ITEM: 5H
CITY COUNCIL AGENDA REPORT
MEETING DATE: April 14, 2026
PREPARED BY: Christine Watson, Public Works Supervisor – Administration
Phil Ryan, Public Works Supervisor – Utilities
PRESENTED BY: Nick Monserud, Public Works Director/City Engineer
AGENDA ITEM: Resolution Receiving Bids and Awarding Contract for the Spring
Lake and Raymond Lift Station Rehabilitation (2026-09)
RECOMMENDED ACTION:
Adopt a resolution to receive bids and award the contract for the Spring Lake and Raymond lift
station rehabilitation (2026-09).
BACKGROUND:
The City operates 41 sanitary lift stations that manage the wastewater conveyance into the
Metropolitan Council system for treatment at the Blue Lake wastewater treatment plant in
Shakopee. Most of these lift stations have two pumps that operate separately, although
occasionally in unison when the system demands it. These lift stations are inspected weekly,
cleaned at least twice annually, and inspected annually by a contracted professional in an effort
to maximize the useful life of the components. The pumps and other control components are
recommended for rehabilitation or replacement every 15-20 years. Both Spring Lake and
Raymond lift stations were last rehabilitated in 2004.
Based on the most recent inspection and the overall condition of the Raymond and Spring Lake
lift stations, the following work is proposed:
• Remove, reconfigure and re-install existing pumps and new pumps
• Replace control panel, piping and valves
• Adjust height and replace top slab of existing valve vault
• Replace existing wet well top slabs and hatches
• Install curb and gutter, along with minor site grading, to prevent intrusion of stormwater
runoff
This project was advertised for bidding and the following bids were received and publicly opened
on March 26, 2026:
Company Bid
Minger Construction Co., Inc. $368,500
Krueger Excavating, Inc. $378,593
Pember Companies, Inc. $439,160
Lakehead Constructors, Inc. $505,271
City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372
Item 5H
Page | 2
The low bid of $368,500 is 19% below the engineer’s estimate of $455,765 for construction. The
total project cost is expected to be $618,520 as detailed below:
Item Cost
Engineering (work orders with AE2S) $124,240
Control panels (purchase approved Jan 13, 2026) $95,960
Pumps at Raymond lift station $29,820
Minger Construction Co. Inc. $368,500
Total project cost $618,520
AE2S, the city’s consulting engineer for this project, recommends awarding a contract in the
amount of $368,500 to Minger Construction Co., Inc. to complete the noted improvements at the
Spring Lake and Raymond lift stations. A recommendation letter is attached.
FINANCIAL IMPACT:
The estimated total project cost is $618,520 which includes the equipment, installation, and all
engineering and consultant services. This is a planned improvement, with $720,000 included in
the 2026 Sewer Utility CIP for this project (604-49450.00-55570.00-SWR26-000001).
ALTERNATIVES:
1. Motion and second as part of the consent agenda to adopt a resolution to receive bids
and award the contract for the Spring Lake and Raymond lift station rehabilitation (2026-
09).
2. Motion and second to remove this item from the consent agenda for further discussion.
ATTACHMENTS:
1. Resolution
2. Recommendation Letter
4646 Dakota Street SE
Prior Lake, MN 55372
RESOLUTION 26-
A RESOLUTION RECEIVING BIDS AND AWARDING THE CONTRACT FOR THE SPRING
LAKE AND RAYMOND LIFT STATION REHABILITATION (2026-09)
Motion By: Second By:
WHEREAS, lift station pumps and components are generally recommended for
replacement or rehabilitation every 15-20 years; and
WHEREAS, both Spring Lake and Raymond lift stations were last rehabilitated in 2004;
and
WHEREAS, based on the most recent inspection and the overall condition of the Spring Lake
and Raymond lift stations, the following work is proposed:
Remove, reconfigure and re-install existing pumps and new pumps
Replace control panel, piping and valves
Adjust height and replace top slab of existing valve vault
Replace existing wet well top slabs and hatches
Install curb and gutter, along with minor site grading, to prevent intrusion of
stormwater runoff;
and
WHEREAS, the project was advertised for bidding and the following bids were received
and publicly opened on March 26, 2026:
Company Bid
Minger Construction Co., Inc. $368,500
Krueger Excavating, Inc. $378,593
Pember Companies, Inc. $439,160
Lakehead Constructors, Inc. $505,271
and
WHEREAS, AE2S Inc., the city’s consulting engineer for this project, recommends
awarding the contract to Minger Construction Co. Inc.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. The City Council authorizes a contract with Minger Construction Co., Inc. in the amount of
$368,500 for the Spring Lake and Raymond lift station rehabilitation (2026-09).
3. Funding will come from the Sewer Utility Fund (604-49450.00-55570.00-SWR26-000001)
th
Passed and adopted by the Prior Lake City Council this 14 day of April 2026.
VOTE Briggs Braid Churchill Lake Hellier
Aye
☐ ☐ ☐ ☐ ☐
Nay
☐ ☐ ☐ ☐ ☐
Abstain
☐ ☐ ☐ ☐ ☐
Absent
☐ ☐ ☐ ☐ ☐
______________________________
Jason Wedel, City Manager
C:\\Users\\hsimon\\AppData\\Local\\Temp\\Report Attachment - 20260414 Receive Bids Award Contract LS Rehab - RESO_676722\\Report Attachment - 20260414
Receive Bids Award Contract LS Rehab - R.docx 2