STAFF AGENDA REPORT
AGENDA #:
PREPARED BY:
8C
GREG ILKKA, DIRECTOR OF PUBLIC WORKS/CITY
ENGINEER
CONSIDER APPROVAL OF RESOLUTION 97-XX ORDERING
PREP ARA TION OF FEASIBILITY REPORT FOR MUSHTOWN
ROAD, PIKE LAKE TRAIL, CSAH 42, STREET SEALCOA TING
AND LAKE FRONT PARK INCREMENT IMPROVEMENTS
JANUARY 21, 1997
SUBJECT:
DATE:
INTRODUCTION:
The purpose of this Agenda item is to initiate the process for local
improvements set forth in the 1997 portion of the 1997-200 I Capital
Improvement Program in accordance with Minnesota Statutes, Chapter
429. The first step in the process is for the Council to order preparation
of a Feasibility Report on improvement projects. The Feasibility Report
will address the upgrading of Mushtown Road from 1,000 feet south of
Tower Street to the southeast for 2,700 feet to a point approximately 200
feet beyond Ridgewood Court; upgrading of Pike Lake Trail from
CSAH 42 to the proposed north plat line in the plat of Knob Hill in
Section 26, Township 115 north, Range 22 west; upgrading CSAH 42
from Ferndale Ave. to CSAH 21; Lakefront Park roads, trails, and
parking lots; and sealcoating of bituminous paved streets throughout the
City.
BACKGROUND:
Each of these projects is in the 1997 Capital Improvement Program. The
Mushtown Road and Pike Lake Trail projects require special
assessments and therefore require the City to follow the requirements of
MS Chapter 429. These projects will be used as leverage to bond for the
financing of the CSAH 42 and Lakefront park improvements, as well as
for the sealcoating projects. If the Parks and Library Bond Referendum
is approved, the Lakefront Park Improvements contemplated herein
would be deleted.
DISCUSSION:
The City is required to assess a minimum of 20% of the cost of a public
improvement project completed through the Chapter 429 process and
financed through G.O. bonds. By combining Mushtown Road and Pike
Lake Trail projects with the CSAH 42, Lakefront Park and street
sealcoating projects, the City will meet the minimum assessment
requirement and be able to bond for the other improvement projects.
The City does not expect to be able to assess anyone for the
improvements on the CSAH 42, Lakefront Park and street sealcoating
projects because of statutory issues of special benefit. The Feasibility
Report will determine the costs of the improvements and methods of
162@@l~e Creek Ave. S.E., Prior Lake. Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY E:V1PLOYER
ALTERNATIVES:
RECOMMENDATION:
ACTION REQUIRED:
CIP429.DOC
financing. Feasibility Reports for Mushtown Road and Pike Lake Trail
have previously been authorized and prepared by MSA. These will be
updated by City staff to reflect current cost estimates or changes in
project scope.
There are three alternatives for the City Council to consider:
I. Approve Resolution 97-XX which orders preparation of a Feasibility
Report for Mushtown Road, Pike Lake Trail, CSAH 42, Lakefront
Park, and street sealcoating.
2. Deny this item for a specific reason and provide staff with direction.
3. Table this item until some date in the future.
Alternative No.1. By separate memo, 1 will provide the City Council
with a status report regarding the remaining Capital Improvement
Program Improvement Projects.
,
/
A1motion an,d s~~nd to/adopt Resolution 97-XX.
, ( :
. . Llci lrt/'-~
REVIEWE~ ) ..
/ /
I I
( "
.~
RESOLUTION 97-XX
ORDERING PREPARATION OF FEASIBILITY REPORT
FOR
MUSHTOWN ROAD, PIKE LAKE TRAIL, CSAH 42, STREET SEALCOATING,
AND LAKE FRONT PARK INCREMENT IMPROVEMENTS
MOTION BY:
SECOND BY:
WHEREAS, it is proposed to construct improvements within the following generally described project
area:
1. Mushtown Road from approximately 1,400 feet south of Tower Street to the southeast for
approximately 2,700 feet to Ridgewood Court by the construction of sanitary sewer and
watermain stubs, storm sewer, grading, aggregate base, concrete curb and gutter, bituminous
surfacing, bituminous path, and appurtenant work: and
2. Pike Lake Trail from CSAH 42 to the proposed north plat line in the plat of Knob Hill in Section
26, Township 115 north, Range 22 west, by the construction of sanitary sewer, watermain. storm
sewer, grading, aggregate base, concrete curb and gutter, bituminous surfacing, concrete
sidewalk, bituminous path, retaining walls, and appurtenant work; and
3. CSAH 42 from Ferndale Ave. to CSAH 21 by the construction of grading, storm sewer, utility
crossings, concrete curb and gutter, bituminous surfacing, sidewalk. and appurtenant work; and
4. The sealcoating of bituminous paved streets throughout the City.
5. Paving of Lakefront Community Park roads, trails and parking lots by the construction of
grading, storm sewer, aggregate base, concrete curb and gutter, bitum inous surfacing, and
appurtenant work, and
WHEREAS, it is proposed to assess the benefited property for all or a portion of the cost of the
improvements, pursuant to Minnesota Statutes, Chapter 429,
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA, that the proposed improvements be referred to the City Engineer for study and that he is
instructed to report to the Council with all convenient speed advising the Council in a preliminary way as
to whether the proposed improvements are feasible and as to whether they should best be made as
proposed or in connection with other improvements, and the estimated costs for the improvements as
recommended.
162El~Hi~le Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
Passed and adopted this 21st day of January, 1997.
YES
Andren
Greenfield
Kedrowski
Mader
Schenck
Andren
Greenfield
Kedrowski
Mader
Schenck
{ Seal}
Frank Boyles
City Manager
City of Prior Lake
CIP429.DOC
MQ
n