Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Electrical Permit 11.277
Q ?RIO a i PERMIT #11- Z iliAt I 11 7 . kt s9t. CONTRACTOR /REGISTERED EMPLOYER REQUEST FOR ELECTRICAL INSPECTION Dat Rough -In Inspection Required? © Rea Yes Inspection Other Than Rough -in: dy Now �� 1' D 11 Contractor /Employer Must Schedule All Rough -In Inspections Contractor /Employer Must Schedule All Final Inspections m Will Schedule Address of Inspection - Street ,5 2 , / g / `l _ p Q t .� f C`1 !"C" Project Description: Owner Name /^ Y , o y W y / �_ files. 7 J C. XC EM ery fa Vr S . Owner P ei n z .../ I ciA/ jl • ��j � Home: - /.5 Z • l Yu' / 1,1 Cell: Contractor /Registered Employer Name Contractor /Registered Employer Mailing Address 4}V NT a&cr is COPPO gtr OINI 2300 Terri fvvra 1 IP..oad, SI . Pat. 1 MN C5114 Contractor /EmplooyerTelephone Number Contractor/Employer E -mail Address Electrical Utility Work:051.4 3/.,qlV amK.rr/ I 1 t/e Xce l ENQrgy Cont r /Empl Aut Signature Contractor License Number Job /Project Contact Person: EP S/3 3 4 if Mack_ FEE CALCULATION Service /Power Supply 0 -400 ampere @ $35 Technology Systems Devices ( ) @ $ .75 Each Service /Power Supply 401- 800 ampere @ $60 Separate Bonding Inspections for Swimming Pools and Equipotential Planes ( ) @ $35 Each Service /Power Supply Above 800 ampere @ $100 Center Pivot Irrigation Booms ( ) @ $35 Each Plus ( ) Electrical Drive Units @ $5 Each New /Extended Feeders /Circuits Up to 200 A ( ) @$6 Each Luminaire Retrofit Modifications ( ) @ $.25 Each Feeders /Circuits Above 200A ( ) @ $15 Each Concrete - Encased Electrode Inspection ( ) @ $35 Each Reconnected Feeders /Circuits ( ) @ $2 Each Investigative Fee $70 Or The Total Inspection Fee, Whichever is Greater Up to $1,000 Manufactured Home Park Lot Supply ( ) @ $35 Each Special Inspection Fee ( ) Hours @ $80 Per Hour Plus ( ) Miles @ The IRS Mileage Rate of ( ) Recreational Vehicle Site Supply Equipment ( ) Circuits Originating in the Equipment @ $6 Each Other Street, Parking Lot, Lighting Standard ( ) @ $5 Each Over 600 Volts - Add the combined service /power supply and feeder /circuit fee to result in double the regular fee (does not apply to electric sign and outline lighting) Transformers Up to 10 kva ( ) @ $15 Each ( ) New Multi- Family Dwellings @ $70 Each (i) State Surcharge of $5.00 ( ) Additional Circuits Above the 20 Allowed Per unit @ $6 Each Transformers Over 10 kva ( ) @ $30 Each TOTAL (the fee calculated above or $35 multiplied by the ,,!• O number of required inspection trips, whichever is gre ter) '� Receipt # 3 Requests for Electrical Inspection (REI) with a fee of $250 or less expire 12 months from the filing date. The owner must have the work completed within the 12 month period or submit another REI that includes the inspection fee for the uncompleted work. Inspection fees do not carry over from one REI to another. A service charge of $28 will be added for all dishonored checks. I hereby certify that I inspected the electrical installation herein on the dates stated: Rough -In Inspection (s) Date Walt Lusian, Electrical Inspector 952.934.0229 Final Inspection Date *tie w