HomeMy WebLinkAboutSprinkler Inspection Report 2007
I nspection Report
GILBERT MECHANICAL CONTRACTORS, INC.
4451 w. 76th St. - Minneapolis, MN 55435
Office phone 952-835-3810 Fax 952-835-4765
Inspection # 2616
Inspection Date: 09/24/2007
Billing Information:
Name:
Job Information:
North Lake Office Center #3
14162 Commerce Avenue Northeast
Prior Lake, MN 55372
Address:
------
-~--
Yes
N/A
a. Is the building occupied? X I
b. Is occupancy same as previous inspection? X I
c. Are all the systems in service? X
d. Are all fire protection systems same as last inspection? X ..
e. Is hazard completely sprinkled? x
f. Are all new additions and building changes properly protected? X
g. Is all stock or storage properly below sprinkler piping? X
h. Was property free of fire since last inspection? (Explain any fire on Page 2) x
I. In areas protected by wet system, does the building appear to be properly heated in all areas, including blind attics X
and perimeter areas and are all exterior openings protected against entrance of cold air? x
2. CONTROL VALVES (See Section 16)
a. Are all sprinkler system main control valves open?
b. Are all other valves in proper position?
c. Are all control valves in good condition and sealed or supervised?
3. WATER SUPPLIES (See Section 17)
a. Was a water flow test made and results satisfactory?
4. TANKS. PUMPS. FIRE DEPARTMENT CONNECTIONS
a. Are fire pumps, gravity tanks, reservoirs and pressure tanks in good condition and properly maintained?
b. Are fire department connections in satisfactory condition, couplings free, caps in place and check valves tight?
5. WET SYSTEMS (See Section 13)
Yes
N/A
No'
a. Are cold weather valves open or closed as necessary? X
b. Have antifreeze systems been tested and left in satisfactory condition? X
c. Are alarm valves, water flow indicators and retards in satisfactory condition? x
6. DRY SYSTEMS (See Section 14)
Yes
N/A
No'
a. Is dry valve in service and in good condition? X
b. Is air pressure and priming water level normal? X
c. Is air compressor in good condition? X
d. Were low points drained during fall and winter inspection? X
e. Are Quick Opening Devices in service? X
f. Has piping been checked for stoppage within past 10 years? X
g. Has piping been checked for proper pitch within past 5 years? X
h. Have dry check valves been trip tested satisfactorily as required? X
I. Are dry valves adequately protected from freezing? X
j. Valve house and heater condition satisfactory? X
7. SPECIAL SYSTEMS (See Section 181
Yes
N/A
No'
a. Were valve systems tested as required? X
b. Were all heat responsive systems tested and results satisfactory? X
c. Were supervisory features tested and results satisfactory? X
8. ALARMS
Yes
N/A
No'
a. Water motor and gong test satisfactory? X
b. Electric alarm test satisfactory? X
c. Supervisory alarm service test satisfactory? X
9. SPRINKLERS - PIPING
a. Are all sprinklers in good condition, not obstructed, and free of corrosion or loading?
b. Are all sprinklers less than 50 years old?
c. Are extra sprinklers readily available?
d. Is condition of piping, drain valves, check valves, hangers, pressure gauges, open sprinklers, strainers satisfactory?
e. Are all sprinklers of proper temperature rating?
f. Are portable fire extinguishers in good condition?
g. Is hand hose on sprinkler systems satisfactory?
Yes
N/A
No'
*Explain "No" answers on Page 2
GILHERT MECHANICAL CONTRACTORS, INC.
4451 w. 76th SI. - Minneapolis, MN 55435
Date: 09/24/2007
Inspection # 2616
Inspector: Dean Kaminski
10. Date Dry System Piping last checked for stoppage:
11. Date Dry System Piping last checked for proper pitch:
12. Date Dry Pipe Valve last trip tested:
13. Wet Systems: 1 Make and Model?
14. Dry Systems: Make and Model?
15. Special Systems: Type?
Make and Model?
2-1/2" - 36 Second Retard
.
16. CONTROL VALVES Open Secured Closed Signs Condition
Number Type Yes No Yes No Yes No Yes No
City Connection Control Valve 1 PIV x x x x
Dry Svstem
Sectional Control Valves
System Control Valves 1 BFV x x x x
Condition?
17. WATER FLOW TEST
Water Pressure?
Water Flow Test?
120
CITY PSI TANK PSI
(If none made, Why?)
FIRE PUMP PSI
Size Pressure Flow Pressure Size Pressure Flow Pressure
Test Pipe Located Test Pipe Before Pressure After Test Pipe Located Test Pipe Before Pressure After
Mechanical Room 1-1/4" 120 84 95
18. HEAT RESPONSIVE DEVICES: Type ofTest?
Valve # A B C D E F Valve # A B C D E F
Valve # A B C D E F Valve # A B C D E F
Valve # A B C D E F Valve # A B C D E F
Valve # A B C D E F Valve # A B C D E F
Auxiliary Equipment? Number? Type? Location? Test Results?
19. EXPLANATION OF ANY "NO" ANSWERS:
20. RECENT CHANGES IN BUILDING OCCUPANCY OR FIRE PROTECTION EQUIPMENT:
21. ADJUSTMENT OR CORRECTIONS MADE:
22. DESIRABLE IMPROVEMENTS: