HomeMy WebLinkAbout4F - MSA Assignment to HRG
STAFF AGENDA REPORT
AGENDA #:
PREPARED BY:
DATE:
4F
GREG ILKKA, DIRECTOR OF PUBLIC WORKS/CITY
ENGINEER
CONSIDER APPROVAL OF CONSENT TO MSA CONSULTING
ENGINEERS ASSIGNMENT OF CONTRACTS TO HOWARD R.
GREEN COMPANY
JUNE 16, 1997
SUBJECT:
INTRODUCTION:
The purpose of this Agenda item is to consider approval of MSA's
assignment to Howard R. Green (HRG) of the existing
agreements and contracts between the City and MSA.
BACKGROUND:
MSA combined its business operations with HRG as of May 16,
1997. As a houskeeping issue for MSA they need to obtain the
Citys written consent for the assignment to HRG of our existing
agreements and contracts.
DISCUSSION:
The attached letter from MSA gives more specifics of this merger.
As indicated, apart from this assignment the terms and conditions
of our existing agreements and contracts will remain unchanged.
Current operating procedures and Project Managers do not
change. Mr. Craig Ebeling will remain as our main contact with the
company. With time, the name MSA will disappear, however, the
same personnel will continue to serve our engineering needs.
ISSUES:
With this merger comes the potential for reduced service. I have
discussed this with Mr. Ebeling and he assures me that this
merger will be transparent to their clients and that we will actually
experience a significantly enhanced level of service due to
increase capabilities. As it is my intention to establish a pool of
consultants for the City to work with prior to next construction
season, I believe this gives HRG every incentive to provide the
City with outstanding service.
ALTERNATIVES:
The alternatives are:
1. Approve consent to MSA's assignment to HRG of the existing
agreements and contracts between MSA and the City of Prior
Lake and authorize the City Manager to sign the Consent to
Assignment as part of the Consent Agenda.
16200~Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
RECOMMENDATION:
ACTION REQUIRED:
MSAHRG.DOC
2. Remove this item from the Consent Agenda.
3. Deny this item for a specific reason and provide staff with
direction.
4. Table this item until some date in the future.
Alternative No. 1
A motion and second to approve the recommended alternative.
IUS
CO~SEL TlNG ENGINEERS
1326 Energy Pork Drive
SI. Paul, MN 55108
612-64.4-4389
1.800-888-2923
Fax: 612-644-9446
CiVil ENGINEERING
ENVIRONMENTAL
MUNICIPAL
PlANNING
SOLID WASTE
STRUCTURAL
SURVEYING
TRAffiC
TRANSPORTATION
ElECTRICAll MECHANICAL
ENGINEERING:
HVAC
POWER DISTRIBUTION
SCADA
SYSTEM CONTROLS
OFFICES IN:
MINNEAPOLIS
PRIOR LAKE
ST. PAUL
W ASECA
May 19, 1997
Mr. Greg Ilkka
Director of Public Works/City Engineer
City of Prior lake
16200 Eagle Creek Avenue
Prior Lake, MN 55372-1714
J1~
Jt4y 0&.....
~ 0 --''4r
(99,>
RE: ANNOUNCEMENT OF COMBINATION WITH HOWARD R.
GREEN COMPANY, AND CONSENT TO ASSIGNMENT OF CONTRACTS
Dear ?\1r. Ilkka:
We are very pleased to advise you that Maier Stewart and Associates, Inc. (MSA) has
combined its business operations with Howard R. Green Company (HRG) pursuant to
the terms of an Asset Purchase Agreement. HRG has developed a sterling reputation in
their 80 + years of operation in the Midwest. HRG' s principal office is located in Cedar
Rapids, Iowa, and it also has offices in Des Moines, Iowa City, and Sioux Falls, South
Dakota.
The combination of our staff with the staff of HRG will allow HRG to provide a
significantly enhanced level of service to you. HRG will deliver the same services that
we have provided in the past, such as general municipal engineering, traffic and
transportation engineering, and water treatment engineering, as well as being able to
provide services that we could not provide before, such as mechanical and electrical
engineering and airport services. As a result of the combination of the operations of
MSA and HRG, you will have the benefit of working with a full service professional
engineering company.
What has made this combination so appealing to us is that we are able to gain all of the
strengths associated with the ability to provide enhanced services, without losing the
personal contacts that MSA has with you. Our professional engineers and other technical
people will be joining HRG as part of the combination and will continue to work for you
from our same office in St. Paul, as we always have.
We finalized all of the legal work for the combination on May 16, 1997. MSA has
agreed to assign to HRG all of MSA's rights and obligations under any and all existing
contracts and agreements between MSA and you. HRG will assume MSA's obligations
under such contracts and agreements. Apart from the assignment, the terms and
conditions of the agreements and contracts will remain unchanged.
One of the housekeeping items that we need to address as part of this process is to obtain
your written consent to MSA's assignment to HRG of the existing agreements and
contracts between MSA and you.
An Equal Opportunity Employer
We would respectfully request that you consent to MSA's assignment to HRG of the
existing agreements and contracts between MSA and you by signing as indicated below
and returning a copy to the undersigned by facsimile at 612-644-9446 and by regular
mail to the address noted above. We would appreciate a response by May 30, 1997.
Weare very proud to become associated with Howard R. Green Company and we very
much look forward to continuing our relationship with you through HRG. If you have
any questions concerning this letter, or if it may not be possible for you to respond by
May 30, 1997, please call me. If you have specific questions about HRG and the
broadened services our combined company can offer, we invite you to call Mr. Ralph
Russell, who is president and CEO of HRG. Ralph can be contacted at 1-800-728-7805.
If you would prefer a personal visit, Ralph would be happy to meet your schedule and
arrange a visit wiL~ you.
Yours truly,
MAIER STEWART AND ASSOCIATES, INC.
~~~
CraIg L. Ebeling, P.E.
Manager of Operations
CLE:tw
Enclosure
OOI-0602.may
CONSENT TO ASSIGNMENT
The undersigned hereby consents to the assignment by MSA to HRG of existing contracts
between MSA and the undersigned as outlined above. The person signing below
acknowledges that he or she has the authority to sign this consent on behalf of the
undersigned.
day of
, 1997.
Dated this
City of Prior Lake
By: Mr. Greg Ilkka
Director of Public W orIes/City Engineer