HomeMy WebLinkAbout05(E) - Resolution Awarding the Contract for Control Panel Replacement at Watzl’s Lift Station Report ITEM: 5E CITY COUNCIL AGENDA REPORT MEETING DATE: December 09, 2025 PREPARED BY: Christine Watson, Public Works Supervisor – Administration Phil Ryan, Public Works Supervisor – Utilities PRESENTED BY: Nick Monserud, Public Works Director/City Engineer AGENDA ITEM: Resolution Awarding the Contract for Control Panel Replacement at Watzl’s Lift Station RECOMMENDED ACTION: Adopt a resolution awarding the contract for control panel replacement at Watzl’s lift station. BACKGROUND: The City operates 41 sanitary lift stations that manage the wastewater conveyance into the Metropolitan Council system for treatment at the Blue Lake wastewater treatment plant in Shakopee. The Watzl’s lift station is located near Watzl’s Beach and servers approximately 45 properties in the area. In August 2025, the Watzl’s lift station control panel sustained damage when a tree fell on the panel (see photos). The panel compartment is dented and no longer water tight, which puts the internal electrical components at risk of further damage or malfunction. Staff acquired quotes from Total Control Systems, Inc. to repair or replace the panel. The League of Minnesota Cities (LMC) has determined that full replacement of the panel will be covered by insurance, after the city pays the $25,000 deductible. City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372 Item 5E Page | 2 The quote from Total Control Systems, Inc. to provide, install, and program the new control panel at Watzl’s lift station is $50,380. There will be some additional charges (estimated to be $5,000 or less) for electrical work once the new panel is installed. Total Control Systems staff have performed a significant amount of work on our sanitary sewer system components in the past and are familiar with the current setup and programming. Using a single-source contractor for this type of work is desirable to maintain consistency, continuity, and efficiency for this critically important function of wastewater management. The LMC has already reviewed the quotes and given approval for the panel replacement to be covered by insurnace. FINANCIAL IMPACT: The project is part of an insurnace claim that will be covered by the LMC, with the $25,000 deductible being paid from the 2025 Sewer Utility Fund. ALTERNATIVES: 1. Motion and second as part of the consent agenda to adopt a resolution awarding the contract for control panel replacement at Watzl’s lift station. 2. Motion and second to remove this item from the consent agenda for further discussion. ATTACHMENTS: 1. Resolution 2. Quote October 29, 2025 To: Brad/Phil Re: Prior Lake, Minnesota –Watlz Lift Station panel. ________________________________________________________________ Total Control Systems, Inc. (TCS) proposes to furnish equipment and services in accordance with the project plans and specifications that were received. Section 16900 Submersible Lift Station Controls 240v single phase power 10hp 3ph pumps Including: Lift station control panels Main breaker /Manual Transfer sw. with interlock 100 amp (SE rating) NEMA 3R 2 door stainless steel enclosure 36h x 60w x 12d Inner doors Enclosure SS legs and skirts with louvers 18” Ventilation Fan and Filters SS hoods with thermostat Incoming power terminal block Power TVSS 70K Pump circuit breakers (2) Control circuit breakers (4) Hand-Off-Auto switches, oil tight, 30 mm (2) Pushbutton switches, oil tight 30mm (2) Lamps, LED, oil tight, 30mm (12) Condensation heater/fan, 400 watt Air Conditioner Stainless steel 4000Btu Air Conditioner circuit breaker Starters, VFD ABB ACS580 20hp Power monitor Relays GFI receptacle rated at 20 amps External alarm strobe Generator receptacle 100 amp Reuse and install Control power TVSS Radio, Cradlepoint Reuse/Mount Antenna RF Lead-in and connectors Uninterruptible power supply (UPS) 850va Allen-Bradley Micrologix 1400 equipment Backup float controller Operator interface Cmore 7” color Elapsed time meters (3) Panel Temperature sensor Space for Fiber Equipment RTU outlet Floats (2) Total Control Systems, Inc 38841 Nyman Drive NE PO Box 40 Stanchfield, MN 55080-0040 Phone 320-396-4442 / Fax 320-396- 4443 Float weight kit Submersible transmitter Keller Door switches (Security) Alarm text programming Remote Access Programming, training Documentation Testing and commissioning Price for the Watlz SLS control panel: $50,380.00 total labor and materials. Does not include: Sales Tax. (Exempt) Seal fail and Overtemp modules (Reuse) Concrete pad for panel Hand holes Meter sockets/Cold sequence disconnects Grounding materials Underground warning tape Installation of panel Conduit Permits Antenna Poles/Mast Site Lamp Fixtures Demolition Any wire external to panel - We acknowledge receipt of Addendum No . - Terms are Net 30 days from invoice date. No retainage allowed. A 1.5% charge per month added to any past due balance. Price may be dependent on past credit history. - This quote/proposal valid for 60 days. - Work to commence after receipt of an acceptable written purchase order acknowledging acceptance of our terms. - F.O.B. job-site. - Start-up service/training, documentation and equipment adjustment is included as specified. - TCSI does not accept any liquidated damages. - ALL PANELS FURNISHED BY TCS WILL HAVE A UL 508 SERIALIZED OR UL698A ENCLOSED INDUSTRIAL CONTROL PANEL RELATING TO HAZARDOUS LOCATIONS WITH INTRINSICALLY SAFE CIRCUIT EXTENSIONS LABEL, AS REQUIRED. Sincerely, TOTAL CONTROL SYSTEMS, INC. Al Doberstein AD/kd Drawings 4-8 weeks after receipt of acceptable order. Equipment 10-16 weeks after approval. Accepted By ___________________________ Date __________ 4646 Dakota Street SE Prior Lake, MN 55372 RESOLUTION 25- A RESOLUTION AWARDING A CONTRACT FOR CONTROL PANEL REPLACEMENT AT WATZL’S LIFT STATION Motion By: Second By: WHEREAS, the Watzl’s lift station sustained damage from a fallen tree, which puts the internal electrical components at risk of failure or malfunction; and WHEREAS, Total Control System, Inc. has provided a quote in the amount of $50,380 to provide, install, and program a new lift station panel; and WHEREAS, the League of Minnesota Cities (LMC) has reviewed the incident and determined that it is eligible for insurance coverage above the $25,000 city deductible; and WHEREAS, staff recommend city council award a contract to Total Control Systems, Inc. in the amount of $50,380 to replace the Watzl’s lift station control panel. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. The City Council authorizes a contract with Total Control Systems, Inc. in the amount of $50,380 for control panel replacement at Watzl’s lift station. 3. Funding will come from the Sewer Utility Fund ($25,000) and LMC insurance coverage. th Passed and adopted by the Prior Lake City Council this 9 day of December, 2025. VOTE Briggs Braid Churchill Lake Hellier Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ ______________________________ Jason Wedel, City Manager