Loading...
HomeMy WebLinkAbout05(H) - Resolution Receiving Bids and Awarding Contract for the Spring Lake and Raymond Lift Station Rehabilitation (2026-09) Report ITEM: 5H CITY COUNCIL AGENDA REPORT MEETING DATE: April 14, 2026 PREPARED BY: Christine Watson, Public Works Supervisor – Administration Phil Ryan, Public Works Supervisor – Utilities PRESENTED BY: Nick Monserud, Public Works Director/City Engineer AGENDA ITEM: Resolution Receiving Bids and Awarding Contract for the Spring Lake and Raymond Lift Station Rehabilitation (2026-09) RECOMMENDED ACTION: Adopt a resolution to receive bids and award the contract for the Spring Lake and Raymond lift station rehabilitation (2026-09). BACKGROUND: The City operates 41 sanitary lift stations that manage the wastewater conveyance into the Metropolitan Council system for treatment at the Blue Lake wastewater treatment plant in Shakopee. Most of these lift stations have two pumps that operate separately, although occasionally in unison when the system demands it. These lift stations are inspected weekly, cleaned at least twice annually, and inspected annually by a contracted professional in an effort to maximize the useful life of the components. The pumps and other control components are recommended for rehabilitation or replacement every 15-20 years. Both Spring Lake and Raymond lift stations were last rehabilitated in 2004. Based on the most recent inspection and the overall condition of the Raymond and Spring Lake lift stations, the following work is proposed: • Remove, reconfigure and re-install existing pumps and new pumps • Replace control panel, piping and valves • Adjust height and replace top slab of existing valve vault • Replace existing wet well top slabs and hatches • Install curb and gutter, along with minor site grading, to prevent intrusion of stormwater runoff This project was advertised for bidding and the following bids were received and publicly opened on March 26, 2026: Company Bid Minger Construction Co., Inc. $368,500 Krueger Excavating, Inc. $378,593 Pember Companies, Inc. $439,160 Lakehead Constructors, Inc. $505,271 City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372 Item 5H Page | 2 The low bid of $368,500 is 19% below the engineer’s estimate of $455,765 for construction. The total project cost is expected to be $618,520 as detailed below: Item Cost Engineering (work orders with AE2S) $124,240 Control panels (purchase approved Jan 13, 2026) $95,960 Pumps at Raymond lift station $29,820 Minger Construction Co. Inc. $368,500 Total project cost $618,520 AE2S, the city’s consulting engineer for this project, recommends awarding a contract in the amount of $368,500 to Minger Construction Co., Inc. to complete the noted improvements at the Spring Lake and Raymond lift stations. A recommendation letter is attached. FINANCIAL IMPACT: The estimated total project cost is $618,520 which includes the equipment, installation, and all engineering and consultant services. This is a planned improvement, with $720,000 included in the 2026 Sewer Utility CIP for this project (604-49450.00-55570.00-SWR26-000001). ALTERNATIVES: 1. Motion and second as part of the consent agenda to adopt a resolution to receive bids and award the contract for the Spring Lake and Raymond lift station rehabilitation (2026- 09). 2. Motion and second to remove this item from the consent agenda for further discussion. ATTACHMENTS: 1. Resolution 2. Recommendation Letter 4646 Dakota Street SE Prior Lake, MN 55372 RESOLUTION 26- A RESOLUTION RECEIVING BIDS AND AWARDING THE CONTRACT FOR THE SPRING LAKE AND RAYMOND LIFT STATION REHABILITATION (2026-09) Motion By: Second By: WHEREAS, lift station pumps and components are generally recommended for replacement or rehabilitation every 15-20 years; and WHEREAS, both Spring Lake and Raymond lift stations were last rehabilitated in 2004; and WHEREAS, based on the most recent inspection and the overall condition of the Spring Lake and Raymond lift stations, the following work is proposed:  Remove, reconfigure and re-install existing pumps and new pumps  Replace control panel, piping and valves  Adjust height and replace top slab of existing valve vault  Replace existing wet well top slabs and hatches  Install curb and gutter, along with minor site grading, to prevent intrusion of stormwater runoff; and WHEREAS, the project was advertised for bidding and the following bids were received and publicly opened on March 26, 2026: Company Bid Minger Construction Co., Inc. $368,500 Krueger Excavating, Inc. $378,593 Pember Companies, Inc. $439,160 Lakehead Constructors, Inc. $505,271 and WHEREAS, AE2S Inc., the city’s consulting engineer for this project, recommends awarding the contract to Minger Construction Co. Inc. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. The City Council authorizes a contract with Minger Construction Co., Inc. in the amount of $368,500 for the Spring Lake and Raymond lift station rehabilitation (2026-09). 3. Funding will come from the Sewer Utility Fund (604-49450.00-55570.00-SWR26-000001) th Passed and adopted by the Prior Lake City Council this 14 day of April 2026. VOTE Briggs Braid Churchill Lake Hellier Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ ______________________________ Jason Wedel, City Manager C:\\Users\\hsimon\\AppData\\Local\\Temp\\Report Attachment - 20260414 Receive Bids Award Contract LS Rehab - RESO_676722\\Report Attachment - 20260414 Receive Bids Award Contract LS Rehab - R.docx 2