Loading...
HomeMy WebLinkAbout05(J) - Resolution Approving a Work Order for Engineering Services for the Police Station Parking Lot Improvements (2022-15) Report ITEM: 5J CITY COUNCIL AGENDA REPORT MEETING DATE: April 28, 2026 PREPARED BY: Christine Watson, Public Works Supervisor – Administration PRESENTED BY: Nick Monserud, Public Works Director/City Engineer AGENDA ITEM: Resolution Approving a Work Order for Engineering Services for the Police Station Parking Lot Improvements (2022-15) RECOMMENDED ACTION: Adopt a resolution approving a work order for engineering services for the Police Station parking lot improvements (2022-15). BACKGROUND: The 2030 Facilities CIP (F440) includes $300,000 for secured parking at the Police Station. This project was initially planned for 2025 but has been pushed back to 2030 to be completed after other proposed building improvements are completed in 2028 and 2029. Staff requested a proposal from WSB LLC, a member of the city’s consultant pool, to provide the following engineering services for this project: • Concept planning and cost estimating for secured parking on the south and east sides of the Police Station • Landscape screening options • Visualizations of proposed improvements • Project management and in-person meetings Staff have reviewed the proposal and recommend approving a work order with WSB in the amount of $32,319 to begin concept planning for the Police Station parking lot improvements that are proposed for 2030. FINANCIAL IMPACT: The 2030 CIP includes $300,000 for the construction phase of this project. The $32,319 cost for this work order will be paid in 2026 with the money that was unspent in 2025 and carried forward into 2026. ALTERNATIVES: 1. Motion and second as part of the consent agenda to adopt a resolution approving a work order for engineering services for the Police Station parking lot improvements (2022-15). 2. Motion and second to remove this item from the consent agenda for further discussion. ATTACHMENTS: 1. Resolution 2. Work Order City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372 4646 Dakota Street SE Prior Lake, MN 55372 RESOLUTION 26-xxx RESOLUTION APPROVING A WORK ORDER FOR ENGINEERING SERVICES FOR THE POLICE STATION PARKING LOT IMPROVEMENTS (2022-15) Motion By: Second By: WHEREAS, the parking lots on the south and east side of the Police Station are in need of pavement rehabilitation and enhanced security; and WHEREAS, this project was initially included in the 2025 CIP but has been pushed back to 2030 to be completed after other proposed building improvements are completed in 2028 and 2029; and WHEREAS, WSB LLC, a member of the City’s consultant pool, has submitted a proposal in the amount of $32,319 to provide the following engineering services:  Concept planning and cost estimating for secured parking on the south and east sides of the Police Station  Landscape screening options  Visualizations of proposed improvements  Project management and in-person meetings and WHEREAS, staff have reviewed the proposal and recommend approving this work order. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. The City Council approves a work order with with WSB LLC for the Police Station parking lot improvements (2022-15). 3. The cost of this work order shall be paid with unspent money that was carried forward from the 2025 CIP. th Passed and adopted by the Prior Lake City Council this 28 day of April 2026. VOTE Briggs Braid Churchill Lake Hellier Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ ______________________________ Jason Wedel, City Manager Page 1 of 2 Public Works Consultant Pool Work Order Police Station Secured Parking (2022-15) WSB & ASSOCIATES, INCORPORATED, dba WSB LLC This work order (“Work Order”) is issued on this 28th day of April, 2026 by the City of Prior Lake (“City”) pursuant to the Public Works Consultant Pool – Master Agreement dated April 20, 2020 and as amended February 24, 2025 (“Contract”) between the City and WSB & Associates, Incorporated, dba WSB LLC (“Consultant”). Based on the mutual promises and covenants set forth herein, the sufficiency of which are hereby acknowledged, the City and Consultant agree as follows: 1.Scope of Work Order. Consultant agrees to provide, perform and complete all the services requested by the City in this Work Order and attached Exhibit 1 (“Work”), which Work shall be subject to the terms and conditions of this Work Order and the Contract. 2.Term of Work Order. All Work requested by this Work Order shall be completed by December 31, 2026. 3.Compensation for Work Order. City agrees to pay the Consultant an amount not to exceed $32,319 as full and complete payment for the Work requested by this Work Order. 4.Consultant Representative. Consultant has designated Monica Heil to manage the Work Order subject to the supervision of Consultant’s representative. ISSUED BY CITY OF PRIOR LAKE ___________________________________ Mayor ___________________________________ City Manager RECEIVED AND ACCEPTED BY WSB LLC _____________________________________ Signature ____________________________________ Title Page 2 of 2 Exhibit 1 – Scope of Work Order G:\.Clients All\Prior Lake\Proposals\2026 Downtown Secured Parking Lot Options Update\WSB 2026 Downtown Secured Parking Concept Updates Proposal.docx 7 0 1 X E N I A A V E N U E S | S U I T E 3 0 0 | M I N N E A P O L I S , M N | 55 4 1 6 | 7 6 3 . 5 4 1 . 4 8 0 0 | W S B E N G . C O M February 17, 2026 Mr. Nick Monserud, PE Director of Public Works/City Engineer City of Prior Lake 17073 Adelmann St. SE Prior Lake, MN 55372 Re: Supplemental Agreement to Provide Professional Engineering Services Downtown Secured Parking Lot Improvements Concept Updates Dear Mr. Monserud: WSB is pleased to provide you with our proposal for professional services for the preparation of updated concept plans and cost estimating services for the City’s Downtown Secured Parking Lot Improvements Concept Planning Project. Scope of Services WSB’s scope of services will include concept planning for secured police officer parking stalls adjacent to the existing Police Department building. The general area to be evaluated with concept planning is shown below: Downtown Parking Lot Area EXHIBIT 1 Mr. Nick Monserud February 17, 2026 Page 2 G:\.Clients All\Prior Lake\Proposals\2026 Downtown Secured Parking Lot Options Update\WSB 2026 Downtown Secured Parking Concept Updates Proposal.docx The following list of tasks is proposed to summarize our understanding of the work after conversations with you and Police Department staff : Task 1: Concept Planning and Cost Estimating for Enclosed Parking to the South Using aerial photographs and LIDAR data, WSB will prepare up to two conceptual layout plans showing parking lot concepts that: • Provides an option to extend fencing from the building corners to the existing parking stalls on the south side of the Police Department building that encloses those existing parking stalls and the entrance to the Sally Port and provides two gate locations on the south side of the building. • Provides option to extend fencing from the building corners to the south side of the Police Department building and expands the parking area on the south side of the building to provide additional secured parking for Police Department staff and a secure en trance to the Sally Port with two gate locations. o Construction of such an enclosed area is anticipated to require: ▪ Relocation of the existing sidewalk that runs east-west south of the PD facility if the sidewalk along CSAH 21 is not deemed acceptable as an alternate route to connect Arcadia to the downtown parking areas. ▪ Relocation of the landscaping, including personalized paver blocks and the flag poles south of the PD building. ▪ Review of the existing water quality facility in the NE corner of CASH 21/Acadia Avenue and additional water quality needs for any new impervious surface areas created with the parking lot project. ▪ Coordination of the existing screened trash enclosure with the proposed fence. Task 2: Concept Planning and Cost Estimating for Enclosed Parking to the East WSB will also evaluate and provide a cost estimate to enclose the existing downtown parking area east of the Police Department Building. Fence installations adjacent to existing sidewalks will be reviewed for ADA compliance and maintenance activities. It is assumed that only one gate for ingress/egress will be considered at the existing entrance to this parking area. Task 3: Landscape Screening Options Landscaping improvements will also be evaluated in conjunction with the fencing installation to mitigate aesthetic concerns surrounding the fence. A plan view planting figure showing the planting style concept, typical elevations and cost estimates will be included with this task. Task 4: Visualizations/Elevations of Concept Improvements WSB will provide visualizations of the proposed fence and landscape improvements using photo imagery of the existing Police Department building. The visualizations will depict the size and scale of the proposed fence and landscaping improvements relative to the do wntown buildings and parking lots as seen from Dakota Street and CSAH 21. Task 5: Project Management WSB will provide project management services throughout the duration of the project. This includes an estimated three (3) in-person meetings with Public Works and Police Department Staff to review concepts and final deliverables. Mr. Nick Monserud February 17, 2026 Page 3 G:\.Clients All\Prior Lake\Proposals\2026 Downtown Secured Parking Lot Options Update\WSB 2026 Downtown Secured Parking Concept Updates Proposal.docx Assumptions Based on our understanding of the project and discussions with you, our scope and fee estimate assumes: • Coordination with and recommendations from the City’s Public Department regarding fence and gate type for elevation renderings and cost estimating purposes. • City staff will provide guidance on necessity of the existing water quality feature located in the NE corner of the intersection of CSAH 21 and Arcadia Avenue. • City staff will provide guidance on the availability of water quality credits to offset any new water quality needs created with the project. • No geotechnical evaluation will be completed as a part of this project. Earthwork and quantity estimations for parking lot expansion activities will assume common fill placement for expansion of the parking lot area. • No topographic survey work will be completed as a part of this project. It is recommended a complete topographic survey be collected before proceeding with final design. • Public engagement regarding parking lot changes has not been included in our estimate. WSB can provide a separate proposal for meetings with downtown business owners it that service is desired as a part of this project. Schedule/Work Plan March, 2026: WSB proposes to begin work with a kick-off meeting with City Staff to review the two parking lot expansion scenarios, fence types and gate options. WSB will then develop a concept plan view renderings of each option and details for fence, gate and landscape options. Late April/Early May 2026: WSB proposes to again meet with City Staff to review the concept plan views and details to obtain any comments prior to completing cost estimates for each concept along with elevation renderings of the fence and landscaping improvements from Dakota Street and CSAH 21. May/June 2026: Final WSB/City Staff meeting to view final concept plans, elevation renderings and cost estimates ahead of City Staff presentation to Council for future budget considerations. Compensation Summary Our fees for the scope of services is proposed on an hourly basis, estimated as summarized below. The fee estimate is provided in a detailed format on the enclosed Estimated Project Fees Worksheet. ▪ Task 1: Concept & Estimating for Enclosed Parking to South $ 11,764.00 ▪ Task 2: Concept & Estimating for Enclosed Parking to East $ 8,110.00 ▪ Task 3: Landscape Screening Options $ 3,340.00 ▪ Task 4: Visualizations/Elevations of Concept Improvements $ 5,031.00 ▪ Task 5: Project Management $ 4,074.00 TOTAL $ 32,319.00 Mr. Nick Monserud February 17, 2026 Page 4 G:\.Clients All\Prior Lake\Proposals\2026 Downtown Secured Parking Lot Options Update\WSB 2026 Downtown Secured Parking Concept Updates Proposal.docx The proposed scope and fee presented herein represents our complete understanding of the project based on site visits and discussions with City staff. All work will be completed in accordance with our Professional Services Agreement with the City date April 20, 2020. If you have any questions or concerns, please feel free to contact me at (952) 843-8323. Once again, we appreciate the opportunity to submit this proposal and look forward to working with you and your staff. Sincerely, WSB Monica Heil, P.E. Senior Vice President, Municipal Attachment Task Description 1 1.1 Concept Layout 4 8 24 36 $6,812.00 1.2 Cost Estimating 2 4 8 14 $2,786.00 1.3 Preferred Concept Rendering 2 4 4 10 $2,166.00 Task 1 Total Estimated Hours and Fee 8 16 36 60 $11,764.00 2 2.1 Concept Layout 4 4 8 16 $3,368.00 2.2 Cost Estimating 2 2 6 10 $1,994.00 2.3 Preferred Concept Rendering 4 4 4 12 $2,748.00 Task 2 Total Estimated Hours and Fee 10 10 18 38 $8,110.00 3 3.1 4 4 8 $1,140.00 3.2 Details 1 1 $172.00 3.2 Cost Estimating 2 2 4 2 10 $2,028.00 Task 3 Total Estimated Hours and Fee 2 2 4 7 4 19 $3,340.00 4 4.1 1 2 10 13 $1,903.00 4.2 CSAH 21 Concept 1 2 10 13 $1,903.00 4.3 Final Renderings 1 2 4 7 $1,225.00 Task 4 Total Estimated Hours and Fee 3 6 24 33 $5,031.00 5 5.1 8 8 $2,328.00 5.2 Kick Off Meeting with City Staff 2 2 $582.00 5.3 Concept Plan Review and Cost Estimate Meeting 2 2 $582.00 5.4 Final Rendering and Deliverable Meeting 2 2 $582.00 Task 5 Total Estimated Hours and Fee 14 14 $4,074.00 Total Estimated Hours 37 34 58 7 28 164 $32,319.00 Average Hourly Billing Rate 291.00 241.00 155.00 172.00 113.00 TOTAL PROJECT COST $32,319.00 Concept Planning and Cost Estimating for Enclosed Parking to the East Project Manager/Lead Designer Landscape Designer Tyler Powers Graduate Engineer Erik DeSmith Landscape Architect Laura Detzler Estimate of Cost City of Prior Lake, Minnesota Professional Engineering Services Downtown Secured Parking Lot Improvements Concept Planning CostTotal Hours Senior Project Manager Emily Brown Concept Planning and Cost Estimating for Enclosed Parking to the South Plan Layout Monica Heil Landscape Screening Options Visualizations/Elevations of Concept Improvements Dakota Street Concept Project Management Project Management