY'S STANDARD CONSTRUCTION CONTRACT WITH RICE LAKE
CONSTRUCTION GROUP FOR CONSTRUCTION OF THE WATER
TREATMENT FACILITY
Introduction
The purpose of this agenda item is to seek City Council authorization to enter
into the City's Standard Construction Contract with Rice Lake Construction
Group for the construction of the Water Treatment Facility (WTF).
Historv
On June 18, 2007, the City Council approved the plans and specifications and
authorized advertisement for bids for the WTF.
On June 25,2007, the Planning Commission approved a Conditional Use
Permit, which is required to construct and operate the facility, a Public Service
Structure, in the R 1-LD (residential) zoning area.
Current Circumstances
On July 24,2007, the City received and opened six bids for the WTF project.
The bids received ranged from a low bid of $12,746,500 to a high of
$13,887,590 as shown in the following table:
Contractor Bid Amount
Rice Lake Construction Group $ 12,746,500
BOR-SON Construction $ 12,899,000
Gridor Construction, Inc. $ 13,133,900
Madsen-Johnson Corporation $ 13,389,600
Knutson Construction Services $ 13,597,000
Graham Penn-Co. Construction $ 13,887,590
The low bid received was approximately four percent less that the Engineer's
estimate of $13,300,000 for this project, and all bids were within ten percent of
the low bid. Attached for the City Council to review is the bid evaluation from
the City's consultant, Bolton & Menk, and the contractor's project history.
It is the recommendation of the consultant and City staff that the Council
accept the bids and award the City's Standard Construction Contract to Rice
Lake Construction Group in the amount of $12,746,500 for the WTF.
www.cityofpriorlake.com
Phone 952.447.9800 / Fax 952.447.4245
ISSUES:
Bid alternates and deductions are not issues with the low bid received for this
project.
The contractors could list "alternative" manufacturers and prices to be
reviewed as acceptable alternates to the "Basis of Bid" manufacturers. Rice
Lake Construction Group did not list any "alternative" manufacturers.
Included in the final plans is a standing seam metal roof superstructure,
designed to be placed on top of the standard pre-cast concrete panel roof.
This roof system is not integral to the structure itself; it is instead an
architectural addition provided to meet the neighborhood's desire for a
residential-style building. This roof was included in the bid as an optional
deduction that could be removed from the project scope, if the costs and
budget necessitated. The bid from Rice Lake includes a deduct amount of
$65,000. This deduct amount is relatively small, and the overall bid from Rice
Lake is below the Engineer's estimate. In an effort to be sensitive to the needs
of the surrounding neighborhood, it is therefore recommended that the City not
accept this deduct item, and the standing seam metal roof be installed.
FINANCIAL
IMPACT:
The estimated project budget reviewed by the City Council on June 18, 2007,
was $14,553,000. This budget includes all construction and design work
associated with the WTF. Based on acceptance of the low bid received, the
final budget is detailed below:
(1 )
Amount
$ 12,746,500
$ 870,000
$ 208,000
$ 192,000
ect
Total Pro"ect Cost
(1) Includes $100,000 in City Administration Costs
$14,016,500
The proposed funding for the project is as follows:
Funding Source Amount
Water Storage Fund $ 2,000,000
Trunk Reserve Fund (1) $ 2,316,500
Water Revenue Bonds $ 9,700,000
----.
---
Total Funding $14,016,500
(1) 20% (1.5 MGD) New Development Apportionment for 7.5 MGD capacity (less
storage, roof and landscaping)
The proposed project budget is $500,000 less than the previously approved
budget. The budget includes a $300,000 reduction in the proposed bond sale
for the project which will result in a savings to the Utility Fund and will help
extend existing rates.
ALTERNATIVES:
The alternatives are as follows:
1. Approve a resolution authorizing the Mayor and City Manager to
execute the City's Standard Construction Contract with Rice Lake
Construction Group for construction of the Water Treatment Facility.
2. Table this agenda item for a specific reason.
3. Deny this agenda item for a specific reason and provide staff with
direction.
RECOMMENDED
MOTION:
Alternative # 1.
Revi
Steve Albrecht, Public Works Director/City Eng.
./.~/~~ PRio~',
/ ,
/.... ~\
I t ~ 1 4646 Dakota Street S.E.
\U ~) Prior Lake, MN 55372-1714
\ /"rJ /
\. /
'"rltINNESOil'- ,/
'------------'
A RESOLUTION ACCEPTING BIDS AND AUTHORIZING THE MAYOR AND CITY MANAGER TO
EXECUTE THE CITY'S STANDARDIZED CONSTRUCTION CONTRACT WITH RICE LAKE
CONSTRUCTION GROUP FOR CONSTRUCTION OF THE WATER TREATMENT FACILITY
RESOLUTION 07 -xx
Motion By:
Second By:
WHEREAS, The City has planned for a Water Treatment Facility for more than 10 years; and
WHEREAS, The City Council made the required water rate adjustments in 2005 to fund the
project; and
WHEREAS, The City Council approved plans and specifications and authorized advertisement of
bids on June 18, 2007; and
WHEREAS, The Planning Commission approved a Conditional Use Permit for construction and
operation of a Public Service Structure in the R1-LD (residential) zoning area; and
WHEREAS, Bids were received and opened on June 24,2007, as follows:
Contractor Bid Amount
Rice Lake Construction Group $ 12,746,500
BOR-SON Construction $ 12,899,000
Gridor Construction, Inc. $ 13,133,900
Madsen-Johnson Corporation $ 13,389,600
Knutson Construction Services $ 13,597,000
Graham Penn-Co. Construction $ 13,887,590
WHEREAS, The City's consultant is recommending acceptance of the low bid from Rice Lake
Construction Group; and
WHEREAS, The Water Treatment Facility budget is proposed as follows:
(1 )
Amount
$12,746,500
$870,000
$208,000
$192,000
Total Pro"ect Cost
(1) Includes $100,000 in City Administration Costs
$14,016,500
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
www.cityofpriorlake.com
Phone 952.447.9800 / Fax 952.447.4245
2. The City Council finds that Rice Lake Construction Group is the lowest responsible bidder. Rice
Lake Construction Group has considerable experience building municipal water treatment
facilities.
3. The Mayor and City Manager are hereby authorized to execute the City's Standard Construction
Contract with Rice Lake Construction Group for construction of the Water Treatment Facility.
4. The proposed funding for the project is as follows:
Fundino Source Amount
Water Storage Fund $ 2,000,000
Trunk Reserve Fund (1) $ 2,316,500
Water Revenue Bonds (2) $ 9,700,000
Total Fundino $14,016,500
(1) 20% (1.5 MGD) New Development Apportionment for 7.5 MGD capacity (non-
storage, roof and landscape costs)
(2) Reflects the reduction of $300,000 in bonds because of lower than expected bid.
5. The City shall transfer $ 2,316,500 from the Trunk Reserve Account to the Water Storage Fund.
6. The City shall appropriate $100,000 from the Water Storage Fund Account #505-49100-503 for
reimbursement of City Engineering and Administration Costs.
7. $1,200,000 in Water Revenue Bonds shall be issued in 2008 to complete the financing for the
Water Treatment Facility
PASSED AND ADOPTED THIS 6TH DAY OF AUGUST 2007.
YES
NO
Hauaen Hauaen
Erickson Erickson
Hedbera Hedbera
LeMair LeMair
Millar Millar
Frank Boyles, City Manager
~
E30L ,-Of'J &. ~ E: f'J I< ,
Consulting Engineers & Surveyors
12224 Nicollet Avenue · Burnsville, MN 55337-1649
Phone (952) 890-0509. FAX (952) 890-8065
I f'JC.
BID EVALUATION FOR THE CONSTRUCTION OF THE
WATER TREATMENT FACILITY
CITY PROJECT 07-122
CITY OF PRIOR LAKE, MINNESOTA
Six (6) bids were received for the construction of the water treatment facility. The bids ranged from
$12,746,500 to $13,887,590. The Engineer's estimate for this project was $13,300,000. The apparent low,
responsive and responsible bidder was Rice Lake Construction Group, of Deerwood, Minnesota.
The Contractors could list "Alternative" manufacturers along with installed prices to be reviewed as acceptable
equipment to the "Basis of Bid" manufacturers. The low bidder did not list any "Alternative" manufacturers.
The bidders were required to list a price for installing a flat roof over the garage and pump room areas instead
of the pitched, standing seam metal roof. Rice Lake Construction Group listed a deduct amount of$65,OOO.
Since the bid from Rice Lake Construction Group was below the engineers estimate and the deduct amount is
relatively small, we do not recommend the City accept the deduct item.
As presented in the attached Bid Tabulation, the low bid was approximately four (4) percent less than the
Engineer's estimate. The Bid Tabulation reveals that all of the bidders were within ten (10) percent ofthe low
bidder and the lowest three bidders were within four (4) percent of each other and the lowest three bidders
were below the Engineer's estimate.
The bid documents did not contain any wording or ambiguities so as to force the Contractors to build in
additional contingencies.
Since six (6) bids were received and the lowest three (3) were within four (4) percent of each other, we feel the
specifications were not restrictive to force a non-competitive bid situation.
The bid documents contained 540 calendar days after the Notice to Proceed to complete this project. This is
sufficient construction time so that the Contractor would not have to work overtime or add any additional costs
to complete this project.
G;\PRLK\M2138412\BIDEV AL.DOC
MANKATO. MN · FAIRMONT. MN · SLEEPY EYE. MN · BURNSVILLE. MN . CHASKA. MN
WILLMAR. MN · RAMSEY. MN . AMES. IA
www.bolton-menk.com
An Equal Opportunity Employer
Therefore, we feel that the bids received were competitive and responsive and re-bidding of the project would
not provide any cost savings.
A brief historical background of Rice Lake Construction Group is presented in this paragraph. Rice Lake
Construction Group has been in the construction business for 23 years. Rice Lake Construction Group does
approximately $50 million worth of projects per year and specializes in water and wastewater treatment
facilities. Bolton & Menk, Inc. has worked in the past with this contractor on water and wastewater treatment
facility projects in Walker, Lake Crystal, Red Wing. Granite Falls, St. Francis and Buffalo, Minnesota as welI
as Wakefield, NE. In addition, Rice Lake Construction Group recently completed the wastewater treatment
facility for SMSC.
In our opinion, Rice Lake Construction Group is experienced in the type of work required for this project. The
company has fulfilled the bidding and contract requirements. We recommend that their bid in the amount of
$12,746,900 be accepted.
Respectfully submitted,
Enclosure
G:\PRLK\M2138412\BIDEV AL.DOC
4tE ~
RICE LAKE
CONSTRUCTION GROUP
HISTORY OF PROJECTS
Project Project Name Architecf/Engineer Contract
Year and Location and Address Value
2007 Lift Station Bolton & Menk, Inc $ 190,000
St. Francis, MN 753340 Cree St NW
St. Francis, MN
2007 Water Treahnent Plant Black & Veatch $11,567,000
29080 Hwy #1804 Denver, CO
Selby, SD 57472
2007 Wellhouse No.3 McCombs Frank Roos Assoc $ 506,900
Isanti, MN 14800 28th Ave N, Ste 140
Plymouth, MN 55447
2007 Water Treahnent Plant Imp. Bolton & Menk, Inc. $14,655,000
Buffalo, MN 2335 Premier Drive
Mankato, MN 56001
2007 Well No. 15 Earth Tech $ 1,137,300
Mankato, MN 200 Indiana Ave
Stevens Point, WI 54481
2007 Lake Oahe Lift Station Black & Veatch $ 3,208,000
Glenham, SD. Denver, Co.
2006 Secondary Clarifier Mech. Coating Brown and Caldwell $ 198,700
WLSSD, Duluth, MN 2448 Childs Road
St. Paul, MN 55106
2006 Wellhouse No.2 Short Elliott Hendrickson $ 1,.049,178
Dundas, MN 3535 Vadnais Center Drive
St. Paul, MN 55317
2006 L-74& L-75 Lift Stations Metropolitan Council $ 8,494,000
Rosemount, MN (MCES) 390 N. Robert St
St. Paul, MN 55101
2006 Water Supply Fac. Pump. Station Bolton & Menk, Inc $ 2,133,000
& River Intake 2335 Premier Drive
Granite Falls, MN Mankato, MN 56001
2006 Fire Protection Concrete Tank S. & G. Constructors $ 610,110
Hinckley, MN 5906 Ford Court
Brighton, MI 48116
Project Project Name ArchitectjEngineer Contract
Year and Location and Address Value
2006 Warner Pump Station DeWild Grant Reckert $ 947,430
Warner, SD 1302 S. Union St
Rock Rapids, IA
2006 Wastewater Treabnent Facility Bolton & Menk, Inc. $12,920,000
Wakefield, NE 2730 Ford Street
Ames, IA 50010-0668
2006 Water Treabnent Facility Bolton & Menk, Inc. $ 960,400
Lake Lillian, MN 1960 Premier Drive
Mankato, MN 56001
2006 Deep Well No. 19 Pump. Fac. Bonestroo, Rosene, Anderlik $ 322,630
Apple Valley, MN 2335 W. Hwy 36
St. Paul, MN 55113
2006 Primary Clarifier Renovation Toltz, King Duval Anderson $ 675,600
Albert Lea, MN, Piper Jaffray Plaza
444 Cedar Street
St. Paul, MN 55101-2140
2006 Biosolids Improvements Bolton & Menk, Inc. $4,084,000
Madelia, MN 1960 Premier Drive
Mankato, MN 56001
2006 Westside Pump Station Freeberg & Grund $1,624,500
Roseau, MN 208 4th St. NW
Bemidji, MN 56601
2006 Water Treabnent Facility Exp. Bonestroo, Rosene, Anderlik $4,454,000
Inver Grove Heights, MN 2335 W Hwy 36
St. Paul, MN 55113
2006 Water Treabnent Facility Advanced Engineering $9,932,000
& Public Works Facility 2011 S. Sixth Street
Baxter, MN Brainerd, MN 56401
2006 L-42 Lift Station Improvements Metropolitan Council $1,366,900
Anoka, MN 230 E. Fifth Street
St. Paul, MN 55101
2006 Well House No. 14 WSB & Associates $ 535,200
Rosemount, MN 701 Xenia Ave S., Ste. 300
Minneapolis, MN 55416
2006 Knowlton Creek Pump Station Brown and Caldwell $ 960,500
WLSSD, Duluth, MN 2448 Childs Road
St. Paul, MN 55106
Project Proj ect Name Architect/Engineer Contract
Year and Location and Address Value
2006 Water Booster Station Addition Toltz, King Duval, Anderson $ 325,230
Loretto, MN Piper J affray Plaza
444 Cedar Street
St. Paul, MN 55101-2140
2005 Pumphouse No.3 Schoell & Madson, Inc. $ 507,300
Shakopee, MN 15050 23rd Ave N
Plymouth, MN 55447
2005 Well House No.4 Bolton & Menk, Inc. $ 281,600
Lonsdale, MN 1960 Premier Drive
Mankato, MN 56001
2005 Interceptor Scott County $ 187,200
Elko-New Market, MN
2005 WLSSD Conveyance System MSA Professional Services $ 242,350
Duluth, MN 301 W. 1st St., Suite 408
Duluth, MN 55802
2005 Jr. / Sr. High School- Masonry DLR Group, Inc. $1,032,000
Belle Plaine, MN 9521 W 78th St.
Eden Prairie, MN 55344
2005 Helmo Ave. - Retaining Wall RLK-Kuusisto, Ltd. $ 424,500
Oak dale, MN 6110 Blue Circle Dr. Ste 100
Minnetonka, MN 55343-5049
2005 Lift Station No.1 Public Works & Utilities $1,839,000
Duluth, MN Engineering Division
411 W 1st Street
Duluth, MN 55802-1189
2005 Sludge Thickening Facility Bolton & Menk, Inc. $1,131,400
Rahr Malting 1960 Premier Drive
Mankato, MN 56001
2005 West Lk George Pretreabnent BDM Consulting $ 588,500
Oak Grove, MN 4175 Lovell Road, Suite 112
Lexington, MN 55014
2005 Isanti School - Masonry HGA Architects $1,657,450
Isanti, MN 701 Washington Avenue N
Minneapolis, MN 55403
2005 East Water Treabnent Plant Short Elliott Hendrickson, Inc. $1,619,500
Chanhassen, MN 3535 Vadnais Center Drive
St. Paul, MN 55317
Project Project Name Architect/Engineer Contract
Year and Location and Address Value
2005 New Prague & New Market KKE Architects $512,250
Elementary Schools 300 First Ave North
Minneapolis, MN 55401
2005 Water Treatment Plant Short Elliott Hendrickson, Inc. 7,155,500
Cambridge 3535 Vadnais Center Drive
S1. Paul, MN 55317
2005 Disinfection Conversion to Brown & Caldwell $1,522,380
Sodium Hypochlorite Project 30 E 7th St, Ste 2500
Duluth, MN S1. Paul, MN 55101
2005 HI! 2005 Chemical Storage Add. Chappel Central $ 279,750
Hutchinson, MN 2101 NW Gorton Ave
Willmar, MN 56201
2005 Water Treatment Plant Bonestroo, Rosene, Anderlik $4,682,900
Medina, MN 2335 W Highway 36
S1. Paul, MN 55113
2005 Westbound Liquor Store Tushi Montgomery & Assoc $ 178,000
(Masonry) 7645 Lyndale Ave S. Ste 100
Elk River, MN Richfield, MN 55423
2005 Power Plant Expansion Short Elliott Hendrickson $ 855,000
Princeton, MN 1200 25th Ave S
S1. Cloud, MN 56302
2005 Filter No.6 Renovation Bonestroo, Rosene, Anderlik $ 388,600
Richfield, MN 2335 W. Trunk Hwy 36
S1. Paul, MN 55113
2005 Northwest Lift Station Bonestroo, Rosene, Anderlik $1,175,700
Waseca, MN 2335 W. Trunk Hwy 36
S1. Paul, MN 55113
2004 WWTF Bolton & Menk, Inc. $27,400,000
Shakopee Mdewankanton 2626 Shadow lane, Ste 200
Sioux Community Chaska, MN 55318
2004 WTP Expansion Howard R. Green Co. $3,318,400
Albertville, MN 2250 Univeristy Ave W.
Suite 400N
S1. Paul, MN 55114
2004 WTF Expansion Bolton & Menk, Inc. $2,114,400
Lake Crystal MN 1960 Premier Drive
Mankato, MN 5600
Project Project Name ArchitectfEngineer Contract
Year and Location and Address Value
2004 Industrial Park WfP & WWTP Bolton & Menk, Inc. $ 439,600
Walker, MN 1960 Premier Drive
Mankato, MN 56001
2004 WWTP Improvements Bonestroo, Rosene, Anderlik $3,144,651
Eveleth, MN 2335 W. Trunk Hwy 36
St. Paul, MN 55113
2004 Calvary Hill Booster Station Progressive Consulting Engrs $ 678,800
St. Cloud, MN 6120 Earle Brown Dr, Ste 629
Minneapolis MN 55430-2581
2004 Well #11 Pumping Facilty Bonestroo, Rosene, Anderlik $ 579,500
Cottage Grove, MN 2335 W. Trunk Hwy 36
St. Paul, MN 55113
2004 Twin Bluffs WfP Bolton & Menk, Inc. $7,520,000
Redwing, MN 1960 Premier Drive
Mankato, MN 56001
2004 Marshall High School A TS&R $5,573,489
Masonry-Subcontract 8501 Golden Valley Road
Minneapolis, MN 55427
2004 Well #18 Pumping Facility Bonestroo, Rosene, Anderlik $ 277,840
Apple Valley, MN 2335 W. Hwy 36
St. Paul, MN 55113
2003 Lift Station Bolton & Menk, Inc. $ 336,500
Walker, MN 1960 Premier Drive
Mankato, MN 56001
2003 Wastewater Treatment Plant Bonestroo, Rosene, Anderlik $6,384,000
Otsego, MN 2335 W Hwy 36
St. Paul, MN 55113
2003 Riverside Pumping Station Toltz, King, Duval, Anderson $ 361,033
Brainerd, MN 1500 Piper Jaffray Plaza
444 Cedar Street
St. Paul, MN 55101-2140
2003 2003 New Well No.4 & Short Elliott Hendrickson $ 144,900
Pumphouse Modifications 1857 Design Drive N, Ste.300
Clearwater, MN Baxter, MN 56425
2003 Biosolids Treatment Improvements Wid seth Smith Nolting $1,194,400
Aitkin, MN 610 Fillmore Street
Alexandria, MN 56308
2003 Wastewater Treatment Plant Imp. Bolton & Menk, Inc. $1,422,600
Norwood Young America, MN 1515 E. Hwy 13
Burnsville, MN 56001-5900
Project Project Name Architecf/Engineer Contract
Year and Location and Address Value
2003 Terrace Park & Well No.5 WTP Bonestroo, Rosene, Anderlik $3,416,600
Spring Lake Park, MN 2335 W Hwy 36
St. Paul, MN 55113
2003 Wastewater Treatment Plant RLK Kuusisto $ 909,097
Crane Lake, MN 303 E. 19th S1. Box 656
Hibbing, MN 55746
2003 Connelly & W oodhill Bonestroo, Rosene, Anderlik $ 977,286
Booster Stations 2335 W Hwy 36
Savage, MN St. Paul, MN 55113
2003 L73 Lift Station Metropolitan Council $2,546,672
Woodbury, MN Environmental Services
230 E. 5th Street
S1. Paul, MN 55101
2002 Well No. 15 Pumping Facility Bonestroo, Rosene, Anderlik $ 318,487
Woodbury, MN 2335 W Hwy 36
S1. Paul, MN 55113
2002 Wastewater Treatment Plant Short Elliott Hendrickson $8,583,900
Belle Plaine, MN 3535 Vadnais Center Dr.
S1. Paul, MN 55110
2002 Deep Well No.6 Pump. Facility Bonestroo Williamson $ 491,842
Cold Spring, MN Kotsmith
3721 23rd S1. S.
S1. Cloud, MN 56301
2002 NCIP Monitoring Facility Bolton & Menk, Ine. $1,056,000
Wells Dairy 2730 Ford Street
LeMars,IA Ames,IA 50010-0668
2002 Water Treatment Plant Short Elliott Hendrickson $1,054,400
Coleraine, MN 3535 Vadnais Center Dr.
S1. Paul, MN 55110
2002 Fire Hall Widseth Smith Nolting $ 407,800
Deerwood, MN 2000 Industrial Park Rd. S
Baxter MN 56425
2002 Well No.8 & 9 Bonestroo Rosene Anderlik $ 410,063
Chaska, MN 2335 W Hwy 36
St. Paul, MN 55113
2002 Water Treatment Plant No.8 Short, Elliott, Hendrickson $ 3,526,400
Hudson, WI 3535 Vadnais Center Dr.
St. Paul, MN 55110
Project Project Name Architecf/Engineer Contract
Year and Location and Address Value
2002 Water Treatment Plant Bolton & Menk, Inc. $ 7,849,400
Andover, MN 1960 Premier Drive
Mankato Mn 56001-5900
2002 Process Water Treatment Plant Bolton & Menk $ 991,400
Trail's Best Meat Snacks 1960 Premier Drive
Chandler, MN Mankato, MN 56001
2001 Pumphouse No. 12 Schoell & Madson $ 476,800
Shakopee PUC, MN 10580 Wayzata Blvd
Hopkins, MN 55305-1525
2001 Secondary WWTF Marathon Engineering $3,610,000
Phase I Improvements 2323 E Capitol Drive
Grand Rapids, MN PO Box 8028
Appleton, WI 55713
2001 Wastewater Treatment Plant HDR Engineering $10,654,400
Mille Lacs Wastewater Mgmt. 6190 Golden Hills Drive
Onamia, MN Minneapolis, MN 55416
2001 Lift Stations/ Collection System HDR Engineering, Inc. $1,780,000
Mille Lacs Wastewater Mgmt. 6190 Golden Hills Drive
Onamia, MN Minneapolis, MN 55416
2001 Centrifuge Installation Project Brown & Caldwell $2,423,000
Metropolitan Council 1500 Norwest Tower
Minneapolis, MN 55435-4803
2001 Pumphouse No.5 & SCADA Westwood Professional Svcs. $ 328,800
Big Lake, MN 7599 Anagram Drive
Eden Prairie, MN 55344
2001 Water Treatment Plant RLK-Kuusisto $ 316,984
Willow River, MN 6110 Blue Circle Drive
Minnetonka, MN 55343
2001 Wastewater Treatment Plant Bolton & Menk, Inc. $ 798,380
Monticello, MN 1960 Premier Drive
Mankato, MN 56001
Robert Brown, P.E.
2001 Booster Station No.2 Bolton & Menk, Inc. $ 498,400
Buffalo, MN 316 4th St SW
Willmar, MN 56201-0895
Bradley DeWolf, P.E.
2001 Water Treatment Plant Expansion Black & Veatch $5,749,400
Lakeville, MN 8400 Ward Parkway
Kansas City, MO 64114
James Winger, P.E.
Proj ect Project Name Architecf/Engineer Contract
Year and Location and Address Value
2001 City of Apple Valley Bonestroo, Rosene, Anderlik $ 207,600
Well No. 17 Pumping Facility 2335 W Trunk Hwy 36
Apple Valley, MN St. Paul, MN 55113
Daryl Kirshenman, P.E.
2001 Odor Control Improvements Metropolitan Council $ 499,000
Various Site in Twin Cities Environmental Services
230 E. 5th Street
St. Paul, MN 55101
Marv Kravfe, CAR
2000 Lift Station No.2 Renovation Bonestroo, Rosene, Anderlik $1,164,400
Plymouth, MN 2335 W Hwy 36
St. Paul, MN 55113
Kent Wagner, P.E.
2000 Design/Build WWTP Modification Bolton & Menk, Inc. $ 676,000
Rahr Malting Co 515 N Riverfront Dr.
Shako pee, MN Mankato, MN 56001
Bob Brown, P.E.
2000 Biosolids Drying Addition Donohue Associates, Inc. $1,432,000
Hutchinson, MN 4343 South Taylor Drive
Sheboygan WI 53081
Dave Frah, P.E.
2000 Centerville Interceptor Metropolitan Council $ 92,000
Meter & Siphon Structures Environmental Services
Centerville, MN 230 E. 5th Street
St. Paul, MN 55101
Marv Kravfe,
2000 Wastewater Treahnent Facility Cedar Corporation Inc. $2,382,000
Somerset, WI 604 Wilson Ave
Menomonie WI 54751
Tim Stockman, P.E.
2000 Water Treahnent Plant No.1 Toltz, King, Duvall, Anderson $2,432,000
Forest Lake, MN 1500 Piper Jaffray Plaza
444 Cedar Street
St. Paul, MN 55101-2140
Kurt Johnson, P.E.
2000 Design/Build Brown & Caldwell $1,816,100
Biosolids Storage Facility 1500 Norwest Tower
Carlton, MN St. Paul, MN 55101
David Wunder, P.E.
Project Proj ect Name Architect/Engineer Contract
Year and Location and Address Value
2000 Wastewater Treatment Facility Widseth Smith Nolting & $ 32,000
Modifications Associates
Crosby, MN 2000 Industrial Park Rd S
Baxter, MN 56425
Mark Hallan, P.E.
1999 SMTC Bus Garage Remodel LSA Design $ 455,500
Eden Prairie, MN 250 N 3rd Ave
Minneapolis, MN 55401
Kyle Williams, AlA
1999 Water Treabnent Facility Shank Constructors $1,292,200
Subcontractor - Concrete Work 3501- 85th Ave. N.
Virginia, MN Brooklyn Park, MN
Brian Shank
1999 Water Treatment Facility Bonestroo, Rosene, Anderlik $1,494,400
Walker, MN 2335 W Hwy 36
S1. Paul, MN 55113
Miles Jensen, P.E.
1999 Wastewater Treatment Facility Bonestroo, Rosene, Anderlik $1,953,900
Hinckley, MN 2335 W Hwy 36
St. Paul, MN 55113
Kent Wagner, P.E.
1999 Water Treatment Facility Widseth Smith Nolting & $ 991,300
Ashby, MN Associates
610 Fillmore Street
Alexandria, MN 56304
Jeff Ledin, P.E.
1999 Water Treatment Facility Widseth Smith Nolting & $1,063,300
Pequot Lakes, MN Associates
2000 Industrial Park Rd S
Baxter, MN 56425
Mark Hallan, P.E.
1999 Wastewater Treatment Facility Short Elliott Hendrickson $ 604,000
Cumberland, WI 421 Frenette Drive
Chippewa Falls, WI 54729
Jerry Doriot, P.E.
1998 Hallett Community Center Kraus-Anderson Construction $ 318,000
Concrete Foundations 206 Beltrarni Ave
Crosby, MN Bernidji, MN 56601
1998 Design/ Build WWTF Bolton & Menk, Inc. $3,489,100
Rahr Malting Co 515 N Riverfront Dr.
Shakopee, MN Mankato, MN 56001
Project Project Name ArchitectfEngineer Contract
Year and Location and Address Value
1998 F orcemain Structures S. M. Hentges & Sons, Inc. $ 228,250
Subcontractor - Structures 650 Quaker Ave.
Chaska, MN Jordan,MN 55355
1998 Wastewater Treatment Facilities Bolton & Menk, Inc. $1,197,970
Courtland, MN 515 N. Riverfront Drive
Mankato, MN 56001
Bob Brown, P.E.
1998 Wastewater Treatment Facilities Veenstra & Kimm $2,274,000
Waukee,IA 3000 Westown Pkwy
W. Des Moines, IA 50266
Tim O'Conner, P.E.
1998 East Grit Effluent Improvements Metropolitan Council $ 177,200
St. Paul, MN Environmental Services
230 E. Fifth St.
St. Paul, MN 55101
Don Norbin, CAR
1998 Flood Control Improvements Bonestroo, Rosene, Anderlik $ 750,180
Breckenridge, MN 2335 W. Hwy 36
St. Paul, MN 55101
Daryl Kirshenman, P.E.
1997 Main Lift Station Bolton & Menk, Inc. $ 874,400
North Mankato, MN 515 N Riverfront Dr.
Mankato, MN 56001
Herman Dharmarajah, P.E.
1997 Lift Station Bonestroo, Rosene, Anderlik $ 798,000
Woodbury, MN 2335 W Hwy 36
St. Paul, MN 55101
Daryl Kirshenman, P.E.
1997 Wastewater Treatment Imp. Short Elliott Hendrickson $1,418,500
Clear Lake, MN 3535 Vadnais Center Dr.
St. Paul, MN 55110
Thomas Dye, P.E.
1997 St. Peter Forcemain Crossing Bolton & Menk, Inc. $ 602,900
Minnesota River 515 N Riverfront Dr.
St. Peter, MN Mankato, MN 56001
Bob Brown, P.E.
1997 Waconia Interceptor Imp. Metropolitan Council $ 2,449,300
Main Lift Station Environmental Services
Waconia, MN 230 E. 5th Street
St. Paul, MN 55101
Marv Kravfe, CAR
Project Project Name Architect/Engineer Contract
Year and Location and Address Value
1997 Waconia Interceptor Imp. Metropolitan Council $ 311,000
Forcemain Structures Environmental Services
Waconia, MN 230 E. 5th Street
St. Paul, MN 55101
Marv Kravfe, CAR
1997 Empire Wastewater Treatment Metropolitan Council $2,549,000
Plant Expansion Environmental Services
Farmington, MN 230 E. 5th St
S1. Paul, MN 55101
Dale Solberg, CAR
1997 Water Treahnent Facility Bonestroo, Rosene, Anderlik $ 896,300
Little Falls, MN 2335 W Trunk Hwy 36
S1. Paul, MN 55113
Miles Jensen, P.E.
1997 Meter Station & Structures S. M. Hentges & Sons, Ine. $ 254,000
Subcontractor - Structures 650 Quaker Ave.
Dundas, MN Jordan, MN 55352
Steve Hentges
1996 Camp Ripley McCombs Frank Roos Assoc. $ 339,800
Stormwater Treatment 15050 23rd Ave N
Camp Ripley, MN Plymouth MN 55447
Charles Eberhard, P.E.
1996 Wastewater Treahnent Facility Bolton & Menk, Inc $1,896,600
Cologne, MN 515 N Riverfront Drive
Mankato, MN 56001-3471
Jon Peterson, P.E.
1996 City of Isanti Howard Kuusisto Engineers $6,750,000
Wastewater Treatment Facility 1821 University Ave, Rm N-196
Isanti, MN St Paul, MN 55104-2801
Ken Weber, P.E.
1996 City of Forest Lake Toltz, King, Duvall, Anderson $2,488,800
Water Treatment Plant No.2 444 Cedar Street
Forest Lake, MN S1. Paul, MN 55101-2140
Dave Moore, P.E.
1996 City of Willmar Bonestroo, Rosene, Anderlik $3,388,800
Wastewater Treahnent Facility 2335 W Trunk Hwy 36
Willmar, MN S1. Paul, MN 22113
Richard Turner, P.E.
1996 City of Apple Valley Bonestroo, Rosene, Anderlik $ 130,800
Well No.8 Pumping Facility 2335 W Trunk Hwy 36
Apple Valley, MN St. Paul, MN 55113
Daryl Kirshenman, P.E.
Project Proj ect Name ArchitectfEngineer Contract
Year and Location and Address Value
1996 City of So. St. Paul Toltz, King, Duvall, Anderson $ 137,900
Waterous Lift Station 444 Cedar St
South S1. Paul, MN S1. Paul, MN 55101-2140
Dave Moore, P.E.
1996 City of Arlington Bolton & Menk, Inc. $1,541,400
Water Treatment Facilities 515 N Riverfront Drive
Arlington, MN Mankato, MN 56001
Herman Dharmarajah, P.E.
1995 City of Park Rapids B. A. Liesch Associates $7,980,800
Industrial WWTP 13400 15th Ave N
Park Rapids, MN Plymouth, MN 55441
James Bullert, P.E.
1995 City of Milford Howard R. Green Company $ 966,400
Water Treatment Plant 309 W 43rd St Ste 101
Milford, IA Sioux Falls, SD 57105
Cecil Coombs, P.E.
1995 City of Little Falls Bonestroo, Rosene, Anderlik $1,014,400
Water Treatment Facility 2335 W Trunk Hwy 36
Little Falls, MN S1. Paul, MN 55113
Miles Jensen, P.E.
1995 City of Pelican Rapids Bonestroo, Rosene, Anderlik $2,139,300
Wastewater Treatment Facilities 2335 W Trunk Hwy 36
Pelican Rapids, MN S1. Paul, MN 55113
Richard Turner, P.E.
1994 City of Cokato Bonestroo, Rosene, Anderlik $3,289,100
Wastewater Treatment Facilities 2335 W Trunk Hwy 36
Cokato, MN S1. Paul, MN 55113
1994 City of Silver Bay RREM, Inc. $1,825,000
Wastewater Treatment Fac. Mod. 301 First S1. , Ste 408
Silver Bay, MN Duluth, MN 55802
Mike Miller, P. E.
1994 White Bear Lake Metropolitan Waste $ 552,508
Lift Station L-5 Replacement Control Commission
White Bear Lake, MN S1. Paul, MN
Don Norbin, CAR
1994 City of LeSueur Bolton & Menk, Inc. $ 107,000
F orcemain Crossing 515 North Riverfront Drive
LeSuer, MN Mankato, MN 56001
Bob Brown, P.E.
Project Project Name ArchitectfEngineer Contract
Year and Location and Address Value
1994 Blaine Interceptor Metropolitan Waste $ 108,700
Blaine, MN Control Commission
Subcontractor to Kenko, Inc. St. Paul, MN
1994 City of Mound McCombs Frank Roos Assoc. $ 445,400
Lift Station Improvements 15050 23rd Ave N
Mound, MN Plymouth, MN 55447
1994 City of Two Harbors RustE & I $1,994,400
Wastewater Treatment Facility Imp. 3033 Campus Drive
Two Harbors, MN Minneapolis, MN 55441
Doug Tholo, P.E.
1993 U.S. Army Corps of Engineers U.s. Army Corps of Engineers $ 292,400
Sewage Treatment System Exp. 190 5th Street E
Crosslake, MN S1. Paul, MN 55101-1638
Joel Rogers, Project Manager
1993 City of Luverne Ulteig Engineering $ 437,100
Wastewater Treatment Facility Minneapolis, MN
Luverne, MN Gerald P. Floden, P.E.
1993 City of Albertville Meyer- Rohlin, Inc. $ 801,400
Wastewater Treatment Facility 1111 Hwy 25 North
Albertville, MN Buffalo, MN
1993 City of Lake City Wallace Holland Kastler $ 1,501,300
Wastewater Treatment Facility Schmitz & Co.
Lake City, MN Ken Boyer, P.E.
1993 City of Sioux Falls HDR, Engineering $ 2,940,800
Potable Water Well Field Expansion Omaha, NE
Sioux Falls, SD Glen Dostal, P.E.
1993 City of Apple Valley Bonestroo, Rosene, $ 165,600
Water Pumping Station Anderlik & Assoc.
Apple Valley, MN Dick Foster, P.E.
1993 City of Crosby Widseth, Smith, Nolting $ 667,950
New City Hall Construction Alexandria, MN
Crosby, MN Paul Ringdahl, AlA
1992 City of Vadnais Heights SEH, Inc. $ 195,950
Pumphouse No.3 - Rehab S1. Paul, Mn
Vadnais Heights, MN Steve Campbell, P.E.
1992 MWCC Metropolitan Waste $ 472,840
Misc. Sewer Rehab Projects Control Commission
Metro Area Sites, MN S1. Paul, MN
Bill Knoff, CAR
Project Project Name ArchitectfEngineer Contract
Year and Location and Address Value
1992 Waste Water Control Structures S. J. Louis Construction $ 152,000
Subcontractor - Structures 3032 County Road 138
Onamia, MN Waite Park, MN 56387
Chuck Rugroden
1992 MWCC Metropolitan Waste $ 553,000
Blue Lake WWfP Dewatering Control Commission
System Phase - II St. Paul, MN
Shakopee, MN Bill Johnson, CAR
1992 City of New Hope Bonestroo, Rosene, $ 122,319
Lift Stations 3 & 4 Anderlik & Assoc.
New Hope, MN Daryl Kirschenman, P.E.
1992 City of Rogers RCM Associates, Inc. $ 737,300
Wastewater Treahnent Facility Minnetonka, MN
Rogers, MN Gary Dorn, P.E.
1992 City of Independence Owen Ayres & Assoc. $ 694,153
St. & Utility Improvement Eau Claire, WI
Independence, WI John Iverson, P.E.
1992 City of Renville Bolten & Menk, Inc. $ 1,738,100
Wastewater Treahnent Facility Burnsville, MN
Renville, MN R. Kelly Yahnke, Eng.
1992 City of Braham Maier Stewart & Assoc. $ 732,700
Wastewater Treahnent Facility St. Paul, MN
Braham, MN Brian Miller, P.E.
1992 City of Bloomington City of Bloomington $ 174,642
Soundwall Construction Engineering Division
Bloomington, MN Wayne Force, P.E.
1991 City of Hinckley Bonestroo, Rosene, $ 717,705
TH 23 Reconstruction Anderlik & Assoc.
Hinckley, MN Keith Gordon, P.E.
1991 City of Shoreview SEH, Inc. $ 79,625
Lake Owasso Outlet Mod. St. Paul, MN
Shoreview, MN Mark Lobermeier, P.E.
1991 City of Andover Toltz, King, Duvall, Anderson $ 36,850
Control Valve Vault St. Paul, MN
Andover, MN David Moore, P.E.
1991 City of Grand Rapids Public Utilities Comm. $1,533,600
Wastewater Treahnent Facility Grand Rapids, MN
Grand Rapids, MN Norm Mattson, P.E.
Project Project Name Architecf/Engineer Contract
Year and Location and Address Value
1991 MacMillan Bloedel, Ltd. PS&E, Ltd. $ 135,800
Pneumatic Foundation Richmond, BC, Canada
Deerwood, MN Rod DeSequera, P.E.
1991 City of Randall RCM Associates, Inc. $ 1,231,600
Wastewater Treatment Facility Minnetonka, MN
Randall, MN Gary Darn, P.E
1991 City of Ogilvie Bonestroo, Rosene, $ 630,800
Wastewater Treatment Facility Anderlik & Assoc.
Ogilvie, MN St. Paul, MN
Mark D. Wallis, P.E.
1991 City of Mora Mora PUC $1,488,000
Wastewater Treatment Facility Mora, MN
Mora, MN John McLouth, Owner's Rep.
1991 College of Saint Thomas Toltz, King, Duvall, Anderson $ 334,425
Sewer Separation Project St. Paul, MN
St. Paul, MN John Powell, P.E.
1991 City of Cottage Grove Metropolitan Waste $ 239,400
Wastewater Dechlorinator Control Commission
Cottage Grove, MN St. Paul, MN
Joe Betthauser, CAR
1991 City of Jordan Bolten & Menk $ 316,736
TH - 21 Improvements Mankato, MN
Jordan, MN R. Kelly Yahnke, Eng.
1991 Lino Lakes SEH, Inc. $ 413,255
Pheasant Hills Preserve St. Paul, MN
1991 City of Farmington City Engineering Dept. $ 469,386
Spruce St. Improvements Farmington, MN
Farmington, MN Tom Kaldonski, P.E.
1990 MacMillan Bloedel PS&E Ltd. $ 481,328
Fire Protection Syst. Richmond, BC, Canada
Deerwood, MN Rod DeSequera, P.E.
1990 City of St. Paul Public Works Dept. $1,031,504
Ar lingtonj Western St. Paul, MN
Comb. Sewer Separation Larry Leuth, P.E.
St. Paul, MN
1990 City of Farmington City Engineering Dept. $ 620,000
Utility Improvements Farmington, MN
Farmington, MN Thomas Kaldonski, P.E.
Project Project Name Architect/Engineer Contract
Year and Location and Address Value
1990 Metro Waste Control Com. Metropolitan Waste $ 1,900,000
Meter Station Improvements Control Commission
St. Paul, MN St. Paul, MN
Jim Chapdelaine, CAR
1989 City of Grand Rapids Public Utilities Comm. $ 545,291
Pokegama Ave & 8th St. Grand Rapids, MN
Grand Rapids, MN
1989 MCI Telecommunications MCI Telecommunication $ 507,224
Fiber Optic Cable Syst. Richardson, TX
Minneapolis, MN Horace Mills, Eng.
1989 City of Genola Dept. of Trans. $ 455,518
Transportation Building St. Paul, MN
Genola, MN John Hanson, P.E.
1988 City of Farmington City Engineering Dept. $ 277,742
St. & Utility Improvement Farmington, MN
Farmington, MN Thomas Kaldonski, P.E.
1988 MN DOT I "Croft Mine" MN DOT Engineering $ 350,000
Simulated Mine Shaft St. Paul, MN
Crosby, MN Ray Hanson, P.E.
1988 AT&T Communications Finley Engineering $ 780,000
Fiber Optic Cable Eau Claire, WI
Fargo, ND David Cheney, P.E.
1988 AT&T Communications Bucher Willis Ratlift $ 1,100,000
UIG Conduit Installation Aurora, IL
Medford, MN Gerald Memming, Eng.
1987 City of Northfield City Engineering Dept. $ 200,000
Utilities Improvements Northfield, MN
N orthfield, MN Bruce Bullow, P.E.
1987 City of Hinckley Boonestroo, Rosene, $ 520,000
Waste Water Treabnent Plant Anderlik & Assoc.
Hinckley, MN Michael Lynch, r.E.
1987 City of Eden Prairie City Engineering Dept. $ 375,000
Grading & Box Culverts Eden Prairie, MN
Eden Prairie, MN Rodney Rue, P.E.
1987 City of Lakeville Donohue & Assoc. $ 350,000
Oak Shores Utilities Maple Grove, MN
Lakeville, MN Steve Bulle, P.E.
Project Project Name Architecf/Engineer Contract
Year and Location and Address Value
1987 City of Crosby Crow Wing Co. Eng. Dept. $ 750,000
Grading, UtiI. & Struct. Brainerd, MN
Crosby, MN Dwayne Blanck, P.E.
1986 Mills Fleet Farm Widseth Smith Nolting $ 250,786
Utilities & Grading Brainerd, MN
Lakeville, MN Bruce Buxton, P.E.
1986 City of Pine City Howard A. Kuusisto $ 28,591
Indust. Park Watermain St. Paul, MN
Pine City, MN Howard Kuusisto, P.E.
1986 City of Apple Valley Bonestroo, Rosene, $ 721,539
The Oaks III Utility Anderlik & Assoc.
Improvements St. Paul, MN
Apple Valley, MN Keith Gordon, P.E
1986 City of Northfield City Engineering Dept. $ 636,961
Utilities & Grading Northfield, MN
Northfield, MN Bruce Ballert, P.E.
1986 City of Burnsville Orr-Schelen- Mayeron $ 184,576
Roma Lorna Storm Sewer & Assoc.
and Appurtenant Work Minneapolis, MN
Burnsville, MN E. H. Anderson, P.E.
1985 City of Sandstone Howard Kuusisto $ 28,740
Storm Sewer Improvement St. Paul, MN
Sandstone, MN Howard Kuusisto, P.E.
1985 City of Long Prairie Larson-Peterson $ 300,000
Watermain Improvements Detroit Lakes, MN
Long Prairie, MN Thomas Augustin, P.E.
1985 Melrose Telephone Co. C C & I Engineering $ 139,500
Telephone Conduit Fargo, ND
Melrose, MN Curtis Jacobson, P.E.
1985 City of Sartell Williamson-Kotsmith Inc. $ 96,043
San. Sewer & Watermain St. Cloud, MN
Sartell, MN Sydney Williamson, P.E.