PLANNING COMMISSION AGENDA REPORT
AGENDA ITEM: 6A
SUBJECT: 2015-2019 CAPITAL IMPROVEMENT PROGRAM
PRESENTERS: LARRY POPPLER, CITY ENGINEER/DIRECTOR OF INSPECTIONS
KATY GEHLER, PUBLIC WORKS DIRECTOR
JERILYN ERICKSON, FINANCE DIRECTOR
PUBLIC HEARING: YES —X—NO-N/A
DATE: AUGUST 4, 2014
INTRODUCTION:
Minnesota State Statute 462.356 provides that all proposed property acquisitions or disposals and capital
improvements be reviewed by the Planning Commission for consistency with the Comprehensive Plan and
the Planning Commission report their findings in writing to the City Council.
Attached is a draft of the proposed 2015-2019 Capital Improvement Program (CIP) including the Transpor-
tation Plan. The estimated cost for the projects in the 5 -year CIP is approximately $69.6 million (which
includes the Facilities Management Plan, Equipment Replacement Plan and the Technology Plan).
DISCUSSION:
There are many significant projects included in the CIP. Some of them include reconstruction work in con-
junction with Scott County or the State of Minnesota at the following locations:
• TH13/150t" Street (2015)
• Duluth Avenue/TH 13 Signal (2015)
• CR83 Cooperative Agreement Payment (2015)
• CR21 / Main / Pleasant (2015)
• CR42 / TH13 Boone to Louisiana (2017)
Other street improvement projects include the following areas:
• Mushtown/Maple/Panama/Maplewood (2015)
• Rolling Oaks (2015)
• Stemmer Ridge Road (2015)
• Grainwood / Eau Claire / Highland / Marsh / Skyline (2015)
• Credit River Road (2015)
• Albany / CJ Circle / Five Hawks / Cates (2016)
• Manitou Road (2016)
• Raspberry Ridge / Hidden Pond / Black Oak / Timberglade (2016)
• Franklin Trail Rehabilitation (2016)
• Pershing / Dunkirk / Dutch / Roanoke / Green Hts / Spring (2017)
• Sycamore Trail (2017)
• Balsam / Sunrise / Spruce (2017)
• Hidden Oaks / Timberview (2018)
• Fish Point Road (2018)
• Huron / Wildwood / Woodside (2018)
• Arcadia (2018)
• Martindale / Hickory / Henning (2018)
• Fish Point Road (2019)
• Franklin Trail (2019)
• Beach Street (2019)
• Arcadia (2019)
In addition to the roadwork projects, the CIP also includes a number of other projects, including ones related
to well construction, sewer inflow / infiltration prevention, improvements to water main/stormwater compo-
nents and a second water treatment plant.
Activities scheduled in the City's park development over the next 5 years will include the installation of field
backstops, basketball courts, parks signs, picnic shelter and play structures in developments including the
Enclave Park, Phase II (2015). The City Council requested that staff consider phasing these improvements
in over multiple years due to the development only being partially completed.
The Planning Commission's function is to review the proposed projects, determine whether they make sense
from the perspective of the Comprehensive Plan and make specific recommendations about projects in the
CIP or about projects not in the current CIP which the Commission feels would better achieve Comprehen-
sive Plan goals. The Commission does not need to feel constrained to restrict its consideration only to those
projects contained in the proposed CIP.
Any recommendation for changes to the CIP should indicate which particular goal or policy in the Compre-
hensive Plan is being advanced by the recommended project. The thing to keep in mind is that all projects
are competing for a limited amount of money and the CIP is limited to those projects with the highest priority.
ACTION REQUIRED: Approve a resolution finding that the capital improvements identified in the 2015-
2019 Capital Improvement Program are in compliance with the Comprehensive Municipal Plan.
ATTACHMENTS:
1) Resolution
2) 2015-2024 Transportation Plan — Council Workshop 06.23.2014
3) 2015-2019 CIP— Projects by Department— Council Workshop 06.23.2014
rti
u 41"4646 Dakota Street SE
Prior Lake, MN 55372
PLANNING COMMISSION
CITY OF PRIOR LAKE, MINNESOTA
RESOLUTION NO. 14 -XX PC
RESOLUTION OF THE CITY OF PRIOR LAKE PLANNING COMMISSION FINDING THAT THE CAPITAL
IMPROVEMENTS IDENTIFIED IN THE 2015-2019 CAPITAL IMPROVEMENT PROGRAM ARE IN COMPLIANCE
WITH THE COMPREHENSIVE MUNICIPAL PLAN.
WHEREAS, the City staff has prepared and presented to the Planning Commission the 2015-2019 Capital
Improvement Program hereinafter "CIP;" and
WHEREAS, pursuant to Minn. Stat. §462.356, Subd 2 after a comprehensive municipal plan or section thereof
has been recommended by the planning agency and a copy filed with the governing body, no publicly owned interest
in real property within the municipality shall be acquired or disposed of, nor shall any capital improvement be authorized
by the municipality or special district or agency thereof or any other political subdivision having jurisdiction within the
municipality until after the planning agency has reviewed the proposed acquisition, disposal, or capital improvement
and reported in writing to the governing body or other special district or agency or political subdivision concerned, its
findings as to compliance of the proposed acquisition, disposal or improvement with the comprehensive municipal
plan..
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission finds that the capital improvements
identified in the CIP are in compliance with the comprehensive municipal plan.
PASSED AND ADOPTED THIS 4th DAY OF AUGUST, 2014.
VOTE
Phelan
Blahnik
Hite
Larson
Spieler
Aye
❑
❑
❑
❑
❑
Nay
❑
❑
❑
❑
❑
Absent
❑
❑
❑
❑
❑
Abstain
❑
❑
❑
❑
❑
Dan Rogness, Community & Economic Development Director
Phone 952.447.9800 / Fax 952.447.4245 / www.cityofpriorlake.com
04 P`°OR CITY OF PRIOR LAKE
F 2015-2024 TRANSPORTATION PLAN
MNN[Sd«
Proposed 06.23.2014
Year
Improvement
Project Type
Length
Pavement
Utility
MSA
Street
Tax
Bond
Assessments
Water
Sewer
Water
Watermain
Sanitary
Storm
Grant or Other
Total City
Municipal
County
State
Federal
TOTAL PROJECT
Miles
OCI*
OCI*
Oversizing
Levy
Utili!Z Fund
UtilitX Fund
Quality
Trunk Fund
Trunk Fund
Trunk Fund
Contribution
Cost
Cost
Cost
Cost
Cost
COST
2015
Mushtown/Maple/Panama
Utility Extension
0.3
23
0
-
131,186
388,384
429
906,388
-
-
42,588
31,000
31,000
-
200,000
1,730,546
-
-
-
-
1,730,546
2015
Rolling Oaks
Utility Extension
0.25
0
0
-
60,000
429
270,000
-
-
100,000
100,000
100,000
-
260,000
890,000
-
-
-
890,000
2015
TH 131150th Street
Safety/ Partner
0.1
NA
NA
500,000
150,000
650,000
Recon
100,000
100,000
60,000
-
-
-
1,560,000
1,300,000
-
1,400,000
-
4,260,000
2015
Stemmer Ridge Road (CR 82 to Stemmer Ridge Road)**
Utility Extension
NEW
NA
NA
-
277,460
429
3,424,187
-
-
263,120
216,233
-
-
4,181,000
-
-
-
-
4,181,000
2015
Duluth Avenue l TH 13 Signal
Partnership
0.1
NA
NA
200,000
-
500,000
Recon
-
-
-
-
-
-
-
700,000
-
-
150,000
850,000
2015
Credit River Road (1989) (Evanston to Fish Pt.)
Pavement/Recon
0.55
31
30
-
-
950,000
429
250,000
900,000
100,000
50,000
-
650,000
-
-
2,900,000
-
-
-
2,900,000
2015
Highland/Marsh/Skyline (1977)
Pavement/Recon
0.68
27
45
-
-
850,000
429
550,000
1,150,000
200,000
55,000
-
-
-
2,805,000
-
-
-
2,805,000
2015
Grainwood / Eau Claire (1977)
PavemenURecon
0.48
36
47
-
-
560,000
429
425,000
250,000
125,000
40,000
-
-
-
-
1,400,000
-
-
-
1,400,000
2015
CR 21 / Main Ave / Arcadia Signal
Partnership
NA
NA
NA
-
-
250,000
Recon
-
-
-
-
-
-
-
250,000
-
280,000
-
-
530,000
2015
CR 83 Coop Agreement Payment
Partnership
NA
NA
NA
57,000
Recon
-
-
-
-
-
-
57,000
-
-
-
57,000
2015
Proect Totals !
2.46
$',.. 700,000
$ 618;646
$ M1 4,205,384
$ I 5,825,575
$ 2,400,00D
$ 525,000
-:.:$ 347,588
$ 394,120
$ { 997,233
''$ - "
$ 460,00D
$ 16 473,546
$ 1 300,000
$ 280,000
$ 1'550 000
$ l: -:
$ 19603 546':'
2016
Albany/CJ Circle/ Five Hawks/Cates (1972)
Pavement/Recon
0.45
35
41
-
-
575,000
429
400,000
220,000
110,000
35,000
-
-
-
-
1,340,000
-
-
-
-
1,340,000
2016
Franklin Trail Rehabilitation (CR 44 to Summer) (1972)
Pavement/Rehab
0.33
38
26
-
750,000
Recon
-
150,000
50,000
-
-
-
-
950,000
-
-
-
950,000
2016
Manitou Road (1978)
Pavement/Recon
0.52
25
42
-
-
750,000
429
350,000
250,000
150,000
50,000
-
-
-
-
1,550,000
-
-
-
1,550,000
2016
Raspberry Ridge/Hidden Pond/Black Oak/Tlmber lade 1987
Pavement/Recon
0.6
48
57
975,000
429
400,000
1,200,000
150,000
50,000
-
-
2,775,000
-
-
-
-
2,775,000
2016
Project Totals .
1.9
1
$ •" - ?
$ `-
$ 3,050,000
$ :1150,000
-$ 1820,000
$ - 460,000_;$
135,000
$ ` -
$ -
$ -
$ "''
$ : 6,615,000
$ -
$ - -
$
2017
Arcadia Avenue (Colorado to TH 13)(Right of Way, Design)
Road Extension
NEW
NA
NA
-
-
1,800,000
Tax Ab
-
-
-
-
-
-
-
1,800,000
-
-
-
-
1,800,000
2017
CR 421TH 13 (Boone to Louisiana)
Partnership
NA
NA
NA
200,000
-
-
Recon
-
100,000
-
-
-
-
-
300,000
-
10,558,560
-
-
10,858,560
2017
Pershing/Dunkirk/Dutch/Roanoke/Green HtslSpring (1985)
Pavement/Rehab
0.76
37
34
-
-
900,000
Recon
-
75,00D
25,000
-
-
-
-
1,000,000
-
-
-
-
1,000,000
2017
BalsamlSunriselSpruce(1973)
Pavement/Recon
0.36
33
50
-
-
520,000
429
265,000
195,000
95,000
35,000
-
-
-
-
1,110,000
-
-
-
-
1,110,ODO
2017
Sycamore 1985
Pavement/Recon
0.19
35
47
220,000
429
115,000
310,000
50,000
695,000
695,000
2017
Project Totals '.
1.31
$ [ 200,000::
$ -
$ :. 3,440,000
1
1 $ 380,000
$ 680,000
$t 170,000"$
35;000
$ -
$ : -
;$ -,.
$ -
$ , 4,905,000
$ -
$ 10 558,500
$ -
$ i -
$ 16,463,660
2018
Arcadia Avenue (Colorado to Pleasant)-
Road Extension
NEW
NA
NA
300,000
100,000
-
Tax Ab
120,000
-
-
-
-
-
-
-
520,000
-
-
-
-
520,000
2018
Arcadia Avenue (Gross to TH 13)**
Road Extension
NEW
NA
NA
300,000
25,000
-
Tax Ab
370,000
136,000
50,000
-
-
-
881,000
-
-
-
-
881,000
2018
Duluth Avenue (Anna Trail to Arcadia)**
Road Extension
NEW
NA
NA
30D,000
75,000
-
Tax Ab
905,000
-
-
-
-
-
-
-
1,280,000
-
-
-
1,280,000
2018
Hidden Oaks/Timberview
Pavement/Recon
0.2
36
39
-
-
300,000
429
120,000
325,OOD
50,000
20,000
-
-
-
815,000
-
-
-
615,000
2016
Fish Point Road (CR 44 to TH 13)
Pavement/Rehab
0.66
42
40
-
-
1,250,000
Recon
-
-
-
-
-
-
1,250,000
-
-
-
1,250,000
2018
Huron/Wildwood/Woodside 1986
Pavement/Recon
0.68
31
25
1,070,000
429
350,000
1,120,000
160 000
50,000
2,750,000
2,750,000
" 2018
ProectTotals `
1-54
$ 900000.
$ 200,000
$ i' 2,620,000-;
$:: .1865,000
'$ 1581;000
$ - 260,000
$ 70,000
$ -
$ % -
:'$ - -.
$ '+ -
$ + 7,496000
$ -
$ _. '=
$ -
$ -: -
7498000`:
2019
Martindale/Hickory)Henning
Pavement/Rehab
0.61
24
0
-
-
300,000
Recon
-
-
-
-
-
-
300,000
-
-
300,000
2019
Fish Point Road (Fawn Meadows to CR 21)
PavementlRehab
0.28
39
78
-
-
600,000
Recon
-
-
-
-
-
600,000
-
-
600,000
2019
Franklin Trail (TH 13 to CR 21 South)
Pavement/Rehab
0.42
40
35
-
-
900,000
Recon
-
-
-
-
-
900,000
-
-
900,000
2019
Beach Street
Pavement)Recon
0.23
31
45
-
-
270,000
429
190,000
115,000
55,000
20,000
-
-
-
650,000
-
-
650,000
2019
Arcadia Avenue (Pleasant to Gross)**
Road Extension
NEW
NA
NA
50,000
25,000
-
Tax Ab
50,000
-
-
-
-
125,000
-
-
125,000
2019
Arcadia Avenue Gross**
Road Extension
NEW
NA
NA
400,000
100,000
-
Tax Ab
370,000
136,000
50,000
1,056,000
1056000
2019
Project Totals
1.54
$ 450,000
$ 125,000
$ -:.-. 2070,000
$i := 610,000
$ 251;000
$ 105,000
$ 20,000
$ ' -
$ -
;$ ' :
$
$ 3,631,000
$ -
$ :-
$ -
$ 'I --
$ 3631000=
2020
Street Reconstruction Non -Specific
Pavement/Recon
2
2850,000
429
1,100,000
825OOD
425, DOO
175,000
-
-
-
5,375,000
-
-
5,375,000
2020
Proect Totals
$ : :.
$
$ 2850000:
$: ;1,100000
$ 825,000
$ 'I 426,000
'.$ 175;000
$
$ -:
".:$
$ ". 5,373,000
$ -
$ i-
$ -
$ -'.:
$ 5,375000::
2021
Street Reconstruction Non -Specific
PavementlRecon
2
2,850,000
429
1,100,000
825 000
425,000
175,000
5,375 000
-
5,375,000
2021
Project Totals":".
'
5 - -
$ -
$ -:: 2,850,000'.
$t .1100,000
)$ 825,000
$ 425,000
$ 175;000
$ -
$ -: -
":$ -
$ 5,375,000
$ -
$ 1 '-
$ -
-'
$ 5375000+
2022
Street Reconstruction Non -Specific
Pavement/Recon
2
2,850,000
429
1,100,000
825 000
425,000
176,000
-
-
-
5,375 000
5,375,000
'. 2022
Project Totals -
$
$
$ -:' 2,850,000':
$ ';1,100,000
$ 826,000
$ 425,000
$ 175,000
$-
$ -
$ -
$ 5,375,000
$ -
$ ;:. '-
$ -
$ -::
$ 6,376,000
5,375,000
2023
Street Reconstruction Non -Specific
Pavement/Recon
2
2,850,000
429 1100,000
825,000
425,000
1750005,375000
2023
Project Totals -'.: :; ' .
$ I - :":
$ -
$ t. 2,850,000'.
$. S1,100,000
'$ 825000
$-" 425,000
'$ 175,000
$ -
$ i -
$ -
$ ' ": 5 375 000
$ -
$ I -
$ -
$ : -I
$ 537500:
2024
Street Reconstruction Non -Specific
Pavement/Recon
2
-
2,850,000
429
1,100,000
825 000
425,000
176,000
-
-
-
5,375,000
-
5,375 000
2024
Pro'eot Totals is
$ i - 'i
$ "-
$ ?.2,850,000'.
$': 11,100000
$ 825,000
$ 426,000
-:$ 175;000
$
$ -: _
'$ _
$ 5,375,000
$ '. -
$ -
$ -
$ is -'
$ 5;375,OW1;
Program Totals
$ 2,250,000
$ 943,646
$ 29,635,384
$ 115,330,5L51$
10,857,000
$ 3,645,000
$ 1,462,588
$ 394,120
$ 997,233
$
$ 460,000
$ 65,995,546
$ 1,300,000
$ 10,835,560
$ 1,550,000
$
$ 79,684,106
* OCI = Overall Condition Index (Scale 0-100, 0 poor, 100 excellent) OCI based on field evaluation
** If development occurs ahead of the City project, this project would be unnecessary. City would fund oversizing portion. Total 5 yr Bond $ 25,215,959 Tax Levy & Special Assessments
Total Recon Bond -10 Years $ 6,157,000
Total 429 Bond -10 Years $ 35,193,959
Total Tax Abatement -10 Years $ 3,615,000
Total Bonding -10 Years $ 44,965,959 Tax Levy & Special Assessments
Public Works (Parks) Total 221,771 309,417 530,137 308,958 430,389 1,800,671
Page 1 of 6
CITY OF PRIOR LAKE
PROJECTS
BY DEPARTMENT
ib�2142-�
CAPITAL IMPROVEMENT PROGRAM
Proposed 06.23.2014
2015-2019
��NNES�P
CIP
Project
Reference
2015
2016
2017
2018
2019
Total
Public Works (Parks)
Capital Replacement Projects
CIP1
48,165
182,103
174,004
173,891
66,270
644,432
General Fund - Parks Division
-
-
-
-
-
-
Revolving Park Equipment Fund
48,165
182,103
174,004
173,891
66,270
644,433
Park Amenities Replacement
CIP2
123,606
127,314
131,133
135,067
139,119
656,239
General Fund - Parks Division
123,606
127,314
131,133
135,067
139,119
656,239
Revolving Park Equipment Fund
-
-
-
-
-
-
Trail, Sidewalk, and Boardwalk Replacement
CIP3
-
-
-
-
-
-
General Fund - Parks Division
-
-
-
-
-
-
Revolving Park Equipment Fund
-
-
-
-
-
-
Natural Area Restoration
CIP4
-
-
-
-
-
-
General Fund - Parks Division
-
-
-
-
-
-
Revolving Park Equipment Fund
-
-
-
-
-
-
Neighborhood Park Development
CIP5
50,000
-
225,000
-
225,000
500,000
Capital Park Fund
50,000
-
225,000
-
225,000
500,000
Existing Trail & Sidewalk Gap Priorities
CIP6
-
-
-
-
-
-
General Fund - Parks Division
-
-
-
-
-
New Development Trail Alignments
CIP7
-
-
-
-
-
-
Capital Park Fund
-
-
-
-
-
-
Community Park Development and Renovation
CIP8
-
-
-
-
-
-
Capital Park Fund
-
-
-
-
-
-
Referendum
-
-
-
-
-
Public Works (Parks) Total 221,771 309,417 530,137 308,958 430,389 1,800,671
Page 1 of 6
•
CITY OF •
IMPROVEMENTCAPITAL -O
T
2015-2019
PROJECTS BY DEPARTMENT
Proposed 06.23.2014
CIP
Project Reference 2015 2016 2017 2018 2019 Total
Public Works (Streets)
Street Improvements (Co. Rd.)
CIPS 2,567,000 - 300,000 -
- 2,867,000
Project Levy
1,457,000 -
- 1,457,000
Special Assessments
- - -
-
State
- - - -
-
County
- - - -
- -
Other Municipality
- - - -
- -
City MSA Funds
700,000 - 200,000 -
- 900,000
Street Oversize Funds
150,000 - - -
- 150,000
Trunk Reserve Funds
- - - -
- -
Water Quality Fund
60,000 - - -
- 60,000
Water Fund
100,000 - 100,000
200,000
Sewer Fund
100,000 - - -
100,000
Street Improvements (City)
CIP10 13,906,546
6,615,000
4,605,000
7,496,000
3,631,000
36,253,546
Project Levy
2,748,384
3,050,000
3,440,000
2,620,000
Z070,000
13, 928, 384
Special Assessments
5,825,575
1,150, 000
380,000
1,865,000
610,000
9,830,575
Grant or Other Contribution
460,000
City MSA Funds
-
-
-
900,000
450,000
1,350,000
Street Oversize Funds
468,646
-
200,000
125,000
793,646
Trunk Reserve Funds
1,391,353
-
-
-
-
1,391,353
Water Quality Fund
287,588
135,000
35,000
70,000
20,000
547,588
Water Fund
2,300,000
1,820,000
580,000
1,581,000
251,000
6, 532, 000
Sewer Fund
425,000
460,000
170,000
260,000
105,000
1,420,000
Public Works (Streets) Total
16,473,546
6,615,000
4,905,000
7,496,000
3,631,000
39,120,546
Page 2 of 6
04 POMP
CITY OF PRIOR LAKE
PROJECTS BY DEPARTMENT
CAPITAL IMPROVEMENT PROGRAM
Proposed
06.23.2014
2015-2019
�NNESD�A
CIP
Project
Reference
2015
2016
2017
2018 2019
Total
Public Works (Water)
Meter Replacement Program
CIP11
-
-
-
- 2,000,000
2,000,000
Water Fund
-
-
- 1,000,000
1,000,000
Sewer Fund
-
-
- 1,000,000
1,000,000
Wells
CIP12
300,000
950,000
-
- -
1,250,000
Water Fund
300,000
950,000
-
- -
1,250,000
Watermain Improvements
CIP13
-
-
-
- -
-
Water Fund
-
-
-
-
-
Water System
CIP14
100,000
100,000
100,000
100,000 15,100,000
15,500,000
Water Fund
100,000
100,000
100,000
100,000 15,100, 000
15, 500, 000
Pressure Reducing Valves
CIP15
-
-
-
- -
-
Trunk Reserve Fund
-
-
-
- -
Water Storage
CIP16
-
-
-
- -
-
Water Storage Fund
-
-
-
- -
-
Public Works (Water) Total
400,000
1,050,000
100,000
100,000 17,100,000
18,750,000
Page 3 of 6
CITY OF PRIOR LAKE
60,000
60,000
60,000
PROJECTS 13Y DEPARTMENT
CAPITAL IMPROVEMENT PROGRAM
40ir't
260,000
Water Quality Fund
60,000
Proposed 06.23.2014
60,000
60,000
20,000
260,000
Pond Maintenance & Retrofit CIP21
100,000
2015-2019
300,000
25,000
400,000
850,000
Water Quality Fund
CIP
25,000
300,000
25,000
400,000
850,000
Project Reference
2015
2016
2017
2018
2019 Total
225,000
Water Quality Fund
50,000
100,000
25,000
25,000
Public Works (Sanitary Sewer)
225,000
Public Works (Storm Water) Total
210,000
185,000
385,000
Sanitary Improvement CIP17
-
-
-
-
- -
SewerFund
-
-
-
-
- -
Inflow / Infiltration Prevention CIP18
150,000
150,000
150,000
150,000
150,000 750,000
Sewer Fund
150,000
150,000
150,000
150,000
150,000 750,000
Sewer System Equipment Replacement CIP19
100,000
100,000
100,000
100,000
100,000 500,000
Sewer Fund
100,000
100,000
100,000
100,000
100,000 500,000
Public Works (Sanitary Sewer) Total
250,000
250,000
250,000
250,000
250,000 1,250,000
Public Works (Storm Water)
Stormwater Infrastructure Maintenance CIP20
60,000
60,000
60,000
60,000
20,000
260,000
Water Quality Fund
60,000
60,000
60,000
60,000
20,000
260,000
Pond Maintenance & Retrofit CIP21
100,000
25,000
300,000
25,000
400,000
850,000
Water Quality Fund
100,000
25,000
300,000
25,000
400,000
850,000
Stormwater Improvements CIP22
50,000
100,000
25,000
25,000
25,000
225,000
Water Quality Fund
50,000
100,000
25,000
25,000
25,000
225,000
Public Works (Storm Water) Total
210,000
185,000
385,000
110,000
445,000
1,335,000
Page 4 of 6
04 PRI2R
� CITY OF PRIOR LAKE PROJECTS BY DEPARTMENT
CAPITAL IMPROVEMENT PROGRAM Proposed 06.23.2014
2015-2019
'bi�soC
CIP
Project Reference 2015 2016 2017 2018 2019 Total
Transit
Transit Capital CIP23 - - - - - -
Transit Fund - - - -
Transit Total
Vehicles & Equipment
Equipment Replacement Plan
CIP24 797,550
1,104,265
693,932
1,339,883
664,939
4,600,569
Revolving Equipment Fund
797,550
1,104,265
693,932
1,339,883
664,939
4,600,569
Vehicle & Equipment Total
797,550
1,104,265
693,932
1,339,883
664,939
4,600,569
Facilities
Facilities Management Plan
CIP25 143,052
98,217
183,884
928,155
326,007
1,679,315
Facilities Management Fund
143,052
98,217
183,884
928,155
326,007
1,679,315
Project Levy
-
-
-
-
-
-
Facilities Total
143,052
98,217
183,884
928,155
326,007
1,679,315
Technology
Technology Plan
CIP26 143,353
236,170
235,154
230,241
212,367
1,057,285
General Fund
123,134
206,851
214,139
163,172
173,278
880,574
Water Fund
8,309
9,567
5,126
28,357
20,530
71,889
Sewer Fund
4,910
9,567
5,126
28,357
18,559
66,519
Water Quality Fund
-
1,167
1,202
-
-
2,369
Cable Franchise Fund
7,000
9,018
9,561
10,355
-
35,934
Technology Total
143,353
236,170
235,154
230,241
212,367
1,057,285
GRAND TOTALS 18,639,272 9,848,069 7,283,107 10,763,237 23,059,702 69,593,387
Page 5 of 6
•�CITY OF PRIOR LAKE
CAPITAL IMPROVEMENT PROGRAM
2015-2019
PROJECTS BY DEPARTMENT
Proposed 06.23,2014
CIP
Project Reference 2015 2016 2017 2018 2019 Total
TOTALS BY FUNDING SOURCES
Project Levy
Special Assessments
Grants or Other Contributions
State
County
City MSA Funds
Capital Park Fund
Street Oversize Fund
Trunk Reserve Funds
Water Quality Fund
Water Fund
Sewer -Fund
Water Storage Fund
Transit Fund
General Fund -Park Dept
General Fund -Technology Dept
Revolving Equipment Fund
Revolving Park Equipment Fund
Cable Franchise Fund
Facilities Management Fund
4,205,384
3,050,000
3,440,000
2,620,000
2,070,000
15,385,384
5,825,575
1,150, 000
380,000
1,865,000
610,000
9,830,575
460,000
-
-
-
-
460,000
700,000
-
200,000
900,000
450,000
2,250,000
50,000
-
225,000
-
225,000
500,000
618,646
-
-
200,000
125,000
943,646
1,391,353
-
-
-
-
1,391,353
557,588
321,167
421,202
180,000
465,000
1,944,957
2,808,309
2,879,567
785,126
1,709,357
16,371,530
24,553,889
779,910
719,567
425,126
538,357
1,373,559
3,836,519
123,606
127,314
131,133
135,067
139,119
656,239
123,134
206,851
214,139
163,172
173,278
880,574
797,550
1,104,265
693,932
1,339,883
664,939
4,600,569
48,165
182,103
174,004
173,891
66,270
644,433
7,000
9,018
9,561
10,355
-
35,934
143,052
98,217
183,884
928,155
326,007
1,679,315
18, 639, 272
9,848,069
7,283,107
10, 763, 237
23, 059, 702
69, 593, 387
(0)
(0)
(0)
0
(0)
0
Page 6 of 6