HomeMy WebLinkAbout01(B) - Ponds Park Phase 2 update ReportH
H
P P P P P P
PPPPP
F
F
=
1
0
0
0
.
7
3
F
F
=
1
0
0
0
.
7
6
F
F
=
1
0
0
0
.
7
4
TRASH
TRASHTRASH
P
P
C WSM
TRASH
H
M
TILEI=977.00
F
F
=
9
8
7
.
2
1
FF
=
9
8
7
.
6
5
FF
=
9
8
7
.
6
8
FF
=
9
8
7
.
5
2
TRASH
FF=1
0
0
0
.
6
7
P
FF
=
1
0
0
0
.
6
9
TRASH
TRASH
PPPPP
PPPPP
I=975.42I=975.47
CB
R=982.750.00I=0.00I=I=0.00I=0.00I=0.00I=0.00I=978.72
FF=984.18
I=969.00I=969.25
W
U
CLVTI=975.15
I=968.28I=968.63
+999.35
landing
995.90
+
landing
993.2+993.2+
+999.54
995.90+
995.84+
995.62+995.62+
996.10+
989.97+
985.80+
985.50+
985.26+
985.26+
985.26+984.74+
984.52+
982.75+983.35+
983.35+
982.75+
983.20 E+
983.53 E+
992.50 ?+
992
991+
+993.0
+986.0
landing
landing
landing
landing
X 990.77
X 992.81
4.5%
2
.
0
%
X 992.93
X 992.14 X 992.26 TC
2%
X 992.62?
2%?
X EX990.70
987.0+
X 990.80TC
X 992.23 TC - EX
1.8%
X 991.37 TC - EX
X 990.76 TC
X 991.30 TC - EX
X
9
9
1
.
8
7
T
C
-
E
X
X EX990.53?
1.2
%
X 990.70
8' B
E
N
C
H
X P 990.24
X P 991.00
X P 990.73
X P 991.00
X P 991.50
2
LD1
8' BE
N
C
H
8'
B
E
N
C
H
8' B
E
N
C
H
8' BE
N
C
H
980 980
976
9
8
0
9
7
6
980
981
982
98
2
9
8
3
9
8
5
98
6
985
984
972
97
1
975
980
9
7
5
979
96
4
96
5
97
0
97
5
98
0
980
985
99
0
985
990
995
990
99
5
99
0
9
8
5
1000
99
8
RevisionDate By
HKGI Project No.:
Drawn by:AJB
Checked By: BH
Sheet Title:
Project:Client:SHEET
CITY OF PRIOR LAKE, MINNESOTA
PRIOR LAKE PONDS PARK-PHASE 2
Designed by: AJB, KC
CITY OF PRIOR LAKE
PUBLIC WORKS
project # 2021-XX
I hereby certify that this plan was prepared by me or under
my direct supervision and that I am a duly licensed
Landscape Architect under the laws of the State of Minnesota.
Bryan Harjes, PLA (MN, MI)
Registration No.Date
800 WASHINGTON AVE N. #103
MINNEAPOLIS, MN 55401
www.hkgi.com
42954
T1.01
GRADING WORK LIMITS
T0.01 TITLE SHEET
C0.01 EXISTING CONDITIONS
C1.01 MNDOT PED RAMP STD DETAILS
C1.02 MNDOT PED RAMP STD DETAILS
C1.03 MNDOT PED RAMP STD DETAILS
C1.04 MNDOT PED RAMP STD DETAILS
C1.05 MNDOT PED RAMP STD DETAILS
C1.06 MNDOT PED RAMP STD DETAILS
C2.01 EROSION CONTROL PLAN
C2.02 SWPPP PLAN
C2.03 SWPPP NARRATIVE
C2.04 SWPPP SOILS
C3.01 SITE GRADING PLAN
C3.02 SITE GRADING PLAN
C4.01 UTILITIES
R0.01 REMOVALS
L1.01 SITE FEATURE LAYOUT
L1.02 SITE FEATURE ENLARGEMENT PLAN
L2.01 PLANTING/IRRIGATION PLAN
L3.01 SITE FEATURE DETAILS
L3.02 SITE FEATURE DETAILS
L3.03 SITE FEATURE DETAILS
L3.04 SITE FEATURE DETAILS
L3.05 SITE FEATURE DETAILS
L3.06 SITE FEATURE DETAILS
L3.07 SITE FEATURE DETAILS
L2.08 SITE FEATURE DETAILS
SITE LOCATION MAP
CITY OF PRIOR LAKE
PONDS PARK BALLFIELD
IMPROVEMENTS - PHASE 2
PROJECT LOCATION
CITY HALL
17000 Ponds Pkwy SE, Prior Lake, MN 55372
EXISTING
BATTING
TUNNEL
SOUTH FIELDS
CONVERSION TO LITTLE
LEAGUE PLAY
EXISTING TURF STAY -
WITH IRRIGATION
ADJUSTMENTS
0
200'100'50'
NEW CONCRETE PLAZA/WALKS
REPAVE AND RE-ALIGN
SOUTH BIT TRAIL
SHADE STRUCTURE
EXISTING FIELD
LIGHTS STAY
EXISTING
SCORE BOARD
STAYS
EXISTING
SCORE BOARD
STAYS
4ft stand
over ht
6ft
8ft
REPLACE NORTH
EXISTING OLD OUTFIELD
FENCING, INCLUDE
FENCE GAP
SHADE TREES
NEW PED RAMP
TITLE SHEET AND SHEET INDEX
EXPAND IRRIGATION
SYSTEM EXTENTS
BUILDING SEWER AND WATER EXTENSION TO
BALL FIELD HUB, SEE CIVIL
M:\Prior Lake\024-009-PRIOR LAKE PONDS PARK PHASE 2\8 Autocad\Construction Documents\024-009 PONDS PARK LAYOUT BASE PH 2.dwg, 1/17/2025 7:35:16 AM, DWG To PDF.pc3