Loading...
HomeMy WebLinkAbout9D - Water Treatment Facility -- "'- I./.'m/o~ PRIO~'\ i.... ~\ / f... ~ \ 4646 Dakota Street S.E. \U ~) Priorl-ak~!1_~~53.73~!_~_~~_____ .._ ___....____.,_m.___.. .._____ _______,_,_,____.______,.,.._"., __ ,,__ , , , / ", I\rINNEsoi~' '-------.,/ MEETING DATE: AGENDA #: PREPARED BY: AGENDA ITEM: DISCUSSION: CITY COUNCIL AGENDA REPORT AUGUST 6, 2007 9D JENNIFER WITTKOPF, PUBLIC WORKS COORDINATOR CONSIDER APPROVAL OF A RESOLUTION ACCEPTING BIDS AND AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE CITY'S STANDARD CONSTRUCTION CONTRACT WITH RICE LAKE CONSTRUCTION GROUP FOR CONSTRUCTION OF THE WATER TREATMENT FACILITY Introduction The purpose of this agenda item is to seek City Council authorization to enter into the City's Standard Construction Contract with Rice Lake Construction Group for the construction of the Water Treatment Facility (WTF). Historv On June 18, 2007, the City Council approved the plans and specifications and authorized advertisement for bids for the WTF. On June 25,2007, the Planning Commission approved a Conditional Use Permit, which is required to construct and operate the facility, a Public Service Structure, in the R 1-LD (residential) zoning area. Current Circumstances On July 24,2007, the City received and opened six bids for the WTF project. The bids received ranged from a low bid of $12,746,500 to a high of $13,887,590 as shown in the following table: Contractor Bid Amount Rice Lake Construction Group $ 12,746,500 BOR-SON Construction $ 12,899,000 Gridor Construction, Inc. $ 13,133,900 Madsen-Johnson Corporation $ 13,389,600 Knutson Construction Services $ 13,597,000 Graham Penn-Co. Construction $ 13,887,590 The low bid received was approximately four percent less that the Engineer's estimate of $13,300,000 for this project, and all bids were within ten percent of the low bid. Attached for the City Council to review is the bid evaluation from the City's consultant, Bolton & Menk, and the contractor's project history. It is the recommendation of the consultant and City staff that the Council accept the bids and award the City's Standard Construction Contract to Rice Lake Construction Group in the amount of $12,746,500 for the WTF. www.cityofpriorlake.com Phone 952.447.9800 / Fax 952.447.4245 ISSUES: Bid alternates and deductions are not issues with the low bid received for this project. The contractors could list "alternative" manufacturers and prices to be reviewed as acceptable alternates to the "Basis of Bid" manufacturers. Rice Lake Construction Group did not list any "alternative" manufacturers. Included in the final plans is a standing seam metal roof superstructure, designed to be placed on top of the standard pre-cast concrete panel roof. This roof system is not integral to the structure itself; it is instead an architectural addition provided to meet the neighborhood's desire for a residential-style building. This roof was included in the bid as an optional deduction that could be removed from the project scope, if the costs and budget necessitated. The bid from Rice Lake includes a deduct amount of $65,000. This deduct amount is relatively small, and the overall bid from Rice Lake is below the Engineer's estimate. In an effort to be sensitive to the needs of the surrounding neighborhood, it is therefore recommended that the City not accept this deduct item, and the standing seam metal roof be installed. FINANCIAL IMPACT: The estimated project budget reviewed by the City Council on June 18, 2007, was $14,553,000. This budget includes all construction and design work associated with the WTF. Based on acceptance of the low bid received, the final budget is detailed below: (1 ) Amount $ 12,746,500 $ 870,000 $ 208,000 $ 192,000 ect Total Pro"ect Cost (1) Includes $100,000 in City Administration Costs $14,016,500 The proposed funding for the project is as follows: Funding Source Amount Water Storage Fund $ 2,000,000 Trunk Reserve Fund (1) $ 2,316,500 Water Revenue Bonds $ 9,700,000 ----. --- Total Funding $14,016,500 (1) 20% (1.5 MGD) New Development Apportionment for 7.5 MGD capacity (less storage, roof and landscaping) The proposed project budget is $500,000 less than the previously approved budget. The budget includes a $300,000 reduction in the proposed bond sale for the project which will result in a savings to the Utility Fund and will help extend existing rates. ALTERNATIVES: The alternatives are as follows: 1. Approve a resolution authorizing the Mayor and City Manager to execute the City's Standard Construction Contract with Rice Lake Construction Group for construction of the Water Treatment Facility. 2. Table this agenda item for a specific reason. 3. Deny this agenda item for a specific reason and provide staff with direction. RECOMMENDED MOTION: Alternative # 1. Revi Steve Albrecht, Public Works Director/City Eng. ./.~/~~ PRio~', / , /.... ~\ I t ~ 1 4646 Dakota Street S.E. \U ~) Prior Lake, MN 55372-1714 \ /"rJ / \. / '"rltINNESOil'- ,/ '------------' A RESOLUTION ACCEPTING BIDS AND AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE CITY'S STANDARDIZED CONSTRUCTION CONTRACT WITH RICE LAKE CONSTRUCTION GROUP FOR CONSTRUCTION OF THE WATER TREATMENT FACILITY RESOLUTION 07 -xx Motion By: Second By: WHEREAS, The City has planned for a Water Treatment Facility for more than 10 years; and WHEREAS, The City Council made the required water rate adjustments in 2005 to fund the project; and WHEREAS, The City Council approved plans and specifications and authorized advertisement of bids on June 18, 2007; and WHEREAS, The Planning Commission approved a Conditional Use Permit for construction and operation of a Public Service Structure in the R1-LD (residential) zoning area; and WHEREAS, Bids were received and opened on June 24,2007, as follows: Contractor Bid Amount Rice Lake Construction Group $ 12,746,500 BOR-SON Construction $ 12,899,000 Gridor Construction, Inc. $ 13,133,900 Madsen-Johnson Corporation $ 13,389,600 Knutson Construction Services $ 13,597,000 Graham Penn-Co. Construction $ 13,887,590 WHEREAS, The City's consultant is recommending acceptance of the low bid from Rice Lake Construction Group; and WHEREAS, The Water Treatment Facility budget is proposed as follows: (1 ) Amount $12,746,500 $870,000 $208,000 $192,000 Total Pro"ect Cost (1) Includes $100,000 in City Administration Costs $14,016,500 NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. www.cityofpriorlake.com Phone 952.447.9800 / Fax 952.447.4245 2. The City Council finds that Rice Lake Construction Group is the lowest responsible bidder. Rice Lake Construction Group has considerable experience building municipal water treatment facilities. 3. The Mayor and City Manager are hereby authorized to execute the City's Standard Construction Contract with Rice Lake Construction Group for construction of the Water Treatment Facility. 4. The proposed funding for the project is as follows: Fundino Source Amount Water Storage Fund $ 2,000,000 Trunk Reserve Fund (1) $ 2,316,500 Water Revenue Bonds (2) $ 9,700,000 Total Fundino $14,016,500 (1) 20% (1.5 MGD) New Development Apportionment for 7.5 MGD capacity (non- storage, roof and landscape costs) (2) Reflects the reduction of $300,000 in bonds because of lower than expected bid. 5. The City shall transfer $ 2,316,500 from the Trunk Reserve Account to the Water Storage Fund. 6. The City shall appropriate $100,000 from the Water Storage Fund Account #505-49100-503 for reimbursement of City Engineering and Administration Costs. 7. $1,200,000 in Water Revenue Bonds shall be issued in 2008 to complete the financing for the Water Treatment Facility PASSED AND ADOPTED THIS 6TH DAY OF AUGUST 2007. YES NO Hauaen Hauaen Erickson Erickson Hedbera Hedbera LeMair LeMair Millar Millar Frank Boyles, City Manager ~ E30L ,-Of'J &. ~ E: f'J I< , Consulting Engineers & Surveyors 12224 Nicollet Avenue · Burnsville, MN 55337-1649 Phone (952) 890-0509. FAX (952) 890-8065 I f'JC. BID EVALUATION FOR THE CONSTRUCTION OF THE WATER TREATMENT FACILITY CITY PROJECT 07-122 CITY OF PRIOR LAKE, MINNESOTA Six (6) bids were received for the construction of the water treatment facility. The bids ranged from $12,746,500 to $13,887,590. The Engineer's estimate for this project was $13,300,000. The apparent low, responsive and responsible bidder was Rice Lake Construction Group, of Deerwood, Minnesota. The Contractors could list "Alternative" manufacturers along with installed prices to be reviewed as acceptable equipment to the "Basis of Bid" manufacturers. The low bidder did not list any "Alternative" manufacturers. The bidders were required to list a price for installing a flat roof over the garage and pump room areas instead of the pitched, standing seam metal roof. Rice Lake Construction Group listed a deduct amount of$65,OOO. Since the bid from Rice Lake Construction Group was below the engineers estimate and the deduct amount is relatively small, we do not recommend the City accept the deduct item. As presented in the attached Bid Tabulation, the low bid was approximately four (4) percent less than the Engineer's estimate. The Bid Tabulation reveals that all of the bidders were within ten (10) percent ofthe low bidder and the lowest three bidders were within four (4) percent of each other and the lowest three bidders were below the Engineer's estimate. The bid documents did not contain any wording or ambiguities so as to force the Contractors to build in additional contingencies. Since six (6) bids were received and the lowest three (3) were within four (4) percent of each other, we feel the specifications were not restrictive to force a non-competitive bid situation. The bid documents contained 540 calendar days after the Notice to Proceed to complete this project. This is sufficient construction time so that the Contractor would not have to work overtime or add any additional costs to complete this project. G;\PRLK\M2138412\BIDEV AL.DOC MANKATO. MN · FAIRMONT. MN · SLEEPY EYE. MN · BURNSVILLE. MN . CHASKA. MN WILLMAR. MN · RAMSEY. MN . AMES. IA www.bolton-menk.com An Equal Opportunity Employer Therefore, we feel that the bids received were competitive and responsive and re-bidding of the project would not provide any cost savings. A brief historical background of Rice Lake Construction Group is presented in this paragraph. Rice Lake Construction Group has been in the construction business for 23 years. Rice Lake Construction Group does approximately $50 million worth of projects per year and specializes in water and wastewater treatment facilities. Bolton & Menk, Inc. has worked in the past with this contractor on water and wastewater treatment facility projects in Walker, Lake Crystal, Red Wing. Granite Falls, St. Francis and Buffalo, Minnesota as welI as Wakefield, NE. In addition, Rice Lake Construction Group recently completed the wastewater treatment facility for SMSC. In our opinion, Rice Lake Construction Group is experienced in the type of work required for this project. The company has fulfilled the bidding and contract requirements. We recommend that their bid in the amount of $12,746,900 be accepted. Respectfully submitted, Enclosure G:\PRLK\M2138412\BIDEV AL.DOC 4tE ~ RICE LAKE CONSTRUCTION GROUP HISTORY OF PROJECTS Project Project Name Architecf/Engineer Contract Year and Location and Address Value 2007 Lift Station Bolton & Menk, Inc $ 190,000 St. Francis, MN 753340 Cree St NW St. Francis, MN 2007 Water Treahnent Plant Black & Veatch $11,567,000 29080 Hwy #1804 Denver, CO Selby, SD 57472 2007 Wellhouse No.3 McCombs Frank Roos Assoc $ 506,900 Isanti, MN 14800 28th Ave N, Ste 140 Plymouth, MN 55447 2007 Water Treahnent Plant Imp. Bolton & Menk, Inc. $14,655,000 Buffalo, MN 2335 Premier Drive Mankato, MN 56001 2007 Well No. 15 Earth Tech $ 1,137,300 Mankato, MN 200 Indiana Ave Stevens Point, WI 54481 2007 Lake Oahe Lift Station Black & Veatch $ 3,208,000 Glenham, SD. Denver, Co. 2006 Secondary Clarifier Mech. Coating Brown and Caldwell $ 198,700 WLSSD, Duluth, MN 2448 Childs Road St. Paul, MN 55106 2006 Wellhouse No.2 Short Elliott Hendrickson $ 1,.049,178 Dundas, MN 3535 Vadnais Center Drive St. Paul, MN 55317 2006 L-74& L-75 Lift Stations Metropolitan Council $ 8,494,000 Rosemount, MN (MCES) 390 N. Robert St St. Paul, MN 55101 2006 Water Supply Fac. Pump. Station Bolton & Menk, Inc $ 2,133,000 & River Intake 2335 Premier Drive Granite Falls, MN Mankato, MN 56001 2006 Fire Protection Concrete Tank S. & G. Constructors $ 610,110 Hinckley, MN 5906 Ford Court Brighton, MI 48116 Project Project Name ArchitectjEngineer Contract Year and Location and Address Value 2006 Warner Pump Station DeWild Grant Reckert $ 947,430 Warner, SD 1302 S. Union St Rock Rapids, IA 2006 Wastewater Treabnent Facility Bolton & Menk, Inc. $12,920,000 Wakefield, NE 2730 Ford Street Ames, IA 50010-0668 2006 Water Treabnent Facility Bolton & Menk, Inc. $ 960,400 Lake Lillian, MN 1960 Premier Drive Mankato, MN 56001 2006 Deep Well No. 19 Pump. Fac. Bonestroo, Rosene, Anderlik $ 322,630 Apple Valley, MN 2335 W. Hwy 36 St. Paul, MN 55113 2006 Primary Clarifier Renovation Toltz, King Duval Anderson $ 675,600 Albert Lea, MN, Piper Jaffray Plaza 444 Cedar Street St. Paul, MN 55101-2140 2006 Biosolids Improvements Bolton & Menk, Inc. $4,084,000 Madelia, MN 1960 Premier Drive Mankato, MN 56001 2006 Westside Pump Station Freeberg & Grund $1,624,500 Roseau, MN 208 4th St. NW Bemidji, MN 56601 2006 Water Treabnent Facility Exp. Bonestroo, Rosene, Anderlik $4,454,000 Inver Grove Heights, MN 2335 W Hwy 36 St. Paul, MN 55113 2006 Water Treabnent Facility Advanced Engineering $9,932,000 & Public Works Facility 2011 S. Sixth Street Baxter, MN Brainerd, MN 56401 2006 L-42 Lift Station Improvements Metropolitan Council $1,366,900 Anoka, MN 230 E. Fifth Street St. Paul, MN 55101 2006 Well House No. 14 WSB & Associates $ 535,200 Rosemount, MN 701 Xenia Ave S., Ste. 300 Minneapolis, MN 55416 2006 Knowlton Creek Pump Station Brown and Caldwell $ 960,500 WLSSD, Duluth, MN 2448 Childs Road St. Paul, MN 55106 Project Proj ect Name Architect/Engineer Contract Year and Location and Address Value 2006 Water Booster Station Addition Toltz, King Duval, Anderson $ 325,230 Loretto, MN Piper J affray Plaza 444 Cedar Street St. Paul, MN 55101-2140 2005 Pumphouse No.3 Schoell & Madson, Inc. $ 507,300 Shakopee, MN 15050 23rd Ave N Plymouth, MN 55447 2005 Well House No.4 Bolton & Menk, Inc. $ 281,600 Lonsdale, MN 1960 Premier Drive Mankato, MN 56001 2005 Interceptor Scott County $ 187,200 Elko-New Market, MN 2005 WLSSD Conveyance System MSA Professional Services $ 242,350 Duluth, MN 301 W. 1st St., Suite 408 Duluth, MN 55802 2005 Jr. / Sr. High School- Masonry DLR Group, Inc. $1,032,000 Belle Plaine, MN 9521 W 78th St. Eden Prairie, MN 55344 2005 Helmo Ave. - Retaining Wall RLK-Kuusisto, Ltd. $ 424,500 Oak dale, MN 6110 Blue Circle Dr. Ste 100 Minnetonka, MN 55343-5049 2005 Lift Station No.1 Public Works & Utilities $1,839,000 Duluth, MN Engineering Division 411 W 1st Street Duluth, MN 55802-1189 2005 Sludge Thickening Facility Bolton & Menk, Inc. $1,131,400 Rahr Malting 1960 Premier Drive Mankato, MN 56001 2005 West Lk George Pretreabnent BDM Consulting $ 588,500 Oak Grove, MN 4175 Lovell Road, Suite 112 Lexington, MN 55014 2005 Isanti School - Masonry HGA Architects $1,657,450 Isanti, MN 701 Washington Avenue N Minneapolis, MN 55403 2005 East Water Treabnent Plant Short Elliott Hendrickson, Inc. $1,619,500 Chanhassen, MN 3535 Vadnais Center Drive St. Paul, MN 55317 Project Project Name Architect/Engineer Contract Year and Location and Address Value 2005 New Prague & New Market KKE Architects $512,250 Elementary Schools 300 First Ave North Minneapolis, MN 55401 2005 Water Treatment Plant Short Elliott Hendrickson, Inc. 7,155,500 Cambridge 3535 Vadnais Center Drive S1. Paul, MN 55317 2005 Disinfection Conversion to Brown & Caldwell $1,522,380 Sodium Hypochlorite Project 30 E 7th St, Ste 2500 Duluth, MN S1. Paul, MN 55101 2005 HI! 2005 Chemical Storage Add. Chappel Central $ 279,750 Hutchinson, MN 2101 NW Gorton Ave Willmar, MN 56201 2005 Water Treatment Plant Bonestroo, Rosene, Anderlik $4,682,900 Medina, MN 2335 W Highway 36 S1. Paul, MN 55113 2005 Westbound Liquor Store Tushi Montgomery & Assoc $ 178,000 (Masonry) 7645 Lyndale Ave S. Ste 100 Elk River, MN Richfield, MN 55423 2005 Power Plant Expansion Short Elliott Hendrickson $ 855,000 Princeton, MN 1200 25th Ave S S1. Cloud, MN 56302 2005 Filter No.6 Renovation Bonestroo, Rosene, Anderlik $ 388,600 Richfield, MN 2335 W. Trunk Hwy 36 S1. Paul, MN 55113 2005 Northwest Lift Station Bonestroo, Rosene, Anderlik $1,175,700 Waseca, MN 2335 W. Trunk Hwy 36 S1. Paul, MN 55113 2004 WWTF Bolton & Menk, Inc. $27,400,000 Shakopee Mdewankanton 2626 Shadow lane, Ste 200 Sioux Community Chaska, MN 55318 2004 WTP Expansion Howard R. Green Co. $3,318,400 Albertville, MN 2250 Univeristy Ave W. Suite 400N S1. Paul, MN 55114 2004 WTF Expansion Bolton & Menk, Inc. $2,114,400 Lake Crystal MN 1960 Premier Drive Mankato, MN 5600 Project Project Name ArchitectfEngineer Contract Year and Location and Address Value 2004 Industrial Park WfP & WWTP Bolton & Menk, Inc. $ 439,600 Walker, MN 1960 Premier Drive Mankato, MN 56001 2004 WWTP Improvements Bonestroo, Rosene, Anderlik $3,144,651 Eveleth, MN 2335 W. Trunk Hwy 36 St. Paul, MN 55113 2004 Calvary Hill Booster Station Progressive Consulting Engrs $ 678,800 St. Cloud, MN 6120 Earle Brown Dr, Ste 629 Minneapolis MN 55430-2581 2004 Well #11 Pumping Facilty Bonestroo, Rosene, Anderlik $ 579,500 Cottage Grove, MN 2335 W. Trunk Hwy 36 St. Paul, MN 55113 2004 Twin Bluffs WfP Bolton & Menk, Inc. $7,520,000 Redwing, MN 1960 Premier Drive Mankato, MN 56001 2004 Marshall High School A TS&R $5,573,489 Masonry-Subcontract 8501 Golden Valley Road Minneapolis, MN 55427 2004 Well #18 Pumping Facility Bonestroo, Rosene, Anderlik $ 277,840 Apple Valley, MN 2335 W. Hwy 36 St. Paul, MN 55113 2003 Lift Station Bolton & Menk, Inc. $ 336,500 Walker, MN 1960 Premier Drive Mankato, MN 56001 2003 Wastewater Treatment Plant Bonestroo, Rosene, Anderlik $6,384,000 Otsego, MN 2335 W Hwy 36 St. Paul, MN 55113 2003 Riverside Pumping Station Toltz, King, Duval, Anderson $ 361,033 Brainerd, MN 1500 Piper Jaffray Plaza 444 Cedar Street St. Paul, MN 55101-2140 2003 2003 New Well No.4 & Short Elliott Hendrickson $ 144,900 Pumphouse Modifications 1857 Design Drive N, Ste.300 Clearwater, MN Baxter, MN 56425 2003 Biosolids Treatment Improvements Wid seth Smith Nolting $1,194,400 Aitkin, MN 610 Fillmore Street Alexandria, MN 56308 2003 Wastewater Treatment Plant Imp. Bolton & Menk, Inc. $1,422,600 Norwood Young America, MN 1515 E. Hwy 13 Burnsville, MN 56001-5900 Project Project Name Architecf/Engineer Contract Year and Location and Address Value 2003 Terrace Park & Well No.5 WTP Bonestroo, Rosene, Anderlik $3,416,600 Spring Lake Park, MN 2335 W Hwy 36 St. Paul, MN 55113 2003 Wastewater Treatment Plant RLK Kuusisto $ 909,097 Crane Lake, MN 303 E. 19th S1. Box 656 Hibbing, MN 55746 2003 Connelly & W oodhill Bonestroo, Rosene, Anderlik $ 977,286 Booster Stations 2335 W Hwy 36 Savage, MN St. Paul, MN 55113 2003 L73 Lift Station Metropolitan Council $2,546,672 Woodbury, MN Environmental Services 230 E. 5th Street S1. Paul, MN 55101 2002 Well No. 15 Pumping Facility Bonestroo, Rosene, Anderlik $ 318,487 Woodbury, MN 2335 W Hwy 36 S1. Paul, MN 55113 2002 Wastewater Treatment Plant Short Elliott Hendrickson $8,583,900 Belle Plaine, MN 3535 Vadnais Center Dr. S1. Paul, MN 55110 2002 Deep Well No.6 Pump. Facility Bonestroo Williamson $ 491,842 Cold Spring, MN Kotsmith 3721 23rd S1. S. S1. Cloud, MN 56301 2002 NCIP Monitoring Facility Bolton & Menk, Ine. $1,056,000 Wells Dairy 2730 Ford Street LeMars,IA Ames,IA 50010-0668 2002 Water Treatment Plant Short Elliott Hendrickson $1,054,400 Coleraine, MN 3535 Vadnais Center Dr. S1. Paul, MN 55110 2002 Fire Hall Widseth Smith Nolting $ 407,800 Deerwood, MN 2000 Industrial Park Rd. S Baxter MN 56425 2002 Well No.8 & 9 Bonestroo Rosene Anderlik $ 410,063 Chaska, MN 2335 W Hwy 36 St. Paul, MN 55113 2002 Water Treatment Plant No.8 Short, Elliott, Hendrickson $ 3,526,400 Hudson, WI 3535 Vadnais Center Dr. St. Paul, MN 55110 Project Project Name Architecf/Engineer Contract Year and Location and Address Value 2002 Water Treatment Plant Bolton & Menk, Inc. $ 7,849,400 Andover, MN 1960 Premier Drive Mankato Mn 56001-5900 2002 Process Water Treatment Plant Bolton & Menk $ 991,400 Trail's Best Meat Snacks 1960 Premier Drive Chandler, MN Mankato, MN 56001 2001 Pumphouse No. 12 Schoell & Madson $ 476,800 Shakopee PUC, MN 10580 Wayzata Blvd Hopkins, MN 55305-1525 2001 Secondary WWTF Marathon Engineering $3,610,000 Phase I Improvements 2323 E Capitol Drive Grand Rapids, MN PO Box 8028 Appleton, WI 55713 2001 Wastewater Treatment Plant HDR Engineering $10,654,400 Mille Lacs Wastewater Mgmt. 6190 Golden Hills Drive Onamia, MN Minneapolis, MN 55416 2001 Lift Stations/ Collection System HDR Engineering, Inc. $1,780,000 Mille Lacs Wastewater Mgmt. 6190 Golden Hills Drive Onamia, MN Minneapolis, MN 55416 2001 Centrifuge Installation Project Brown & Caldwell $2,423,000 Metropolitan Council 1500 Norwest Tower Minneapolis, MN 55435-4803 2001 Pumphouse No.5 & SCADA Westwood Professional Svcs. $ 328,800 Big Lake, MN 7599 Anagram Drive Eden Prairie, MN 55344 2001 Water Treatment Plant RLK-Kuusisto $ 316,984 Willow River, MN 6110 Blue Circle Drive Minnetonka, MN 55343 2001 Wastewater Treatment Plant Bolton & Menk, Inc. $ 798,380 Monticello, MN 1960 Premier Drive Mankato, MN 56001 Robert Brown, P.E. 2001 Booster Station No.2 Bolton & Menk, Inc. $ 498,400 Buffalo, MN 316 4th St SW Willmar, MN 56201-0895 Bradley DeWolf, P.E. 2001 Water Treatment Plant Expansion Black & Veatch $5,749,400 Lakeville, MN 8400 Ward Parkway Kansas City, MO 64114 James Winger, P.E. Proj ect Project Name Architecf/Engineer Contract Year and Location and Address Value 2001 City of Apple Valley Bonestroo, Rosene, Anderlik $ 207,600 Well No. 17 Pumping Facility 2335 W Trunk Hwy 36 Apple Valley, MN St. Paul, MN 55113 Daryl Kirshenman, P.E. 2001 Odor Control Improvements Metropolitan Council $ 499,000 Various Site in Twin Cities Environmental Services 230 E. 5th Street St. Paul, MN 55101 Marv Kravfe, CAR 2000 Lift Station No.2 Renovation Bonestroo, Rosene, Anderlik $1,164,400 Plymouth, MN 2335 W Hwy 36 St. Paul, MN 55113 Kent Wagner, P.E. 2000 Design/Build WWTP Modification Bolton & Menk, Inc. $ 676,000 Rahr Malting Co 515 N Riverfront Dr. Shako pee, MN Mankato, MN 56001 Bob Brown, P.E. 2000 Biosolids Drying Addition Donohue Associates, Inc. $1,432,000 Hutchinson, MN 4343 South Taylor Drive Sheboygan WI 53081 Dave Frah, P.E. 2000 Centerville Interceptor Metropolitan Council $ 92,000 Meter & Siphon Structures Environmental Services Centerville, MN 230 E. 5th Street St. Paul, MN 55101 Marv Kravfe, 2000 Wastewater Treahnent Facility Cedar Corporation Inc. $2,382,000 Somerset, WI 604 Wilson Ave Menomonie WI 54751 Tim Stockman, P.E. 2000 Water Treahnent Plant No.1 Toltz, King, Duvall, Anderson $2,432,000 Forest Lake, MN 1500 Piper Jaffray Plaza 444 Cedar Street St. Paul, MN 55101-2140 Kurt Johnson, P.E. 2000 Design/Build Brown & Caldwell $1,816,100 Biosolids Storage Facility 1500 Norwest Tower Carlton, MN St. Paul, MN 55101 David Wunder, P.E. Project Proj ect Name Architect/Engineer Contract Year and Location and Address Value 2000 Wastewater Treatment Facility Widseth Smith Nolting & $ 32,000 Modifications Associates Crosby, MN 2000 Industrial Park Rd S Baxter, MN 56425 Mark Hallan, P.E. 1999 SMTC Bus Garage Remodel LSA Design $ 455,500 Eden Prairie, MN 250 N 3rd Ave Minneapolis, MN 55401 Kyle Williams, AlA 1999 Water Treabnent Facility Shank Constructors $1,292,200 Subcontractor - Concrete Work 3501- 85th Ave. N. Virginia, MN Brooklyn Park, MN Brian Shank 1999 Water Treatment Facility Bonestroo, Rosene, Anderlik $1,494,400 Walker, MN 2335 W Hwy 36 S1. Paul, MN 55113 Miles Jensen, P.E. 1999 Wastewater Treatment Facility Bonestroo, Rosene, Anderlik $1,953,900 Hinckley, MN 2335 W Hwy 36 St. Paul, MN 55113 Kent Wagner, P.E. 1999 Water Treatment Facility Widseth Smith Nolting & $ 991,300 Ashby, MN Associates 610 Fillmore Street Alexandria, MN 56304 Jeff Ledin, P.E. 1999 Water Treatment Facility Widseth Smith Nolting & $1,063,300 Pequot Lakes, MN Associates 2000 Industrial Park Rd S Baxter, MN 56425 Mark Hallan, P.E. 1999 Wastewater Treatment Facility Short Elliott Hendrickson $ 604,000 Cumberland, WI 421 Frenette Drive Chippewa Falls, WI 54729 Jerry Doriot, P.E. 1998 Hallett Community Center Kraus-Anderson Construction $ 318,000 Concrete Foundations 206 Beltrarni Ave Crosby, MN Bernidji, MN 56601 1998 Design/ Build WWTF Bolton & Menk, Inc. $3,489,100 Rahr Malting Co 515 N Riverfront Dr. Shakopee, MN Mankato, MN 56001 Project Project Name ArchitectfEngineer Contract Year and Location and Address Value 1998 F orcemain Structures S. M. Hentges & Sons, Inc. $ 228,250 Subcontractor - Structures 650 Quaker Ave. Chaska, MN Jordan,MN 55355 1998 Wastewater Treatment Facilities Bolton & Menk, Inc. $1,197,970 Courtland, MN 515 N. Riverfront Drive Mankato, MN 56001 Bob Brown, P.E. 1998 Wastewater Treatment Facilities Veenstra & Kimm $2,274,000 Waukee,IA 3000 Westown Pkwy W. Des Moines, IA 50266 Tim O'Conner, P.E. 1998 East Grit Effluent Improvements Metropolitan Council $ 177,200 St. Paul, MN Environmental Services 230 E. Fifth St. St. Paul, MN 55101 Don Norbin, CAR 1998 Flood Control Improvements Bonestroo, Rosene, Anderlik $ 750,180 Breckenridge, MN 2335 W. Hwy 36 St. Paul, MN 55101 Daryl Kirshenman, P.E. 1997 Main Lift Station Bolton & Menk, Inc. $ 874,400 North Mankato, MN 515 N Riverfront Dr. Mankato, MN 56001 Herman Dharmarajah, P.E. 1997 Lift Station Bonestroo, Rosene, Anderlik $ 798,000 Woodbury, MN 2335 W Hwy 36 St. Paul, MN 55101 Daryl Kirshenman, P.E. 1997 Wastewater Treatment Imp. Short Elliott Hendrickson $1,418,500 Clear Lake, MN 3535 Vadnais Center Dr. St. Paul, MN 55110 Thomas Dye, P.E. 1997 St. Peter Forcemain Crossing Bolton & Menk, Inc. $ 602,900 Minnesota River 515 N Riverfront Dr. St. Peter, MN Mankato, MN 56001 Bob Brown, P.E. 1997 Waconia Interceptor Imp. Metropolitan Council $ 2,449,300 Main Lift Station Environmental Services Waconia, MN 230 E. 5th Street St. Paul, MN 55101 Marv Kravfe, CAR Project Project Name Architect/Engineer Contract Year and Location and Address Value 1997 Waconia Interceptor Imp. Metropolitan Council $ 311,000 Forcemain Structures Environmental Services Waconia, MN 230 E. 5th Street St. Paul, MN 55101 Marv Kravfe, CAR 1997 Empire Wastewater Treatment Metropolitan Council $2,549,000 Plant Expansion Environmental Services Farmington, MN 230 E. 5th St S1. Paul, MN 55101 Dale Solberg, CAR 1997 Water Treahnent Facility Bonestroo, Rosene, Anderlik $ 896,300 Little Falls, MN 2335 W Trunk Hwy 36 S1. Paul, MN 55113 Miles Jensen, P.E. 1997 Meter Station & Structures S. M. Hentges & Sons, Ine. $ 254,000 Subcontractor - Structures 650 Quaker Ave. Dundas, MN Jordan, MN 55352 Steve Hentges 1996 Camp Ripley McCombs Frank Roos Assoc. $ 339,800 Stormwater Treatment 15050 23rd Ave N Camp Ripley, MN Plymouth MN 55447 Charles Eberhard, P.E. 1996 Wastewater Treahnent Facility Bolton & Menk, Inc $1,896,600 Cologne, MN 515 N Riverfront Drive Mankato, MN 56001-3471 Jon Peterson, P.E. 1996 City of Isanti Howard Kuusisto Engineers $6,750,000 Wastewater Treatment Facility 1821 University Ave, Rm N-196 Isanti, MN St Paul, MN 55104-2801 Ken Weber, P.E. 1996 City of Forest Lake Toltz, King, Duvall, Anderson $2,488,800 Water Treatment Plant No.2 444 Cedar Street Forest Lake, MN S1. Paul, MN 55101-2140 Dave Moore, P.E. 1996 City of Willmar Bonestroo, Rosene, Anderlik $3,388,800 Wastewater Treahnent Facility 2335 W Trunk Hwy 36 Willmar, MN S1. Paul, MN 22113 Richard Turner, P.E. 1996 City of Apple Valley Bonestroo, Rosene, Anderlik $ 130,800 Well No.8 Pumping Facility 2335 W Trunk Hwy 36 Apple Valley, MN St. Paul, MN 55113 Daryl Kirshenman, P.E. Project Proj ect Name ArchitectfEngineer Contract Year and Location and Address Value 1996 City of So. St. Paul Toltz, King, Duvall, Anderson $ 137,900 Waterous Lift Station 444 Cedar St South S1. Paul, MN S1. Paul, MN 55101-2140 Dave Moore, P.E. 1996 City of Arlington Bolton & Menk, Inc. $1,541,400 Water Treatment Facilities 515 N Riverfront Drive Arlington, MN Mankato, MN 56001 Herman Dharmarajah, P.E. 1995 City of Park Rapids B. A. Liesch Associates $7,980,800 Industrial WWTP 13400 15th Ave N Park Rapids, MN Plymouth, MN 55441 James Bullert, P.E. 1995 City of Milford Howard R. Green Company $ 966,400 Water Treatment Plant 309 W 43rd St Ste 101 Milford, IA Sioux Falls, SD 57105 Cecil Coombs, P.E. 1995 City of Little Falls Bonestroo, Rosene, Anderlik $1,014,400 Water Treatment Facility 2335 W Trunk Hwy 36 Little Falls, MN S1. Paul, MN 55113 Miles Jensen, P.E. 1995 City of Pelican Rapids Bonestroo, Rosene, Anderlik $2,139,300 Wastewater Treatment Facilities 2335 W Trunk Hwy 36 Pelican Rapids, MN S1. Paul, MN 55113 Richard Turner, P.E. 1994 City of Cokato Bonestroo, Rosene, Anderlik $3,289,100 Wastewater Treatment Facilities 2335 W Trunk Hwy 36 Cokato, MN S1. Paul, MN 55113 1994 City of Silver Bay RREM, Inc. $1,825,000 Wastewater Treatment Fac. Mod. 301 First S1. , Ste 408 Silver Bay, MN Duluth, MN 55802 Mike Miller, P. E. 1994 White Bear Lake Metropolitan Waste $ 552,508 Lift Station L-5 Replacement Control Commission White Bear Lake, MN S1. Paul, MN Don Norbin, CAR 1994 City of LeSueur Bolton & Menk, Inc. $ 107,000 F orcemain Crossing 515 North Riverfront Drive LeSuer, MN Mankato, MN 56001 Bob Brown, P.E. Project Project Name ArchitectfEngineer Contract Year and Location and Address Value 1994 Blaine Interceptor Metropolitan Waste $ 108,700 Blaine, MN Control Commission Subcontractor to Kenko, Inc. St. Paul, MN 1994 City of Mound McCombs Frank Roos Assoc. $ 445,400 Lift Station Improvements 15050 23rd Ave N Mound, MN Plymouth, MN 55447 1994 City of Two Harbors RustE & I $1,994,400 Wastewater Treatment Facility Imp. 3033 Campus Drive Two Harbors, MN Minneapolis, MN 55441 Doug Tholo, P.E. 1993 U.S. Army Corps of Engineers U.s. Army Corps of Engineers $ 292,400 Sewage Treatment System Exp. 190 5th Street E Crosslake, MN S1. Paul, MN 55101-1638 Joel Rogers, Project Manager 1993 City of Luverne Ulteig Engineering $ 437,100 Wastewater Treatment Facility Minneapolis, MN Luverne, MN Gerald P. Floden, P.E. 1993 City of Albertville Meyer- Rohlin, Inc. $ 801,400 Wastewater Treatment Facility 1111 Hwy 25 North Albertville, MN Buffalo, MN 1993 City of Lake City Wallace Holland Kastler $ 1,501,300 Wastewater Treatment Facility Schmitz & Co. Lake City, MN Ken Boyer, P.E. 1993 City of Sioux Falls HDR, Engineering $ 2,940,800 Potable Water Well Field Expansion Omaha, NE Sioux Falls, SD Glen Dostal, P.E. 1993 City of Apple Valley Bonestroo, Rosene, $ 165,600 Water Pumping Station Anderlik & Assoc. Apple Valley, MN Dick Foster, P.E. 1993 City of Crosby Widseth, Smith, Nolting $ 667,950 New City Hall Construction Alexandria, MN Crosby, MN Paul Ringdahl, AlA 1992 City of Vadnais Heights SEH, Inc. $ 195,950 Pumphouse No.3 - Rehab S1. Paul, Mn Vadnais Heights, MN Steve Campbell, P.E. 1992 MWCC Metropolitan Waste $ 472,840 Misc. Sewer Rehab Projects Control Commission Metro Area Sites, MN S1. Paul, MN Bill Knoff, CAR Project Project Name ArchitectfEngineer Contract Year and Location and Address Value 1992 Waste Water Control Structures S. J. Louis Construction $ 152,000 Subcontractor - Structures 3032 County Road 138 Onamia, MN Waite Park, MN 56387 Chuck Rugroden 1992 MWCC Metropolitan Waste $ 553,000 Blue Lake WWfP Dewatering Control Commission System Phase - II St. Paul, MN Shakopee, MN Bill Johnson, CAR 1992 City of New Hope Bonestroo, Rosene, $ 122,319 Lift Stations 3 & 4 Anderlik & Assoc. New Hope, MN Daryl Kirschenman, P.E. 1992 City of Rogers RCM Associates, Inc. $ 737,300 Wastewater Treahnent Facility Minnetonka, MN Rogers, MN Gary Dorn, P.E. 1992 City of Independence Owen Ayres & Assoc. $ 694,153 St. & Utility Improvement Eau Claire, WI Independence, WI John Iverson, P.E. 1992 City of Renville Bolten & Menk, Inc. $ 1,738,100 Wastewater Treahnent Facility Burnsville, MN Renville, MN R. Kelly Yahnke, Eng. 1992 City of Braham Maier Stewart & Assoc. $ 732,700 Wastewater Treahnent Facility St. Paul, MN Braham, MN Brian Miller, P.E. 1992 City of Bloomington City of Bloomington $ 174,642 Soundwall Construction Engineering Division Bloomington, MN Wayne Force, P.E. 1991 City of Hinckley Bonestroo, Rosene, $ 717,705 TH 23 Reconstruction Anderlik & Assoc. Hinckley, MN Keith Gordon, P.E. 1991 City of Shoreview SEH, Inc. $ 79,625 Lake Owasso Outlet Mod. St. Paul, MN Shoreview, MN Mark Lobermeier, P.E. 1991 City of Andover Toltz, King, Duvall, Anderson $ 36,850 Control Valve Vault St. Paul, MN Andover, MN David Moore, P.E. 1991 City of Grand Rapids Public Utilities Comm. $1,533,600 Wastewater Treahnent Facility Grand Rapids, MN Grand Rapids, MN Norm Mattson, P.E. Project Project Name Architecf/Engineer Contract Year and Location and Address Value 1991 MacMillan Bloedel, Ltd. PS&E, Ltd. $ 135,800 Pneumatic Foundation Richmond, BC, Canada Deerwood, MN Rod DeSequera, P.E. 1991 City of Randall RCM Associates, Inc. $ 1,231,600 Wastewater Treatment Facility Minnetonka, MN Randall, MN Gary Darn, P.E 1991 City of Ogilvie Bonestroo, Rosene, $ 630,800 Wastewater Treatment Facility Anderlik & Assoc. Ogilvie, MN St. Paul, MN Mark D. Wallis, P.E. 1991 City of Mora Mora PUC $1,488,000 Wastewater Treatment Facility Mora, MN Mora, MN John McLouth, Owner's Rep. 1991 College of Saint Thomas Toltz, King, Duvall, Anderson $ 334,425 Sewer Separation Project St. Paul, MN St. Paul, MN John Powell, P.E. 1991 City of Cottage Grove Metropolitan Waste $ 239,400 Wastewater Dechlorinator Control Commission Cottage Grove, MN St. Paul, MN Joe Betthauser, CAR 1991 City of Jordan Bolten & Menk $ 316,736 TH - 21 Improvements Mankato, MN Jordan, MN R. Kelly Yahnke, Eng. 1991 Lino Lakes SEH, Inc. $ 413,255 Pheasant Hills Preserve St. Paul, MN 1991 City of Farmington City Engineering Dept. $ 469,386 Spruce St. Improvements Farmington, MN Farmington, MN Tom Kaldonski, P.E. 1990 MacMillan Bloedel PS&E Ltd. $ 481,328 Fire Protection Syst. Richmond, BC, Canada Deerwood, MN Rod DeSequera, P.E. 1990 City of St. Paul Public Works Dept. $1,031,504 Ar lingtonj Western St. Paul, MN Comb. Sewer Separation Larry Leuth, P.E. St. Paul, MN 1990 City of Farmington City Engineering Dept. $ 620,000 Utility Improvements Farmington, MN Farmington, MN Thomas Kaldonski, P.E. Project Project Name Architect/Engineer Contract Year and Location and Address Value 1990 Metro Waste Control Com. Metropolitan Waste $ 1,900,000 Meter Station Improvements Control Commission St. Paul, MN St. Paul, MN Jim Chapdelaine, CAR 1989 City of Grand Rapids Public Utilities Comm. $ 545,291 Pokegama Ave & 8th St. Grand Rapids, MN Grand Rapids, MN 1989 MCI Telecommunications MCI Telecommunication $ 507,224 Fiber Optic Cable Syst. Richardson, TX Minneapolis, MN Horace Mills, Eng. 1989 City of Genola Dept. of Trans. $ 455,518 Transportation Building St. Paul, MN Genola, MN John Hanson, P.E. 1988 City of Farmington City Engineering Dept. $ 277,742 St. & Utility Improvement Farmington, MN Farmington, MN Thomas Kaldonski, P.E. 1988 MN DOT I "Croft Mine" MN DOT Engineering $ 350,000 Simulated Mine Shaft St. Paul, MN Crosby, MN Ray Hanson, P.E. 1988 AT&T Communications Finley Engineering $ 780,000 Fiber Optic Cable Eau Claire, WI Fargo, ND David Cheney, P.E. 1988 AT&T Communications Bucher Willis Ratlift $ 1,100,000 UIG Conduit Installation Aurora, IL Medford, MN Gerald Memming, Eng. 1987 City of Northfield City Engineering Dept. $ 200,000 Utilities Improvements Northfield, MN N orthfield, MN Bruce Bullow, P.E. 1987 City of Hinckley Boonestroo, Rosene, $ 520,000 Waste Water Treabnent Plant Anderlik & Assoc. Hinckley, MN Michael Lynch, r.E. 1987 City of Eden Prairie City Engineering Dept. $ 375,000 Grading & Box Culverts Eden Prairie, MN Eden Prairie, MN Rodney Rue, P.E. 1987 City of Lakeville Donohue & Assoc. $ 350,000 Oak Shores Utilities Maple Grove, MN Lakeville, MN Steve Bulle, P.E. Project Project Name Architecf/Engineer Contract Year and Location and Address Value 1987 City of Crosby Crow Wing Co. Eng. Dept. $ 750,000 Grading, UtiI. & Struct. Brainerd, MN Crosby, MN Dwayne Blanck, P.E. 1986 Mills Fleet Farm Widseth Smith Nolting $ 250,786 Utilities & Grading Brainerd, MN Lakeville, MN Bruce Buxton, P.E. 1986 City of Pine City Howard A. Kuusisto $ 28,591 Indust. Park Watermain St. Paul, MN Pine City, MN Howard Kuusisto, P.E. 1986 City of Apple Valley Bonestroo, Rosene, $ 721,539 The Oaks III Utility Anderlik & Assoc. Improvements St. Paul, MN Apple Valley, MN Keith Gordon, P.E 1986 City of Northfield City Engineering Dept. $ 636,961 Utilities & Grading Northfield, MN Northfield, MN Bruce Ballert, P.E. 1986 City of Burnsville Orr-Schelen- Mayeron $ 184,576 Roma Lorna Storm Sewer & Assoc. and Appurtenant Work Minneapolis, MN Burnsville, MN E. H. Anderson, P.E. 1985 City of Sandstone Howard Kuusisto $ 28,740 Storm Sewer Improvement St. Paul, MN Sandstone, MN Howard Kuusisto, P.E. 1985 City of Long Prairie Larson-Peterson $ 300,000 Watermain Improvements Detroit Lakes, MN Long Prairie, MN Thomas Augustin, P.E. 1985 Melrose Telephone Co. C C & I Engineering $ 139,500 Telephone Conduit Fargo, ND Melrose, MN Curtis Jacobson, P.E. 1985 City of Sartell Williamson-Kotsmith Inc. $ 96,043 San. Sewer & Watermain St. Cloud, MN Sartell, MN Sydney Williamson, P.E.