HomeMy WebLinkAboutPreliminary Site Plan Review 2002 July 1, 2002 Mr. Gary Fischer Tushie Montgomery Architects 7645 Lyndale Avenue South, Suite 100 Minneapolis,MN 55423-4084 RE: Prior Lake Senior Housing Following are the results of the preliminary Site plan review for the Keystone building. Our review was based on the Minnesota State Building Code (MSBC) which adopted with amendments the 1997 Uniform Building Code (UBC) with handicap regulations of the Minnesota Accessibility Code Chapter 1341. Also requirements of the 1998 Minnesota State Fire Code (MSFC) which adopted with amendments the 1997 Uniform Fire Code (UFC). 1. Submit signed HVAC, plumbing, kitchen, elevator, fire/smoke alarm, emergency lighting/exit signs and sprinkler plans. May be submitted at a later date. 2. If a lawn irrigation system is installed, a lawn irrigation permit including a plan layout is required. The pressure vacuum breaker equipment should be located at the highest elevation of the project as the pressure vacuum breaker must be 1.0' above the highest elevated sprinkler head. Provide detail of lawn sprinkler service stub valve and backflow prevention details. 3. Sht. C 1.0: Domestic water shutoff valve to be located in city Right-of-Way. 4. Sht. C 1.0: Add"No parking Fire Lane" signs to islands and by fire hydrant. 5. Sht. L 1.0: Provide egress for Fire Department vehicles in Parking lot. The proposed Parking lot will not provide for 45' turning radius required for Fire Department vehicles. 6. Detail 2 and 3/A1.1: Steel stud area separation wall must extend to outside sheathing, fascia, soffit and roof sheathing. Presently the 2x6 exterior wood wall interfaces with the adjacent building exterior wood stud wall.UBC 504.6.1. 7. Detail 1/A 1.4 Note#3: Add"no openings in soffits or fascia". J:\BUILDING\LETRMEMO\Keystone\Keystone#1.do c Tushie Montgomery Architects July 1,2002 Page 2of3 sidelights L, M, N, Q, R; Safety glazing required. 8. Detail 1/A2.2: Door windows and sideli g UBC 2406.1. re uired. UBC 9. Detail 1/A2.2: Windows J,0,P; three-fourths hour fire-resistive rating q 1004.3.4.3.2.2• separation information as per GA manual section cl area placement. walls,Detailn3/A2.o #7:oProvide mf cts to contact gypsum wallboard manufacturer on aluminumChapter 12. instructs UBC Appendix p 11.Detail 4/A2.2 :Provide a sound transmission class rating. s rinlclered. Draft 12. russes must be stopping Detail 4/A2.2: The concealed area of the flooret Zed in National Fire Protection stopping one side of the floor truss is not r � Association(NF PA) 13, 4-13.1.1 also see NFPA A-1-4.6. 13. Detail 6/A2•2• 1/2" of sound batt. The UL design No. L514 does not include 3 insulation.Please clarify• and spindle shall be less 14. Detail 2/A3.2 and Sht. A 7.3: Openings between newel posts than a 4" dimension.UBC 509.3. stairwells and shaft walls must be lhr fire-resistive floor framing and completely surrounding shaft framing. 15.oDetail 6 and 8/A5.7: all 1 construction continuously thru for detail comparable to detail 6/A5.7 and detail 9/m She stair offsets Stair #3 ala floor: Provide walls and floorsystem door 3S3, perpendicular members of the floor, at the stair of wall containing floor and any supporting shaft walls below. The walls, same fire-resistive rating as shaft walls. The stair shaft C 711.2. must must beaconstructed from the djacent floor and wall construction.UB must be separated workings of doors 1S5A and 1C3 and of their hardware soup 17. Provide narrative on wo g 22 and 23. 18.Door 304: 60 minute rating required.UBC 310. ier at the ground floor stairs.UBC 1005.3.3.4• 19.Provide a detail of the gate/barr 20. Sectionecial Inspections schedule. 01420: Submit the Acknowledgements for the Sp Tushie Montgomery Architects July 1,2002 J ;\BUILDIN G\LETRMEMO\Key stone\Key stone#1.do c