CITY COUNCIL AGENDA REPORT
November 5, 2007
5B
Frank Boyles, City Mana
CONSIDER APPROVAL F C NGE ORDER #6, POLICE STATION AND
CITY HALL PROJECT
Introduction
The purpose of this agenda item is to request Council approval for change order
number six for the Police Station/City Hall project.
Historv
The Police Station/City Hall construction projects are largely done, but the
Owner's Representative continues to review change order requests made by
Shaw Lundquist during the course of the project.
Current Circumstances
The attached change order includes nineteen additions to the project and one
reduction. Each item has been verified by the Owner's Representative as
appropriate.
Conclusion
The Council should determine whether it wishes to approve this change order
request.
The process of reviewing change orders will continue. The Owner's
Representative has informed us that there is likely to be one more change order
request in the approximate amount of $24,000 before the project is closed out.
A total of $11,407,800 was earmarked for construction costs including
contingency. To date the base bid and change orders one through five amounts
to $11,346,020. The addition of this $37,997 change order brings the
construction costs to $11,384,017. Once the last change order has been
finalized, we will bring it to the City Council together with a reconciliation of the
entire project. The Owner's Representative believes that the total cost, with all
change orders, will be at or below the total funds budgeted.
1. Approve change order #6 as part of the consent agenda.
2, Take no action and direct the staff to prepare additional information.
RECOMMENDED Alternative #1.
MOTION:
www.cityofpriorlake.com
Phone 952.447.9800 / Fax 952.447.4245
II
SHAW-LUNDQUIST
ASSOCIATES INC
Letter of Transmittal
To: City of Prior Lake
16200 Eagle Creek Ave. SE
Prior Lake, MN 55372
Attn: Frank Boyles
Date: 10/9/2007
Project: Prior Lake Police
Station and City Hall
Project No: 5419
PER: X Attached
Under Separate Cover
ITEMS: Prints SENDING:
Plans
Specifications
Shop Drawings
Samples
Copy of Letter
X Change Order
Other
VIA: 3-Hour
UPS
Overnight
X Mail
3 hour
For Approval
Approved as Submitted
Approved As Noted
Returned For Corrections
Resubmit Copies for Appvl.
Submit Copies for Distrb.
For Review and Comment
For Your Use
As Requested
-. -- -- ~_.~._---_._._-----_._-------------------- - _.._------._--.--
Copies Date Section No. Description
3 Owner Change Order # 6
REMARKS:
Please sign and return one fully,executed copy to Shaw Lundquist Assoc. Thank you,
SIGNED:
l't
(
COPIES:
GENERAL CONTRACTORS I DESIGN-BUILDERS I CONSTRUCTION MANAGERS
2757 West Service Road . Saint Paul MN 55121 · t 651454 0670 · f 6514547982 . shawlundquist.com
AN EQUAL OPPORTUNITY EMPLOYER
RECEIVED
OCT 1 6 2007
~:;AIA Document G701M - 2001
Change Order
PROJECT (Name and address):
City of Prior Lake - New City Hall
Police Station
Dakota and Arcadia Streets
Prior Lake, Minnesota 5372
CHANGE ORDER NUMBER: Six (6)
DATE: October 3, 2007
TO CONTRACTOR (Name and address):
Shaw-Lundquist Associates, Inc.
2757 West Service Road
St. Paul, Minnesota 55121
ARCHITECT'S PROJECT NUMBER: 042181
CONTRACT DATE: September 19, 2006
CONTRACT FOR: General Construction
OWNER: D
ARCHITECT: D
CONTRACTOR: D
FIELD: D
OTHER: D
THE CONTRACT IS CHANGED AS FOLLOWS:
(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives)
GCPR #17
PR #46
PR#5IR
PR #59
PR #60
PR #61
PR #67
PR #68
PR #70
PR#71
PR #72R
PR #77
PR#81
PR #82R
PR #83R
SI#126
SI #187
SI #213
SI #221
SI#222
Connection to sewer not shown on survey
Drain pipe from Police rain garden
City Hall Canopy framing
Sidewalk at Police Station discharge
Building numbers added
Stepped curb at Police exposed brick ledge
Eliminate coat rack and provide receptacles in City Hall
Finish steel angle ends at City Hall
Fire smoke dampers per building official
Credits for access panels not used
Ventilation for elevator hoistway
Added sidewalk in front of City Hall
Revise paneling and paint at utility billing-T & M
Provide 2 light switches at Police Lobby
Card access and hardware changes after occupancy
Revised roof framing City Hall Vestibule
Change glazing Police cell doors
Control cards for variable speed drives
Revise light fixture types City Hall toliet rooms
Handrails supports at top of stair
Add
Add
Add
Add
Add
Add
Add
Add
Add
Deduct
Add
Add
Add
Add
Add
Add
Add
Add
Add
Add
TOTAL FOR CHANGE ORDER NO.6
ADD
The original Contract Sum was
The net change by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sum will be increased by this Change Order in the amount of
The new Contract Sum including this Change Order will be
The Contract Time will be unchanged by Zero ( 0 ) days.
The date of Substantial Completion as of the date of this Change Order therefore is August 31, 2006
$ 689.00
$ 1,398.00
$ 2,466.00
$ 309.00
$ 599.00
$ 704.00
$ 204.00
$ 988.00
$ 1,306.00
$ 268.00
$12,942.00
$ 1,105.00
$ 1,188.00
$ 1,220.00
$ 5,298.00
$ 3,782.00
$ 941.00
$ 2,285.00
$ 291.00
$ 550.00
$37,997.00
$
$
$
$
$
11,157,800.00
188,220.00
11,346,020.00
37,997.00
11,384,017.00
NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which
have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
AlA Document G701™ -2001. Copyright @ 1979,1987,2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AlA"
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA" Document, or any 1
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document
was produced by AlA software at 10:28:12 on 10/03/2007 under Order No.1 000282438_3 which expires on 1/30/2008, and is not for resale.
User Notes: (3513433897)
I
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
Wold Architects and Engineers
ARCHITECT (Firm name)
Shaw-Lundquist Associates, Inc.
CONTRACTOR (Finn name)
City of Prior Lake
OWNER (Finn name)
~
. ~
BY (Signat re)
.~~ M-6jE^
(Typed name) ~
J[.)/~ 07
DATE '
ADDRESS
BY (Signature)
(Typed name)
DATE
AlA Document G701'u - 2001. Copyright @ 1979, 1987,2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AlA'"
Document is protected by U.S. Copyright law and International Treaties. Unauthorized reproduction or distribution of this AlA'" Document, or any 2
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document
was produced by AlA software at1 0:28:12 on 10/03/2007 under Order NO.1 000282438_3 which expires on 1/30/2008, and is not for resale.
User Notes: (3513433897)