HomeMy WebLinkAbout5D - Fire Station No. 2 Change Order #1
MEETING DATE:
AGENDA #:
PREPARED BY:
AGENDA ITEM:
DISCUSSION:
4646 Dakota Street S.E.
Prior Lake, MN 55372-1714
CITY COUNCIL AGENDA REPORT
February 4, 2008
5D C\"
Frank Boyles, City Manager\.
CONSIDER APPROVAL OF A OLUTION APPROVING CHANGE ORDER
#1 FOR THE FIRE STATION NO.2 CONSTRUCTION PROJECT.
Introduction
The purpose of this agenda item is to request Council adoption of the attached
resolution approving change order #1 for the Fire Station NO.2 construction
project.
Historv
In 2006 a referendum was adopted authorizing the construction of Fire Station
NO.2. Bill Wolters, dba Constructive Ideas, was appointed owner's
representative for the project. I & S Architects and Engineers was appointed
architect for the project.
Current Circumstances
Construction of Fire Station NO.2 is proceeding on schedule despite
considerably more cold and snow than was experienced last year. As the project
has proceeded, the owner's representative has worked with the architect and the
general contractor, Met-Con, to identify necessary changes to provide for a
complete and fully usable building.
Change order #1 (attached) includes 16 items which represent fine tuning of the
project. Eleven items are additions and five are deductions. The two largest
additions are "add cascade system to Self Contained Breathing Apparatus
(SCBA) compressor with remote fill capability" (+ $7,275.50) and "extend 3-
phase power from intersection of CSAH 21 and Fountain Hills Drive to site as
required by Minnesota Valley Electrical Cooperative (MVEC)" (+ $9,877.00).
The cascade system is used to fill firefighter breathing tanks. The firefighters
gave I&S the request before the specifications were complete, but because of an
oversight, it did not get into the specifications. Mr. Wolters believes it is best to
have the same plumber do this work who installed the rest of the SCBA cascade
system for accountability reasons. He also indicates we saved $1,000 over the
original pre-bid quote for this work.
The equipment within the station requires three phase power. Minnesota Valley
Electric was asked to trench the three phase power to the parcel. Often this
service will be provided at no charge, but because of the length of the trench
(mid-block on CSAH 21) and the lack of long term estimated pay back, MVEC
required that the City pay. We have no option other than MVEC since this is
their service area.
www.cityofpriorlake.com
Phone 952.447.9800 / Fax 952.447.4245
Conclusion
The work contemplated on this change order is necessary in the opinion of the
staff.
ISSUES:
Change orders represent the nitty gritty implementation of building plans through
the construction process. In some cases, the plans do not contemplate the
conditions on the site or an oversight occurs when plans are developed. This
change order reflects changes in each category. The change order has been
reviewed by the owner's representative and is recommended for City Council
approval.
FINANCIAL
IMPACT:
The Fire Station NO.2 project includes $140,000 if necessary for change orders.
The project was bid $200,000 under the budgeted amount. According to Sill
Wolters, he does anticipate another change order, but does not expect that it will
exceed $20,000. Funds are therefore available in the building account to pay for
this change order.
ALTERNATIVES:
1. Approve the change order by resolution.
2. Defer action and request additional information.
RECOMMENDED Alternative #1.
MOTION:
Motion By:
Second By:
WHEREAS, In 2006 the voters approved a referendum to construct Fire Station No.2; and
WHEREAS, The City appointed owners representative Bill Wolters, dba as Constructive Ideas; and
WHEREAS, The architect for the project is I&S Architects and Engineers; and
WHEREAS, The General Contractor for the project is Met-Con, Inc.; and
WHEREAS, Each of the three parties recommend that change order #1 be considered for approval.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. Change order #1, dated January 4,2008, in the amount of $20,906.78 is hereby approved subject
to the architect and contractor execution prior to the City.
3. That the amount of $20,906.78 is hereby allocated from account #420-70305-501 for this purpose.
4. The City Manager is authorized to execute this change order on the City's behalf.
PASSED AND ADOPTED THIS 4th DAY OF FEBRUARY, 2008.
Hauaen Hauaen
Erickson Erickson
Hedbera Hedbera
leMair leMair
Millar Millar
YES
NO
Frank Boyles, City Manager
www.cityofpriorlake.com
Phone 952.447.9800 / Fax 952.447.4245
AlA
' .
.. ,-
..."6ii....
Document G701TU - 2001
Change Order
PROJECT (Name and address):
Prior Lake Fire Station #2
Prior Lake, Minnesota
TO CONTRACTOR (Name and address):
Met-Con Companies
15760 Acorn Trail
Faribault, Minnesota 55021
CHANGE ORDER NUMBER: 001
DATE: January 04, 2008
OWNER: ~
ARCHITECT: ~
CONTRACTOR: ~
FIELD: D
OTHER: D
ARCHITECT'S PROJECT NUMBER: 06-10076
CONTRACT DATE: August 07, 2007
CONTRACT FOR: General Construction
THE CONTRACT IS CHANGED AS FOLLOWS:
(Include, where applicable. any undisputed amount attributable to previously executed Construction Change Directives)
1. Credit for City of Prior Lake to remove stockpiled soil as described in Proposal Request #1. Deduct ($951.87)
2. Furnish and install4" heads at frames for doors 116, 121 and 107A as described in Proposal Request #2. Add $59.85
3. Change closer anTIS as described in Proposal Request #2. Add $919.65
4. Change hardware fInish to dark bronze as described in Proposal Request #2. Add $915.60
5. Furnish and install longer beams for mezzanine support and anchor bolt size change as described in Proposal Request #2. Add
$288.75
6. Modify flagpole foundation as described in Proposal Request #2. Add $1,897.50
7. Change flagpole color as described in Proposal Request #2. Add $422.10
8. Furnish and install interior windows as described in Proposal Request #2. Add $2,061.30
9. Omit twenty one (21) Acrovyn comer guards as shown on the approved shop drawings and described in Proposal Request #3.
Deduct ($652.25)
10. Omit paper towel dispenser as described in Proposal Request #3. Deduct ($111.40)
11. Omit paper towel dispenser/waste receptacle as described in Proposal Request #3. Deduct ($244.22)
12. Omit Gorbel monorail in hose tower as described in Proposal Request #3. Deduct ($1,401.98)
13. Change capacity of hoist for hose tower from I-ton to 1/2-ton as described in Proposal Request #3. Add $131.25
14. Add cascade system to SCBA compressor with remote fIll capability as described in Proposal Request #3. Add $7,275.50
15. Change hose reels for pressure washer from 50' to 100' as described in Proposal Request #3. Add $420.00
16. Extend 3-phase power from intersection of CSAH 21 & Fountain Hills Drive to the site as required by Minnesota Valley
Electric Cooperative. Add $9,877 .00
Total Add $20,906.78
The original Contract Sum was
The net change by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sum will be increased by this Change Order in the amount of
The new Contract Sum including this Change Order will be
The Contract Time will be unchanged by Zero ( 0 ) days.
The date of Substantial Completion as of the date of this Change Order therefore is
$
$
$
$
$
1,908,700.00
0.00
1,908,700.00
20,906.78
1,929,606.78
AlA Document G701 1M - 2001. Copyright @ 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AlA'"
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA'" Document, or any 1
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document
was produced by AlA software at 11 :52:37 on 01/10/2008 under Order No.1 000296556_1 which expires on 4/19/2008, and is not for resale.
User Notes: (202778094)
NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which
have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
I&S Engineers & Architects, Incorporated
ARCHITECT (Firm name)
1415 Town Square Lane, Faribault,
Minnesota 55021
ADDRESS
Met-Con Companies
CONTRACTOR (Firm name)
15760 Acorn Trail, Faribault, Minnesota
55021
ADDRESS
City of Prior Lake
OWNER (Firm name)
4646 Dakota Street SE, Prior Lake,
Minnesota 55372-1714
ADDRESS
BY (Signature)
Brian Gjerde
(Typed name)
BY (Signature)
Tom McDonough
(Typed name)
BY (Signature)
Frank Boyles
(Typed name)
DATE
DATE
DATE
AlA Document G701 TM - 2001. Copyright lID 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AlA'"
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA'" Document, or any 2
portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document
was produced by AlA software at 11 :52:37 on 01/10/2008 under Order No.1 000296556_1 which expires on 4/19/2008, and is not for resale.
User Notes: (202778094)