HomeMy WebLinkAbout4C - Northwood Road Project # 94-02 Change Order STAFF AGENDA REPORT CONSENT AGENDA #: PREPARED BY: 4D GREG ILKKA, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER CONSIDER APPROVAL OF CHANGE ORDER NO.2 TO THE NORTHWOOD RD. PROJECT #94-02 IN THE AMOUNT OF $4,633 TO INSTALL A RETAINING WALL. JULY 7,1997 SUBJECT: DATE: INTRODUCTION: The purpose of this Agenda item is to consider approval of a change order to the Northwood Rd. project to install an additional retaining wall. BACKGROUND: During the construction of Northwood Rd. at the intersection of Fremont Ave. the intersection was shifted to the north to connect with the existing corner radius (curb). In doing so, the north curb of Northwood Rd. became much closer to an existing tree line. To save the trees, the original slope needed to be changed from a maintainable 1:3 to a non-maintainable 1 :2. The sod that was laid last fall never established itself. As a result, the property owner contacted us expressing concern about this situation. DISCUSSION: The solution to this steep slope is a retaining wall. Had the project been designed as modified in the field, the retaining wall would have been included. It was determined that a wall approximately 3 feet high by 70 feet long would suffice at this location. The contractor has provided a price for doing this work (copy attached) not to exceed $4,633. There are other retaining walls in the contract which were contemplated in the original bid. However, because this wall was not anticipated at the time the others were constructed the contractor incurs additional expense for installing this wall, and consequently is seeking a higher price. It is not reasonable, nor would the original contract support a demand by the City that the work be completed at the original bid prices. The price given is reasonable considering: inflation, more than a year has elapsed since bidding; mobilization costs, and prime contractor's mark-up on his sub-contractors work. 162~~g1~Otr~ek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER INCORPORATED SOUTH OFFICE 8800 13th AVENUE EAST SHAKOPEE, MN 55379 PHONE (612) 445-8615 FAX(612)44~355 __ 9_0__. .__.__.__ _... NORTH OFFICE 4105 85th AVENUE NORTH BUILDING B SUITE 203 BROOKLYN PARK, MN 55443 PHONE (612) 425-2988 j 7 19S1 I April 15, 1997 \G7--0l-~-~C) , Mr. Paul Boettcher, P.E. MSA Consulting Engineers 1326 Energy Park Drive St. Paul, MN 55108 RE: Northwood Road, Prior Lake V.P. job no.: 806-6 Dear Paul, The following is in regards to the additional retaining wall on the above project. Mobilization, excava~_~ !~r_r~~g~a.J!~_ ~()ci~?!J?lo~kwalL(O":3') __ -..---.-.'.. ._,----. $3 1 i i nn_ -.. --.. , -----.. -- Restoration, sod etc. will be billed on a time & material basis not to exceed $1,500.00. Utility relocation charge is not included. If you have any questions, please do not hesitate to call for further assistance. Sincerely, VALLEY PAVING, INC. , ~~~;: ard A. Carron President RAC:lrb t1e 'I ~~~,-j 4-j \~/91 ~ . A ASPH"~ ~ 100% RECYCLABLE Affirmative Action I Equal Opportunity Employer