HomeMy WebLinkAbout09-127 CR 21 Watermain BidsO~ , PRIp~~ 1 ~, U ~ i~ ~~ ~. /, ~ ~I~'NESO~~` 4646 Dakota Street S.E. Prior Lake, MN 55372-1714 RESOLUTION 09-127 RESOLUTION ACCEPTING BIDS AND AWARDING THE STANDARDIZED CONSTRUCTION CONTRACT FOR THE CR 21 WATERMAIN PROJECT Motion By: Millar Second By: LeMair WHEREAS, The CR 21 watermain between Eau Claire Trail and Quincy Street is an important piece of the City's water infrastructure; and WHEREAS, Breaks that occurred during the 2008-2009 winter season revealed damage that if left unrepaired will most likely continue to fail annually resulting in considerable cost to the City; and WHEREAS, On June 15, 2009 the City Council accepted a Feasibility Study for the repair and reconstruction of the CR 21 watermain and authorized Staff to pursue relocation of the watermain to the northern boulevard of CR 21 utilizing directional drilling. SRF was authorized to proceed with easement acquisition on the City's behalf; and WHEREAS, In order to complete the project during the fall of 2009 the City needs to acquire easements for construction; and WHEREAS, On August 17, 2009 the City Council approved the plans and specifications and authorized the advertisement for bids; and WHEREAS, On September 14, 2009 the City received the following bids for the directional drilling: Bidder Total Bid Ellin son Draina a Com anies $251,684.00 GM Contractin Inc. $336,987.81 EBI Drillin Inc. $734,900.00 The low bid was submitted by Ellingson Drainage Companies; and WHEREAS, The City also solicited quotes in accordance with the City's Purchasing Policy for paving, watermain materials and watermain construction. The following quotes were received: Bidder Total Bid Pavin Prior Lake Blackto $19,483.00 McNamara Contractin $35,050.00 Northwest As halt DNQ Watermain Reconstruction Quirin Excavatin $71,519 McNamara Contractin $116,350 SM Hent es & Sons $120,950 Watermain Materials Northern Waterworks $93,938.85 HD Su I Waterworks $95,196.95 MN Pie $129,242.79 www. cityofpriorlake. com Phone 952.447,,,9800 /Fax 952.447.4245 WHEREAS, City Staff recommends award of the City's Standardized Construction Contract for the CR 21 Watermain Reconstruction Project to: 1. Ellingson Drainage Co. for directional drilling; 2. Prior Lake Blacktop for paving; and 3. Quiring Excavating for watermain reconstruction. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. The Mayor and City Manager are authorized to execute the City's Standardized Construction contract with: A. Ellingson Drainage Co. in an amount not to exceed $251,684.00 for directional drilling; B. Prior Lake Blacktop in an amount not to exceed $19,483.00 for paving; and C. Quiring Excavating in an amount not to exceed $71,519.00 for watermain construction. 3. Staff is authorized to purchase watermain materials from Northern Waterworks for an amount not to exceed $93,938.85. 4. Staff is authorized to complete watermain service reconnections and project restoration for an amount not to exceed $44,787.34. 5. Watermain reconstruction costs will be recorded in the Water & Sewer Fund (#601-49400-530). PASSED AND ADOPTED THIS 21st DAY OF SEPTEMBER 2009. YES NO Hau en X Hau en Erickson X Erickson Hedber X Hedber LeMair X LeMair Millar X Millar Frank Boy s i y Manager M:\COUNCIL\RESOLUTI\2009\09-127 CR 21 Watermain Bids.doc