Loading...
HomeMy WebLinkAbout7B - 2008 Equipment Replacement Report MEETING DATE: AGENDA #: PREPARED BY: AGENDA ITEM: DISCUSSION: 4646 Dakota Street S.E. Prior Lake, MN 55372-1714 CITY COUNCIL AGENDA REPORT FEBRUARY 4, 2008 7B AL FRIEDGES, PARKS & FLEET MAINTENANCE SUPERVISOR PRESENTATION OF THE 2008 EQUIPMENT REPLACEMENT REPORT Introduction The purpose of this agenda is to seek City Council approval of a report relating to: 1. City Council authorization of equipment acquisition strategies, and 2. Review of equipment to be acquired in 2008. History On August 20, 2007 City Staff presented a report detailing the City's Equipment Matrix program. As part of that presentation staff was directed to provide an annual report that previewed and justified the proposed purchases for the coming year. Additionally the report would summarize Staff's research of the following potential alternatives to possibly extend the life of our fleet and to help reduce purchase costs: 1. Equipment Refurbishing Program; 2. Lease and Rental options; 3. Equipment Zero Value Operation; 4. Alternative Fuels Analysis; 5. Vehicle and Equipment Scheduling and Operations Procedures; 6. Equipment Partnerships; and 7. Used Equipment. Current Circumstances As directed by the City Council Staff has prepared a 2008 Equipment Replacement Report. Staff has investigated the following options and will consider them as part of 2008 purchases and the preparation of the 2009-2013 Equipment Matrix. 1. Refurbishing Program: Currently, the fleet division performs numerous refurbishing and body repair functions to the vehicles and equipment. The repair and refurbishing conducted helps to keep our equipment looking good displaying a positive public image and it also adds longevity. Staff has researched other options to see if a more aggressive refurbishing program by changing out and replacing drive train and engine components could save money and extend the projected life expectancies. The equipment used in this exercise was the five ton (5T) dump trucks and the one ton (1T) dump trucks. The following are examples of the cost associated for both: www.cityofpriorlake.com R:\Council\2008 Agenda Reports\02 04 08\~b~~0~~!f.2f41~800 / Fax 952.447.4245 5T d t k ump ruc s Replacement Component Staff labor Labor cost Sub-total component cost hours Enoine $13,099 40 $1,200 $14,299 Transmission $5,623 10 $300 $5,923 Brakes, tires, $9,000 30 $900 $9,900 suspension Plow $12,500 40 $1,200 $13,700 upgrades, electronics Box & prewet $21 ,426 0 0 $21 ,426 Plow and $12,040 ,27 $810 $12,850 wing Sand/paint $3,150 48 $1,440 $4,590 195 Total $82.688.00 1 T truck with dumo box and olow Replacement Component Staff labor Labor cost Sub-total component cost hours Enoine $6,000 34 $1,020.00 $7,020 Transmission $2,363 16 $480.00 $2,843 Dump box $8,000 18 $540.00 $8,540 Brakes, tires, $4,000 20 $600.00 $4,600 suspension Plow $3,714 4 $120.00 $3,834 Sand/paint $2,400 38 $1,140.00 $3,540 130 Total $30,377.90 The purchase cost for a new 5T dump with a plow, wing and all the electronic updates to control all of the accessories for snow and ice removal functions is $150,000. Likewise, to purchase a new 1T truck with a dump box and plow is $40,000. Analvsis: Extending the life of vehicles which are already at least 12 years old in both of these examples can result in hidden issues. After spending thousands of dollars to replace engines, transmissions and drive trains, the vehicle itself continues to age. This can result in uncertainties to the condition of the frames, hydraulics, electronic components and rear ends. Additionally, the resale value continues to decrease. The equipment also would not include new technology for winter applications or fuel tracking. The City does not currently have the in house facilities necessary to complete the above refurbishing. A significant capital investment would be necessary to pursue this option. R:\Council\2008 Agenda Reports\02 04 08\fleet 2008 agenda.doc 2 Recommendation: Staff recommends continuing to perform body repairs and small refurbishing projects such as trailers and basic body work but not take on the major equipment overhaul contemplated above. 2. Lease and Rental Options: lease Currently the Public Works maintenance divisions do not lease equipment. long term leasing eventually costs more than an outright purchase. Like wise, lease with the option to buy costs more than a purchase. The semi-annual payments with interest for 5 years would be $19,265.58. Additionally, unlike the private sector, the City receives no deduction on a lease or lease to own option Analvsis: There are two options that would make a lease more effective: 1. Leasing can be an asset if a piece of equipment were needed on a short term basis only and potentially never needed again. 2. Another option from a short term lease to be a benefit would be if a piece of equipment were to become obsolete because of rapidly changing technology. Rental Typically, the equipment that the Public Works maintenance divisions rent are pieces of equipment that are not utilized enough, or the cost of the machine is too high to justify purchasing. Examples of the rented equipment are mini- excavators, track hoe's and occasionally skid loaders when all of the City owned skid loaders are being utilized. Followino are equipment rental costs from 2004 - 2007: Year Streets Water Sewer Storm Total Water 2004 $4,872.75 $6,582.13 $161.14 $11,616.02 2005 $4,804.77 $2,869.12 $917.00 $8,591.44 2006 $2,643.64 $9,027.27 $3,503.13 $15,174.04 2007 $1,657.40 $2,874.68 $1,005.91 $5,184.09 $10,722.08 R:\Council\2008 Agenda Reports\02 04 08\fleet 2008 agenda.doc 3 Recommendations: Staff recommends continuation of rental options when appropriate and to utilize short term leases, and as addressed in the section entitled "Equipment Partnerships" we will consider joint purchase or borrowing as appropriate. 3. Equipment Zero Value Operation There are several specialized pieces of equipment that the City needs to purchase to maintain the utilities, streets and parks. This type of equipment is usually expensive and the purchase value of the equipment decreases rapidly. Examples of specialized equipment are: ~ Extend a jetter ~ Pavement router ~ Slide-in-sanders ~ Jet vac ~ Crack sealing equipment ~ Anti-icing equipment ~ Top dressers ~ Valve exercisers ~ Large turf mowers Analvsis: Operating equipment to zero value has pros and cons: Pros: By operating select pieces of equipment to zero value the City can utilize it to its maximum life, therefore receiving 100% use of the purchase price. Cons: 1. When this type of equipment is identified in an estimated life cycle for replacement, it is usually in fair condition, but has no trade-in value. 2. By retaining this type of equipment longer periods of time, major cost break- downs can and will occur. Funding for this in the correct budget cycle becomes impossible. Recommendations: Staff believes that certain pieces of equipment should be operated to zero value to maximize life and return to City. However this should be limited to equipment which the City can operate without for a short period as in a given year funding may not be available to replace the equipment or delays in ordering may result. 4. Alternative Fuels and Upgrading Fuel Site Analvsis: Currently we utilize gasoline with a blend of 10% ethanol and diesel fuel with a blend of 2% bio (B2). Starting in 2008 all of our diesel fuel will be B5. Additionally, all of our new vehicle purchases will be analyzed for alternative fuel and environmentally sensitive options. These options will include E85, electric and diesel. R:\Council\2008 Agenda Reports\02 04 08\f1eet 2008 agenda.doc 4 Recommendations: At this time staff believes purchasing diesel vehicles when options allow and utilizing more efficient gas vehicles are the best options for the City both economically and environmentally. Hybrid electric technology will continue to be evaluated by staff. 5. Vehicle and Equipment Scheduling and Operations Procedures Schedulino: Currently the supervisors in all the respective Public Works maintenance divisions meet each morning before delegating job tasks to employees. The purpose of these short meetings is to discuss equipment needs for the day. This process assures that all available equipment in the fleet is being utilized to its maximum potential. Analvsis: During the summer month's when many seasonal employees are retained, a shortage of equipment and vehicles becomes problematic. In order to help remedy some of the vehicle shortage issues, the Parks Maintenance Division is investigating the idea of having some of the seasonal employees report directly to the park that they are assigned to. By having select employees report directly to the work site will help alleviate vehicle shortages since they will not need to use city equipment. An example of the City's scheduling effectiveness is the Skid loaders. Presently the City owns three skid loaders that range in hourly use from 500 to more than 700 hours per year. Current industry guidelines recommend having a skid loader for every 400 hours of needed use. By effectively scheduling and maintaining these loaders and using rental loaders to meet peak demand the City is able to exceed existing guidelines and maximize value. Operation: The City is currently working on an idle reduction program to reduce the amount of idle time for equipment. The anticipated benefits of minimizing idling are expected to be a reduction in fuel consumption, reduction of emissions and extended equipment life. Recommendations: Staff recommends working closely with all Public Works maintenance divisions to create other alternatives to reduce vehicle shortages without necessarily purchasing additional vehicles and equipment. Staff will report the results of the idle reduction program later this year. 6. Equipment Partnerships The City has actively been promoting partnerships with the SMSC, and cities of Savage and Burnsville to share the cost of purchasing certain vehicles, as well as sharing the cost to maintain and repair the vehicles and equipment. The "Purchase and Utilization Agreements" are consistent with the goal of building partnerships as provided in the 2030 Long Range and Strategic Plan. R:\Council\2008 Agenda Reports\02 04 08\f1eet 2008 agenda.doc 5 The equipment utilized by these governmental entities include: ~ A crack seal asphalt heater and applicator ~ A pavement router ~ A heated mobile asphalt unit ~ A infra-red asphalt patch unit Analvsis: Additional avenues of partnerships are available through the Scott County Association for Leadership and Efficiency (SCALE) where numerous pieces of maintenance equipment are available from other Scott County cities, townships, school districts and the County at cost effective rates for both normal and emergency situations. Occasionally, new equipment purchases are discussed for joint purchasing venture through the SCALE group members. Recommendations: Staff recommends continued utilization of joint purchasing and increased partnerships with other outside agencies for specialized repair or maintenance equipment. 7. Investigation of Used vs. New Analvsis: Streets and Utilities supervisor, Craig Eldred has completed a comprehensive review of the purchase of new vs. used equipment. The study compared the costs for buying a used vs. new Tandem Dump Truck. The study highlighted several issues related to buying used Dump Trucks. A. Unless the truck was originally set up for plowing the frame and springs do not meet the City standards and the vehicle will wear out quicker. B. Technology wise, a substantial amount of money is needed to upgrade these vehicles and equipment. C. The available vehicles that meet the City's needs typically have substantial mileage in this case 90,000. The total cost of the used vehicle is $115,000 compared to $178,000 for a new vehicle. There also are bidding issues because these vehicles require competitive bids. There are opportunities when purchasing slightly used equipment that could be a cost savings to the City. For instance, purchasing used pickups, demo mowers with low hours, enclosed trailers and backhoes could, if available at the time of need, be good alternatives to buying new. Staff has purchased used vehicles in the past; the most recent is the purchase of a used enclosed trailer. Staff will continue to work with the City Attorney to develop a specification that would allow competitive bidding of used vehicles. Recommendation: The City will continue to develop specifications that allow bidding of used equipment when appropriate and will continue to evaluate the most cost effective options for the City. R:\Council\2008 Agenda Reports\02 04 08\f1eet 2008 agenda.doc 6 ISSUES: As Council is aware, the Vehicle and Equipment Replacement Matrix, the vehicle and equipment history, analysis and statistics and the Jet Fleet and Gas Boy monitoring system are the tools that staff utilizes to justify vehicle and equipment purchases. By incorporating the alternatives to extend the life of our Fleet to help reduce purchase costs as discussed in this report, all purchases will have gone through a very diligent evaluation process. This process will guarantee that all existing and new equipment purchases will meet a strict set of criteria. The Equipment Matrix in the Capital Improvement Program identifies the following equipment to be replaced in 2008. Each vehicle or piece of equipment purchased is subject to Council approval and will be presented at a later date. Department/Division Equipment New Equipment Year Estimated Description Replacement Number Cost Fire Rescue New addition n/a n/a $350,000 truck Public Works Ford 4x4 Replacement #453 1997 $36,601 w/plow Parks Maintenance Skid steer Replacement #532 1996 $7,745 trailer Parks Maintenance 22 ft. trailer Replacement #531 1996 $7,745 Department/Division Equipment New Equipment Year Estimated Description Replacement Number Cost Parks Maintenance Melroe Replacement #502 2001 $41,853 Bobcat 773 Parks Maintenance Holder Replacement #506 1998 $82,538 sidewalk plow Parks Maintenance Toro 580D Replacement #503 1995 $81,901 Parks Maintenance Toro 72" Replacement #524 1998 $34,904 325D Parks Maintenance Cushman Replacement #536 1998 $31,933 herbicide sprayer Parks Maintenance Seed-a-vator Replacement #665 $2,00 $11,246 0 Public Works Slide-in- New addition n/a n/a $6,896 sander Public Works Ford L8000 Replacement #519 1996 $205,815 dump Total $899.177 . The 2009 Equipment Matrix identifies the replacement of a 1994 Ford one ton dump truck. This vehicle was put on "light duty" status this fall because of transmission, bell housing and drive train problems. Staff is requesting that this vehicle be moved up for replacement in 2008 and that Unit Number 453, a 1997 Ford pickup which is up for replacement this year be pushed back to 2009. Staff recommends moving Unit #453 back one year for two reasons: ~ Unit #453 from a maintenance stand point can be effectively utilized for one additional year and ~ Moving Unit #453 back for one additional year will help balance the proposed Equipment Matrix budget. R:\Council\2008 Agenda Reports\02 04 08\f1eet 2008 agenda. doc 7 FINANCIAL IMPACT: There is $899,177.00 identified to replace existing vehicles or equipment or to purchase additional vehicles and equipment in the Equipment Matrix. The vehicles and equipment being replaced have met or exceeded their life expectancies and will soon begin to cost excessive dollars in repairs. Staff cannot calculate the exact potential cost savings that this report discusses. If all the staff recommendations on each issue are exercised and over time additional research is conducted, the savings could be substantial. Additionally, as we conduct and track the potential alternatives in this report, all purchasing will have gone through strict criteria. ALTERNATIVES: The alternatives are as follows: 1. Approve the report and provide staff with direction regarding included equipment and facilities and method of funding so a draft matrix can be provided to the City Council for the 2009-2013 CIP. 2. Table this agenda item for a specific reason. 3. Deny this agenda item for a specific reason and provide staff with direction. RECOMMENDED MOTION: Alternative #1. R:\Council\2008 Agenda Reports\02 04 08\f1eet 2008 agenda.doc 8