CITY COUNCIL AGENDA REPORT
MEETING DATE: October 14, 2025
PREPARED BY: Philip Ryan, Public Works Supervisor - Utilities
PRESENTED BY: Nick Monserud, Public Works Director/City Engineer
AGENDA ITEM: Resolution to Ratify License Agreement with DNR – License for
Utility to Cross Public Waters
RECOMMENDED ACTION:
Approve a resolution to ratify the license agreement with the Minnesota Department of Natural
Resources for channel crossing near the Harbor development.
BACKGROUND:
As part of the lakeside sewer lining project, the contractor is required to bypass pump a section
of sanitary sewer that runs under Prior Lake. This process requires a permit from the DNR. In
order to obtain that permit, the DNR requires a license agreement for the sewer line that runs
under channel leading to the Harbor docks.
This sanitary pipe was installed in 1974. At that time, license agreements were not required and
no permit could be found on file. As a result, to meet current DNR standards, the DNR is
requiring the City to execute a license agreement so the necessary maintenance can be
performed on this sanitary sewer. This pipe is part of the lakeside sewer lining project currently
underway.
FINANCIAL IMPACT:
The initial application fee paid to the DNR was $2,250. The fee for the license is $237, resulting
in a total cost of $2,487. These costs are included as part of the lakeside sewer lining project.
ALTERNATIVES:
1. Motion and second as part of the consent agenda to ratify the license agreement with
the DNR.
2. Motion and second to remove this item from the consent agenda for additional
discussion.
ATTACHMENTS:
1. Resolution
2. Lakeside Sewer Lining - Location Map
3. License for Utility to Cross Public Waters
City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372
4646 Dakota Street SE
Prior Lake, MN 55372
RESOLUTION 25-
A RESOLUTION TO RATIFIY A LICENSE AGREEMENT WITH THE DNR – LICENSE FOR
UTILITY TO CROSS PUBLIC WATERS
Motion By: Second By:
WHEREAS, as part of the lakeside sewer lining project (2021-14), the contractor is
required to bypass pump a section of sanitary sewer that runs under Prior
Lake; and
WHEREAS, a DNR permit is required for any work done under the lake; and
WHEREAS, in order for the DNR to issue a permit a license agreement is required to be
executed with the DNR; and
WHEREAS, City staff have reviewed the license agreement and recommend executing
said agreement.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. The Mayor and City Council hereby ratify the authorization of the City Manager to execute a
license agreement with the DNR.
th
Passed and adopted by the Prior Lake City Council this 14 day of October 2025.
VOTE Briggs Braid Churchill Lake Hellier
Aye
☐ ☐ ☐ ☐ ☐
Nay
☐ ☐ ☐ ☐ ☐
Abstain
☐ ☐ ☐ ☐ ☐
Absent
☐ ☐ ☐ ☐ ☐
______________________________
Jason Wedel, City Manager
H A R B O R
P L N E
GREEN WAYAVE
NE
H A R B O R B C H N E
WILD OAKS TER NE
C O N R O Y S T N E
HARBORVIEWCIRNE
42
Scott County GIS
REVERE WAY
F R A NKLIN
T RLSE
CONNE L L Y P K W Y
FI S H POI N T RD
SE
C ROSSAN
D
RASTSE
HORIZON
DR
W
I
L
DS
P
KWY
NW
150TH ST W
VALLEY VIEW
RD
CASEY PKWY
P
IKE
LAKETRL
N
E
ST
E
MME RRIDGE
RDNW
N
ORT H W O O D RD
N W
150TH
ST SE
C
ARRI A GEH I L L
RD
170TH ST E
160TH ST NW
W
I
L
D
S
R
D
G
N
W
12
8314
23
82
18
17
44
42
27
78 16
21
This product is for informational purposes and is not suitable for legal, engineering, or surveying
purposes. This product has been produced by the City of Prior Lake for the sole purpose of
geographic reference. No warranty is made by the City of Prior Lake regarding specific accuracy
or completeness.
0 0.03 0.05 0.08 0.1
Miles
Lakeside Sewer Lining Project
Council Item Location Map
10/3/2025
Page 1 of 4
License Number UWAT014344
MINNESOTA DEPARTMENT
OF NATURAL RESOURCES
LICENSE NUMBER UWAT014344
COMPANY PROJECT NO: 900-24-416 Prior Lake/SEH
LICENSE FOR UTILITY TO CROSS PUBLIC WATERS
This license is issued by the State of Minnesota, acting by and through its commissioner of natural resources,
and hereafter called the “State”, under authority and subject to Minnesota Statutes, section 84.415, and Minnesota
Rules Chapter 6135 and other applicable law, to the Licensee as named and for the fee and term as specified below.
Name and Address of Licensee: City of Prior Lake
4646 Dakota Street SE
Prior Lake, MN 55372
License Fee: Two hundred thirty-seven and NO/100 Dollars
($237.00)
Term (years): 50 Years
Effective Date: October 15, 2025
Expiration Date: October 14, 2075
Purpose of License: Construction, maintenance and operation of a solids in suspension pipeline under water under the
covenants and agreements of the Licensee to use the following described waters:
That part of the following descriptions as shown on the attached application and map, all of which are made a part
hereof by reference.
Lake Lower Prior in Section 30, Township 115 North, Range 21 West, in Scott County
This license is granted subject to the following provisions:
1. Use of premises.
A. This license is subject to the provisions of Minnesota Statutes, section 84.415 and Minnesota Rules Chapter
6135. All standards of Chapter 6135 are incorporated as terms and conditions of this license, except such
variations as are identified and approved by the State in the license applications, plans and specifications
which are attached and made part of the terms and conditions of this license. The Licensee is bound by the
crossing location and installation method as detailed in the application and approved by the State. The
Licensee shall not deviate from the terms and conditions of this license or the application as approved by the
State unless it has first obtained written permission from the State.
B. When the installation occurs more than six months after the issuance of the license, the Licensee shall contact
the State 20 days prior to installation.
C. No merchantable timber shall be cut, used, removed or destroyed without first paying the State the timber
value in the sum stated above as determined by the State. Slash material on state water crossings must be
disposed of within 30 days of clearing activ ities.
D. For overhead crossings of state waters, lines shall have a minimum clearance of 25 feet above the water,
unless otherwise approved by the State.
E. When directed by the State as a condition of the license, flight diverters shall be placed on overhead utility
lines.
F. Any cable or conduit located at a shoreline shall be sufficiently buried so that it does not become exposed.
G. When directed by the State as a condition of the license, underwater crossings shall be marked by permanent
signs on the banks at the points where the line enters and leaves the public waters.
H. To protect fish spawning activities, the State may prohibit work in the public water or within a specified
distance of the public water during the spawning season.
2. State’s rights and reservations. The use of these waters by the Licensee in constructing or maintaining the lines
for which this license is granted shall be subject to the use, sale, or leasing for mineral or other legal purposes. The
Page 2 of 4
License Number UWAT014344
Licensee will not cause any unnecessary hindrance to the activities of the State and shall allow access across the
license area by the State when needed.
3. Erosion and Revegetation.
A. Erosion control measures shall be adequately designed for site characteristics. They shall be installed prior to
commencement of construction and maintained for as long as needed. All erosion control measures installed
next to a water body shall run parallel to the contours.
B. All disturbed areas shall be restored to original contours and elevations and stabilized as soon as possible
following construction. Areas of subsidence and crowning shall be repaired. Topsoil shall be reserved on site
and used to re-dress disturbed areas.
C. All disturbed areas shall be revegetated using state approved seed mixes. All seed and plant materials shall be
certified weed-free. Weed-free straw or hay shall be used for mulching and erosion control. Native species
plants should be used, whenever possible, to revegetate disturbed areas. This revegetation should occur as
early in the season as possible to permit adequate regrowth.
D. The Licensee shall monitor revegetation at state water crossings until the site is stabilized and the vegetation
is self-sustaining. Where severe or repeated damage is occurring or where measures have not been successful,
preventative and corrective actions shall be taken by the Licensee, including construction of appropriate
barriers, installation of warning signs, and other methods in consultation with the State.
E. The Licensee shall routinely inspect for erosion that may develop during the term of the license. Areas of
erosion shall be stabilized by the Licensee.
F. If a disturbed area cannot be stabilized with vegetation before September 15 in the year that the utility was
installed, the Licensee shall submit a written site stabilization plan to the State for approval. This plan shall
describe erosion control, mulching, dormant seeding and monitoring. Seeding shall occur as soon as soil
conditions are suitable.
G. Excavated materials shall not be deposited or stored alongside public water in a manner where the materials
can be redeposited into the public water by reasonably expected high water or storm run -off.
4. Herbicides and Pesticides.
A. The Licensee must request and obtain written permission to apply herbicides or pesticides to state waters from
the State prior to treatment. This request shall consist of (1) a map identifying proposed treatment areas and
(2) a description of the proposed treatment plan, including target species, herbicide or pesticide name, rate of
application, a description of application method, and beginning and end dates. All applications must be
according to label regulations and as otherwise specified by the State. T he Licensee shall not apply pesticides
that are restricted for use on certified state forest land administered by the State.
B. The Licensee must submit annual reports detailing herbicide or pesticide application on areas covered under
the license. The report must include the dates, acres, location expressed as quarter -quarter section, township
and range, herbicide or pesticide used, target species, and such other information as may be reasonably
required by the State for the purpose of verifying herbicide or pesticide use.
C. The Licensee shall post all places commonly used by the public for access along the utility corridors treated
with herbicides or pesticides.
5. Invasive Species.
A. The Licensee shall inspect all state water crossings for the presence of invasive species and noxious weeds
prior to commencing clearing activities and take action to prevent their spread. For installation of the utility
line, the State will identify on a map the known infested sites to be avoided. For maintenance and operation,
the Licensee is responsible for obtaining updated information on known infested sites.
B. If the State or the Licensee discover additional invasive species infestation areas on state water crossings
during construction, the Licensee shall immediately take action to prevent spread from the newly discovered
infested area and then consult with the State on a resolution.
C. The Licensee shall prevent invasive species from entering into or spreading within state water crossing by
cleaning equipment and clothing prior to arriving at the license area. The Licensee shall legally dispose of
material cleaned from equipment and clothing at a location offsite and the materials must be secured prior to
transport to avoid dispersal.
D. Whenever possible, parking, staging areas and travel routes shall not be within known infested sites. Where
there are multiple state water crossings and at least one contains invasive species, the Licensee shall to the
extent practicable start work at the site with the fewest number of invasive plants, leaving the most heavily
Page 3 of 4
License Number UWAT014344
infested sites to last. The Licensee shall make every effort to schedule operations and site visits to avoid the
spread of weed seed.
E. The Licensee shall continue to control invasive species on state water crossings for the terms of the license
using methods approved by the State.
6. Crossing of State Trail.
A. The location of any crossing of a state trail must be approved in advance by the State. The State may provide
written instructions as to specific construction standards to be followed for the crossing of the state trail.
B. Utility installation and maintenance activities shall be conducted in a manner so as to minimize disturbance of
state trail use and to separate the public from work areas. The Licensee must provide signs to warn state trail
users of construction hazards.
C. The Licensee is responsible for repairing any damage to the state trail in a manner satisfactory to the State.
D. For maintenance and operations, prior approval must be obtained from the State for the cutting or trimming of
trees within the state trail right-of-way.
E. The Licensee may not close the state trail right-of-way without the prior written approval of the State.
7. Maintenance, operations and repairs.
A. The Licensee must keep the premises in a neat and orderly condition, and shall remove all refuse and debris
that may accumulate thereon.
B. After initial installation, no merchantable timber shall be cut, used, removed or destroyed by the Licensee
without first contacting the State at least 60 days in advance to determine if a timber payment is needed. Slash
material on state water crossings must be disposed of within 30 days of maintenance activities.
C. Emergency repairs and replacements may be made without prior notification to the State by the Licensee
according to conditions and standards prescribed by Minnesota Rules, Chapter 6135 and the method of
installation identified in this license. The Licensee shall notify the State of this activity as soon as practicable.
D. The Licensee shall employ appropriate erosion and sedimentation measures at the site during any emergency
repairs. The State must approve plans for restoration of the site after the emergency repairs are conducted.
E. Other than the herbicide or pesticide application reporting as provided in paragraph 4, the Licensee shall
notify the State of the extent and method of any routine maintenance and the proposed schedule. The
notification must be in writing and must be provided either annually or at least 20 days prior to commencing
any routine maintenance work on state water crossings subject to this license. The Licensee shall include a
specific description of the proposed maintenance activities including location, clearing methods, erosion and
sedimentation control measures, removal of merchantable timber, revegetation plans, and plans for preventing
the spread of invasive species. The Licensee may commence any routine maintenance work unless notified to
the contrary by the State within 20 days after the State’s receipt of the maintenance plan. The State may
require the Licensee to adjust its maintenance plans due to natural resource management concerns.
8. State inspection. The project hereunder shall at all times during and after construction be subject to inspection by
the State and for that purpose the Licensee shall grant access to the premises at all reasonable times.
9. Compliance with laws. The Licensee shall comply with all federal, state and local laws and regulations, including
municipal ordinances, affecting said lands or the area in which they are situated.
10. Taxes and assessments. The Licensee will pay when due all taxes and assessments levied against said waters or
any improvements owned, used, or controlled by the Licensee, provided that the taxes or assessments are imposed
due to this license.
11. Enforcement. No delay by the State in enforcing any of the conditions of this license shall operate as a waiver of
any of its rights.
12. Liability. This license is permissive only. No liability shall be imposed upon or incurred by the State of Minnesota
or any of its officers, agents, or employees, officially or personally, on account of the granting of the license or on
account of any damage to any person or property resulting from any act or omission of the Licensee or any of its
agents, employees, or contractors relating to any license matter. This license shall not be construed as estopping or
limiting any legal claims or right of action of any person against the Licensee, its agents, employees, or contractors
for any damage or injury resulting from any such act or omission, or as estopping or limiting any legal claim or
right of action of the State against the Licensee, its agents, emplo yees, or contractors, for violation of or failure to
comply with the provisions of the license or applicable provisions of law. The Licensee shall indemnify and hold
Page 4 of 4
License Number UWAT014344
harmless the State from all claims arising out of the Licensee's use of the above described lands whether such
claims are asserted by civil action or otherwise.
13. Termination and cancellation.
A. At the end of the license period and if both parties wish to renew, the renewal fee will be determined by the
State.
B. This license shall be cancelable upon reasonable notice by the State for violation of any of its terms, or if at
any time its continuance will conflict with a public use of the land over or upon which it is granted, or for any
other reason. Licensee shall ensure that Licensee's employees, agents and contractors have r eceived and
thoroughly understand all conditions of this license.
C. Unless otherwise authorized by the State, upon the surrender, expiration or cancellation of this license, the
Licensee shall remove from the above described lands all the utility lines and related structures owned by it. If
Licensee does not remove such lines or related structures, all such lines or structures remaining shall become
the property of the State, to be used or disposed of as the State elects. If the State requires the Licensee to
remove utility lines and related structures and Licensee fails to do so, the Licensee agrees to pay the State for
the costs of removing and disposing of such lines or structures.
14. Assignment or transfer. The Licensee shall not without the State's prior written consent: a) assign, convey or
otherwise transfer this license or any interest under it; b) sublet the license corridor or any part thereof; or c)
permit the use or occupancy of the license corridor or any part thereof by anyone other than the Licensee. This
license shall extend to, and bind the successors, heirs, legal representatives and assigns of the Licensee, if any. The
State may require a party who has requested to sublet, use or occupy the license corridor to obtain a separate
license from the State prior to occupying or using the license corridor.
15. Reports. The Licensee must submit reports on herbicide and pesticide use as provided in paragraph 4 and
maintenance and repair work as provided in paragraph 7.
16. Contacts. The contact for the State is the Regional Lands and Minerals Manager, who is at the time of license
issuance Joe Rokala at 218-328-8923. Any questions about this license shall be directed to the Regional Lands and
Minerals Manager. The Regional Lands and Minerals Manager may direct the Licensee to contact additional State
staff for reviews and approvals.
17. Special provisions. This license is subject to the SPECIAL PROVISIONS. None.
ACCEPTED AND ACKNOWLEDGED
CITY OF PRIOR LAKE
Licensee
By ________________________________________
Name ______________________________________
Title _______________________________________
Date _______________________________________
Form approved by Lands and Minerals Division, DNR, March 5, 2015.
STATE OF MINNESOTA
DEPARTMENT OF NATURAL RESOURCES
By ____________________________________________
Regional Manager
Lands and Minerals Division
Date ___________________________________________