HomeMy WebLinkAbout05(F) - Resolution Awarding the Contract for the Shady Beach Lift Station Pump Replacement Report ITEM: 5F CITY COUNCIL AGENDA REPORT MEETING DATE: December 09, 2025 PREPARED BY: Philip Ryan, Public Works Supervisor-Utilities Christine Watson, Public Works Supervisor-Administration PRESENTED BY: Nick Monserud, Public Works Director/City Engineer AGENDA ITEM: Resolution Awarding the Contract for the Shady Beach Lift Station Pump Replacement RECOMMENDED ACTION: Adopt a resolution awarding the contract for the Shady Beach lift station pump replacement. BACKGROUND: The city operates 41 sanitary lift stations that manage the wastewater conveyance into the Met Council system for treatment at the Shakopee wastewater treatment plant. These lift stations are inspected weekly, cleaned at least twice annually, and inspected annually by a contracted professional in an effort to maximize the useful life of the components. The pumps and other control components are recommended for rehabilitation every 15-20 years. The Shady Beach lift station is 51 years old and the pumps were last replaced in 2004. This lift station serves 40-50 homes. The existing guide rail system, pump base elbows, and access hatch are compatible with the replacement pumps and shall be reused. Staff solicited a quote from Electric Pump to complete this work. Electric Pump is the proprietary vendor for Flygt pumps which are in 39 of the 41 lift stations. Electric Pump is familiar with the city’s wastewater infrastructure and equipment, and has provided the equipment and service for our lift station rehabilitation projects for the past several years. It is the city’s desire to maintain uniformity in the pumps among all 41 lift stations. Having consistent systems, parts, and operational parameters in all the lift stations provides efficiency and effectiveness for future maintenance. Electric Pump submitted a quote in the amount of $41,685 to complete the proposed work. Staff recommend awarding a contract to Electric Pump in the amount of $41,685. FINANCIAL IMPACT: The Sewer CIP includes funding for annual lift station maintenance and has adequate funding for this project in 2026. ALTERNATIVES: 1. Motion and second as part of the consent agenda to adopt a resolution awarding the contract for the Shady Beach lift station pump replacement. 2. Motion and second to remove this item from the consent agenda for additional discussion. City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372 Item 5F Page | 2 ATTACHMENTS: 1. Resolution 2. Quote - Electric Pump 4646 Dakota Street SE Prior Lake, MN 55372 RESOLUTION 25- A RESOLUTION AWARDING THE CONTRACT FOR THE SHADY BEACH LIFT STATION PUMP REPLACEMENT Motion By: Second By: WHEREAS, sanitary lift stations are generally recommended for rehabilitaiton every 15-20 years; and WHEREAS, the Shady Beach lift station is 51 years old and the pumps were last replaced in 2004; and WHEREAS, Electric Pump, a reputable and experienced contractor in the industry that has completed previous lift station rehabilitation projects for the City, has submitted a quote in the amount of $41,685 to complete the pump replacement. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. The Mayor and City Manager are hereby authorized to enter into a contract with Electric Pump in the amount of $41,685 for the Shady Beach lift station pump replacement. 3. The funding for project will come from the Sewer Utility Fund. th Passed and adopted by the Prior Lake City Council this 9 day of December 2025. VOTE Briggs Braid Churchill Lake Hellier Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ ______________________________ Jason Wedel, City Manager 1 TO: City of Prior Lake, MN Phil Ryan / 763-461-8053 / pryan@priorlakemn.gov REF: Flygt Submersible Pump Replacement Shady Beach LS#20 DATE: November 19, 2025 Flygt Submersible Pumps & Accessories Two (2) Flygt NP3127-488HT submersible pump. Pump to be furnished with the following: • 10hp, 480V, 3phase, 60Hz, explosion proof motor • Hard Iron N-Impeller • 4” Discharge volute • 50’ Power cable • SS lifting chain with bow shackle Two (2) Flygt mini-cas for pump monitoring with 11-pin socket (DIN rail mounted) (shipped to Total Control Systems to install in their control panel) One (1) Lot of freight, installation, & startup service included Total Selling Price: $41,685.00 Note the following:  Price is good until June 1, 2026  Existing guide rail system, pump base elbows, and access hatch are compatible with this new replacement pump and shall be reused  Pump monitoring devices will be shipped to Total Control Systems.  Anything not specifically mentioned in this proposal is the responsibility of others Thank you for your consideration, Steven Forsythe C: 612-840-9499 E: sforsythe@electricpump.com cc: Justin Kirby 515-505-1578 201 4th Ave SW New Prague, MN 56071 Office: 952-758-6600 Toll Free: 800-536-5394 Fax: 952-758-7778 4280 E. 14th St. Des Moines, IA 50313 Office: 515-265-2222 Toll Free: 800-383-7867 Fax: 515-265-8079