SEPTEMBER 4, 2007
5B
LARRY POPPlER, ASSISTANT CITY ENGINEER
CONSIDER APPROVAL OF TWO RESOLUTIONS ACCEPTING PROPOSALS
AND AWARDING THE CITY'S STANDARDIZED CONTRACT FOR THE 2008
AND 2009 IMPROVEMENT PROJECT DESIGN SURVEY AND
GEOTECHNICAL SERVICES FOR THE 2008 AND 2009 IMPROVEMENT
PROJECTS
Introduction
The purpose of this agenda item is to accept the proposals for professional
services related to surveying and geotechnical exploration for the 2008 and 2009
Improvement Projects. This action is necessary because the professional
services appointment process will not be completed until November.
Historv
On July 16, 2007, the City Council passed Resolution #07-127 authorizing the
preparation of the Feasibility Report for the 2008 Improvement Project. The
Feasibility Report will address street reconstruction in the Brooksville Hills
neighborhood. In particular for the following streets: Brooks Circle, Filmore
Avenue, and Itasca Avenue south of Summer Street. In 2009, the CIP shows
street reconstruction for the remainder of the Brooksville Hills neighborhood
including: Mandan Avenue, Franklin Circle, Robinson Circle, Summer Street and
Itasca Avenue from Summer Street to Crossandra Street. A separate Feasibility
Report will be prepared for the 2009 Reconstruction Project.
In anticipation of these projects the City of Prior Lake must perform surveying
and soil analysis for these projects. City Staff has asked the consultants
proposing on these items to provide costs for both the 2008 and 2009 projects.
If deemed appropriate, these consultants could complete the 2009 surveying and
soil analysis during the same mobilization this year. This also provides the City
with the advantage of previewing the 2009 reconstruction area for the design of
the 2008 project. Since these projects are adjacent, details at the connection
points can be analyzed to a greater extent.
Current Circumstances
The Engineering Division has already begun the preparation of the Feasibility
Report for the 2008 Improvement Project. The surveying and geotechnical
exploration will provide the details necessary to provide a more detailed report.
Surveying
Staff has requested proposals from three firms for surveying of the 2008 and
2009 project areas. They include: Bolton and Menk, WSB and Associates, and
MFRA. Each of these firms has a positive history of surveying and construction
staking services for the City of Prior Lake. The bids received by these firms are
tabulated below:
www.cityofpriorlake.com
i\()9 04 tJ7\,\c"RhON@!Ilj)"5(!l";44%.~OOI10 :fla\X~.a$4:r:4245
Bolton and Menk
WSB and Associates
MFRA
$6,500.00
$8,000.00
$14,500.00
$5,630.00
$8,000.00
$11,800.00
$12,130.00
$16,000.00
$26,300.00
The proposals received were each analyzed and City Staff is recommending that
Bolton and Menk perform the 2008 and 2009 surveying for the City of Prior Lake.
Bolton and Menk has recently performed the surveying for part of the 2005
Street Improvement Project. They have also worked in Prior Lake on additional
projects including: the Water Treatment Facility, County Road 12, and the
Industrial Park Feasibility Report.
Geotechnical Exploration
Staff has requested proposals from three firms for geotechnical exploration.
They include: American Engineering Testing, Braun Intertec, and Stork Twin City
Testing. Each of these firms has previously completed work for the City of Prior
Lake. The bids received are tabulated below:'
$4,837.50
$7,950.00
$10,900.00
ISSUES:
The proposals received were each analyzed and City Staff is recommending that
Stork Twin City Testing be selected to perform the 2008 and 2009 geotechnical
exploration for the City of Prior Lake. Stork Twin City Testing recently performed
the construction testing for City utilities on the 2007 County Road projects.
Surveying services for a project of this size are beyond the scope of what the
City can provide in house with limited personnel and equipment. The consultant
can provide the digital survey in a more expedient manner which in the end
allows this project to be bid earlier in the year for possibly a better bid price.
The City does not have the expertise or equipment to complete the geotechnical
services in-house.
FINANCIAL
IMPACT:
ALTERNATIVES:
The surveying and geotechnical exploration will be funded through the
Construction Fund for these two projects.
The alternatives are as follows:
1. Approve two resolutions (1) Awarding the City's Standardized Contract for
Professional Services with Bolton and Menk for 2008 and 2009 Improvement
Project Design Survey (2) Awarding the City's Standardized Contract for
Professional Services with Stork Twin City Testing for 2008 and 2009
Improvement Project Design Geotechnical Services.
2. Table the Resolution for a specific reason.
3. Deny the Resolution.
RECOMMENDED
MOTIO
Review
rnative # 1
R:/( cuncillAgendn j.
. '1/IAccepl bids surveying and j !(-,Ir 2008 and -"/.,fdoc
RESOLUTION AWARDING THE CITY'S STANDARDIZED PROFESSIONAL SERVICES CONTRACT
TO STORK TWIN CITY TESTING FOR THE 2008 AND 2009 IMPROVEMENT PROJECT
GEOTECHNICAL SERVICES
Motion By:
Second By:
WHEREAS, Geotechnical exploration is a necessary service needed to properly install City
infrastructure; and,
WHEREAS, Geotechnical exploration is needed for the both the 2008 and 2009 Improvement
Projects; and,
WHEREAS, The City does not have the equipment or expertise to provide these services in-house;
and,
WHEREAS,
$4,837,50
$7,950.00
$10,900.00
WHEREAS, City Staff recommends award of the City's Standardized Professional Services Contract
to Stork Twin City Testing for the 2008 and 2009 Improvement Project Design
Geotechnical Services.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. The Mayor and City Manager are authorized to execute the City's Standardized Professional
Services Agreement with Stork Twin City Testing for a not to exceed amount of $4837.50.
3. Funding for these engineering services will be drawn from Account #501-48364-505.
PASSED AND ADOPTED THIS 4TH DAY OF SEPTEMBER 2007.
YES
NO
Haugen Haugen
Erickson Erickson
Hedberg Hedbera
LeMair LeMair
Millar Millar
Frank Boyles, City Manager
R:\CcuncillAgenda Reports\2007\09 04 07\accept bid;) fo~<aViM~<i3~r~lion,doc
Phone 952.447.9800 / Fax 952.447.4245
RESOLUTION AWARDING THE CITY'S STANDARDIZED PROFESSIONAL SERVICES CONTRACT
FOR SURVEYING OF THE 2008 AND 2009 IMPROVEMENT PROJECT TO BOLTON AND MENK
Motion By:
Second By:
WHEREAS, Surveying is necessary service needed to properly install City infrastructure; and,
WHEREAS, Surveying is needed for the both the 2008 and 2009 Improvement Projects; and,
WHEREAS, The City received the following proposals for services:
Bolton and Menk
WSB and Associates
MFRA
$6,500.00
$8,000.00
$14,500.00
$5,630.00
$8,000.00
$11,800.00
$12,130.00
$16,000.00
$26,300.00
The low proposal was submitted by Bolton and Menk; and
WHEREAS, City Staff recommends award of the City's Standardized Professional Services Contract
to Bolton and Menk for the 2008 and 2009 Improvement Project surveying.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. The Mayor and City Manager are authorized to execute the City's Standardized Professional
Services Agreement with Bolton and Menk for a not to exceed amount of $12,130.00.
3. Funding for these engineering services will be drawn from Account #501-48364-505.
PASSED AND ADOPTED THIS 4TH DAY OF SEPTEMBER 2007.
Hauaen Hauaen
Erickson Erickson
Hedbera Hedbera
LeMair LeMair
Millar Millar
YES
NO
Frank Boyles, City Manager
R\Counl"'fJ\genda Reporl':'<.007\09 04 (YT,.':cept bids fo~~~~~~W~~~O!U;;;,dOC
Phone 952.447.9800 / Fax 952.447.4245