HomeMy WebLinkAboutPVB TEST REPORT 9/13/2016 1
,
,
1
Pressure Vacuum Breaker Assembly (PVI.t) & Spill Resistant Pressure Vacuum Breaker
Test Report
I--
. _
_ _____ .
,i.,,,
17 6 '7 ac,,, V.et,Jtor L-9
tE
11,6 110 P a 4.1 4 441 0 7 8 1:1--
,
Y 0
r
> Shutoff#2 Gate Check Valve Air Inlet Valve SRPVB -Tightness of
I'VB Check Valve
Valve
Leaking( )
Initial Test Leaking ( )
Closed Tight( ) Failed to Open ( ) Failed to Open ( )
Pressure Drop Across .
Closed Ti•ht 44 Check Valve#11:3_p id 0.ened at 4sid —psid
Any Repairs/parts
Used Air Inlet Valve
_ Leaking O
Final Test Leaking ( )
Closed Tight( ) Opened at _psid Failed to Open ( )
Pressure Drop Across ( p
psid
Closed Tight( ) Check Valve#1 psid Openedat - -sid
Certification
I hereby certify the foregoing data to be correct and that the device Assembly Final Test Performance
tested is functioning within th irnits of , c standards
Pass
Signature L_.- .. ,---
Fail ❑
Date: 9 3 ,S`G—)dr. _
Royce Roberts Certification #PM063607
Gary Pegues Cerification #PM064908
Sabre Plumbing Heating and NC
15535 Medina Road, Plymouth, MN 55447
763-473-2267
Plumbing Bond License: PM645349